CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDA

Agency:
State: Federal
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Posted: Mar 7, 2024
Due: May 6, 2024
Publication URL: To access bid details, please log in.
Follow
CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDA
Active
Contract Opportunity
Notice ID
W912EP24R0001
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
SAD
Office
W074 ENDIST JACKSNVLLE
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Mar 07, 2024 02:26 pm EST
  • Original Response Date: May 06, 2024 02:00 pm EDT
  • Inactive Policy: Manual
  • Original Inactive Date: Mar 07, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1KB - CONSTRUCTION OF CANALS
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
Description
TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal. The structures will be constructed in the L- 29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station. The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3). Specific major project components include the following items:1.        A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.2.        A new pump station structure has a total pumping capacity of 1,250 cubic feet per second (cfs) that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.3.        A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.4.        Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station5.        The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal. The estimated period of performance is 2548 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided on a later date.***PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government utilizing the Best Value Tradeoff Process. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. A fourth non-price factor will be assessed by the Government: namely, the submission of a Project Labor Agreement. The anticipated magnitude of construction per DFARS 236.204 is between $100,000,000 and $250,000,000.THIS SOLICITATION IS UNRESTRICTED. This solicitation will issued on or about Friday, 22 March 2024 with receipt of proposals on or about Monday, 06 May 2024. Solicitation will be issued in electronic format only and will be posted on the Procurement Integrated Enterprise Environment (PIEE) website. The PIEE website can be found at https://piee.eb.mil/In order to receive notification of any amendments to the solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the sam.gov website. If you are not registered, the Government is not responsible with providing you with notification of any changes to the solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from the solicitation. The SAM website can be located at https://sam.gov.The Pre-proposal Conference information will be provided with the solicitation posting.
Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 701 SAN MARCO BLVD
  • JACKSONVILLE , FL 32207-0019
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 07, 2024 02:26 pm ESTPresolicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Z--CRIP Main Canal Check MC185, MC270, MC420 Active Contract Opportunity Notice ID... ...

INTERIOR, DEPARTMENT OF THE

Bid Due: 5/15/2024

...Follow Z--CRIP Main Canal Check MC185, MC270, MC420 Construction Active Contract Opportunity... of ...

INTERIOR, DEPARTMENT OF THE

Bid Due: 5/15/2024

...walls on both the intake and discharge sides, and along the south side ...

DEPT OF DEFENSE

Bid Due: 10/24/2024

...of paint loss and/or corrosion at the Bourne Bridge over the Cape Cod ...

DEPT OF DEFENSE

Bid Due: 5/14/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.