OR-KLAMATH FALLS FWO-PHASE 5 CONSTRUCTION
Agency: |
INTERIOR, DEPARTMENT OF THE |
State: |
Federal |
Type of Government: |
Federal |
Category: |
- Y - Construction of Structures and Facilities
|
Posted: |
Apr 8, 2024 |
Due: |
Apr 29, 2024 |
Solicitation No: |
140FC324R0008 |
Publication URL: |
To access bid details, please log in. |
Y--OR-KLAMATH FALLS FWO-PHASE 5 CONSTRUCTION
Active
Contract Opportunity
Department/Ind. Agency
INTERIOR, DEPARTMENT OF THE
Sub-tier
US FISH AND WILDLIFE SERVICE
Office
FWS, CONSTRUCTION A/E TEAM 3
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Sources Sought (Original)
-
All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
-
Original Published Date: Apr 08, 2024 09:41 am CDT
-
Original Response Date: Apr 29, 2024 02:00 pm CDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Jun 03, 2024
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
-
237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Description
Klamath Falls New Hatchery Phase 5 will add earthen lined aquaculture ponds to the site to increase the capabilities of the sucker fish hatchery. This phase of the project includes a 0.30 acre earthen, lined pond for water storage known as the Head Pond, and up to three earthen, lined ponds for aquaculture with harvest kettle structures built into their berms, water supply, and drainage. The aquaculture ponds will typically be 5 to 7 feet deep with berms that are 6 to 12 feet tall and vary in size from 1/12-acre to 1/2-acre. Supply pipelines, drainage pipelines and access roads will be constructed around each of the ponds. Phase 5 will also include re-routing of approximately 415 feet of 8-inch diameter geothermal supply (GS) pipeline.
Construction work needed to facilitate the project includes excavation, fill placement, grading, temporary erosion and sedimentation control, permanent seeding, pond liners, elevated bird predation netting system, cast-in-place concrete structures, paving and crushed rock road surfacing, pressurized pipelines for geothermal water distribution, and gravity pipelines for drainage.
Through this sources sought, USFWS is also seeking industry feedback on the proposed design. We are looking for industry recommended best practices that should be included in our design package and if there are any issues with the design that would present challenges to construction.
Attachments/Links
Contact Information
Contracting Office Address
-
FWS, Construction A/E Team 3 5275 Leesburg Pike
-
Falls Church , VA 22041
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...retaining structure, structural excavation and backfill, steel pipe, or concrete piling, reinforced...
Federal Agency
Bid Due: 9/30/2024
...of a new temporary access road, ramps, temporary retaining structure, structural excavation...
Federal Agency
Bid Due: 9/30/2024
.... Additional land-based construction may include bank grading and dressing, excavation, placement...
Federal Agency
Bid Due: 9/30/2024
...grading and dressing, excavation, placement of crushed stone blanket, riprap upper bank paving...
Federal Agency
Bid Due: 9/30/2024
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.