Agency: | |
---|---|
State: | South Carolina |
Type of Government: | Federal |
Category: |
|
Posted: | Oct 30, 2023 |
Due: | Nov 16, 2023 |
Publication URL: | To access bid details, please log in. |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
***** This is a REQUEST FOR INTEREST ONLY! This request does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this request is to identify potential offerors for market research purposes only. *****
Request for Information (RFI)
Revised 10/30/23 to change the scope summary below.
Savannah River Nuclear Solutions, LLC (SRNS), which manages and operates portions of the Savannah River Site (SRS) under a Department of Energy (DOE) prime contract, solicits expressions of interest from potential suppliers with a background in fabrication of approximate 4-inch Bundles/Aluminum tubes with lids.
This RFI is issued to assist with finding potential suppliers interested in this solicitation.
The SRS is located approximately 15 miles south of Aiken, South Carolina and is 310 contiguous square miles.
Scope Summary: Provide labor, materials, welding, and services required for the fabrication, inspection, documentation, and delivery for the following:
4.13-inch square bundle tubes, length 136.68-inches, and lid – estimated quantity 60.
4.61-inch square bundle tubes, length 136.80-inches, and lid – estimated quantity 20.
4.00-inch round bundle tubes, length 136.69-inches, and lid – estimated quantity 80.
These bundle design consist of a bundle, bottom plate, and cone:
The bundle lids consist of a ring, base plate, locking rod/s, and bail:
A gauge will be provided to the supplier for each bundle size, to ensure the internal measurement is met.
A supplier's response to the RFI does not guarantee they will be selected to participate in the Request for Proposal (RFP).
Suppliers responding to this RFI shall include evidence of the following:
E-mail response addressing Items 1 through 7 above shall be submitted by 5:00 p.m. est. on 11/16/23 to Barbara McCarty at barbara.mccarty@srs.gov.
With GovernmentContracts, you can:
...Ad Title: Aluminum Pipe 2024 Purchasing Agent/Entity: City of Myrtle Beach Ad Publish ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/22/2024
...Dutcher Email: bids@keckwood.com Telephone: 803-768-5200 Description: Upgrade to existing stormwater pipe... underneath Taylor ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/13/2024
...brass goods, repair clamps, service saddles, pipe, pipe fittings, hydrants, meter boxes and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/24/2024
...) of 8-inch ductile iron pipe (DIP) water main, ~3,000 linear feet (lf) ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/23/2024