Agency: | HOMELAND SECURITY, DEPARTMENT OF |
---|---|
State: | Massachusetts |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 24, 2024 |
Due: | Apr 28, 2024 |
Solicitation No: | 31125PR240000138 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Questions asked: Time frame for completion? - 24-30 days. Weekly Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. Are pictures or plans available? No.
The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units:
SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted.
Exterior doors (aluminum): White latex paint
Interior doors: Eggshell
Walls: Eggshell
Trim: Eggshell
Ceiling: Flat ceiling white
Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint).
**SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS
Apr 10, 2024 | [Combined Synopsis/Solicitation (Original)] Paints and Floors work for govt owned housing |
Apr 26, 2024 | [Combined Synopsis/Solicitation (Updated)] Paints and Floors work for govt owned housing |
With GovernmentContracts, you can:
...of Upcoming Grant Opportunity Coastal resiliency and storm water improvements @ Plymou Bid ...
Commonwealth of Massachusetts
Bid Due: 6/04/2024
...of work includes consists 550 linear feet of 12-inch HDEP storm drainage, 11 ...
Commonwealth of Massachusetts
Bid Due: 5/23/2024
...01854 Bulletin Desc: CL24-EM-0030 South Campus Plaza Improvements including storm drainage upgrades...
Commonwealth of Massachusetts
Bid Due: 5/07/2024
...for Slocum Street Infrastructure Improvements for drinking water, storm drain, and streetscape improvements... ...
Commonwealth of Massachusetts
Bid Due: 5/23/2024