Agency: | DEPT OF DEFENSE |
---|---|
State: | Oklahoma |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 9, 2024 |
Due: | Apr 29, 2024 |
Solicitation No: | 832468504 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Added "RFI 832468504 Generators R0" document to Attachments/Links section.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Amendment 1 - Proposal due date extended to April 29, 2024. Added attachment, Site Visit Sign In Sheet HC102824R0026.
Added attachment, Site OKC GPS Photos.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
You must submit a Document Access request. The Access Request Link is located below the Attachments/Links header. You must be logged in and a registered user within your organization.
The Emergency Backup Generator Paralleling Switchgear (GPS) serving the Oklahoma City, OK (OKC) DC has aging components that are no longer serviceable. The outcome of this project will provide DISA with a complete installation package supporting the GPS at OKC. The scope of this work includes, but not limited to submittals, permits and approvals, equipment, installation, GPS programming modifications, equipment upgrades, integration, documentation, PVT, training, and turnover. The Building Automation System will be modified to support the GPS upgrades and tested to ensure the GPS system status and alarms provide the same functionality as prior to the modifications. The existing UPS synchronizing circuit in the Uninterruptable Power Supply (UPS) Switchgear (SWGR) that checks for synchronization between generator and utility source was never properly documented. To fill this gap, it will be documented, demonstrated, and training provided to site personnel.
Questions should be addressed to john.m.ross138.civ@mail.mil. Please provide any questions, in writing, no later than April 19, 2024, at 2:00pm (CST). The Government reserves the right to not answer questions submitted after this time.
Mar 20, 2024 | [Combined Synopsis/Solicitation (Updated)] OKC Generator Control System Upgrade |
With GovernmentContracts, you can:
...Open Cabling, Door Access Control, and Audio-Visual Time & Materials (FY25 Tulsa) Cabling..., ...
Oklahoma State University
Bid Due: 5/17/2024
...; Parking Garage (CMAR)- Package #8 Signage, AV/Comm., Sec. Access Control) Issue Date ...
City of Edmond
Bid Due: 5/07/2024
...Garage (CMAR)- Package #8 Signage, AV/Comm., Sec. Access Control) Issue Date & Time ...
City of Edmond
Bid Due: 5/07/2024
...; Parking Garage (CMAR)- Package #8 Signage, AV/Comm., Sec. Access Control) Issue Date ...
City of Edmond
Bid Due: 5/09/2024