Agency: | DEPT OF DEFENSE |
---|---|
State: | Rhode Island |
Type of Government: | Federal |
Category: |
|
Posted: | Feb 2, 2023 |
Due: | Feb 8, 2023 |
Solicitation No: | N6660423Q0030 |
Publication URL: | To access bid details, please log in. |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
See attached RFQ text document.
__________________________________________________________
Amendment 1 - 31 January, 2023
This Amendment is to answer an industry question:
Question: "Please confirm that this solicitation is for penetrator 7502540-5. The statement of work did not seem to designate which of the penetrators is required."
Answer: Confirmed, this requirement is only for the "-5" configuration.
__________________________________________________________
Amendment 2 – 2 February, 2023
This Amendment is to answer an industry question:
Question: "You've provided two statement of works: one for non nuke L1 and one for non SS material. Isn't this penetrator considered Level 1 so we should go by Appendix A, correct?"
Answer: Appendix A calls out the MINIMUM STANDARD QUALITY CONTRACT REQUIREMENTS FOR MATERIAL PROCUREMENT, MODIFICATION, REPAIR OR OVERHAUL OF MATERIAL that are Non-Nuclear Level I. (emphasis in original)
Appendix F calls out the MINIMUM STANDARD QUALITY CONTRACT REQUIREMENTS FOR MATERIAL PROCUREMENT, MODIFICATION, REPAIR OR OVERHAUL OF MATERIAL that are Non-Level SUBSAFE boundary material. (emphasis in original)
Many of the components used in EHFs are both SUBSAFE and Level 1, but there are components that are only SUBSAFE. Due to the SUBSAFE and Level I designations, the minimum quality standards must be strictly adhered to. The SOW in section C is the SOW, and Appendix A and Appendix F are applicable documents that complement the SOW by setting the minimum quality standards when working with the Level I and SUBSAFE components.
Jan 27, 2023 | [Combined Synopsis/Solicitation (Original)] SUBSAFE Electrical Hull Fitting Procurement |
Jan 31, 2023 | [Combined Synopsis/Solicitation (Updated)] SUBSAFE Electrical Hull Fitting Procurement |
Feb 3, 2023 | [Combined Synopsis/Solicitation (Updated)] SUBSAFE Electrical Hull Fitting Procurement |
With GovernmentContracts, you can:
Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity
State Government of Rhode Island
Bid Due: 6/28/2024
Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity
State Government of Rhode Island
Bid Due: 6/30/2024
Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity
State Government of Rhode Island
Bid Due: 5/24/2024
Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity
State Government of Rhode Island
Bid Due: 5/07/2024