Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Minnesota |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 4, 2024 |
Due: | Apr 16, 2024 |
Solicitation No: | 12445524B0002 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The purpose of amendment 0002 is to change bidopening date, period of performance and add a provision for bridge use during winter months.
The purpose of this amendment is to clarify bid opening time and date.
This is a total Small Business Set Aside under NAICS code 237310 size standard $45M.
Bid opening will be held at Superior National Forest Supervisors Office, 8901 Grand Ave. Place, Duluth, MN 55808 at time and date specified on Invitation for Bids.
The intent of this contract is to provide for replacement of three trail bridges in the Superior National Forest: Pincushion
Mountain Loop Bridge #2 Replacement @ MP 2.143, Pincushion Mountain Loop Bridge #6 Replacement @ MP 0.545, and
Caribou Snowmobile Trail No. 91044 over Noname Creek Bridge Replacement @ MP 10.556. The project will include
traffic control monitoring; demolition and removal existing bridges, furnish and install new timber abutments and wing
walls and all associated hardware; furnish and install rip rap, backfill and geotextile drainage material for cribbing; furnish
and place aggregate; install permanent bridge signs and object markers; furnish and install timber superstructure –
including dowel-laminated deck system, curb/railing systems, deck wearing surface (where designated) and all associated
hardware; approach rail system and all associated hardware where designated; seed and mulch all disturbed areas; and
protect the waterways and associated wetlands from siltation and other destructive impacts of construction.
Mar 25, 2024 | [Solicitation (Updated)] Superior National Forest Trail Bridges |
Apr 16, 2024 | [Solicitation (Updated)] Superior National Forest Trail Bridges |
With GovernmentContracts, you can:
...of dam embankment, with associated borrow ditch and drainage ditch. The reach includes ...
Federal Agency
Bid Due: 4/30/2024
...and install rip rap, backfill and geotextile drainage material for cribbing; furnish and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 4/29/2024
...of 5.8 miles of dam embankment, with associated borrow ditch and drainage ditch. ...
DEPT OF DEFENSE
Bid Due: 5/02/2024
...borrow ditch and drainage ditch. The reach includes four road crossings over the ...
DEPT OF DEFENSE
Bid Due: 5/07/2024