USCGC OAK Man Lift Rental

Agency: HOMELAND SECURITY, DEPARTMENT OF
State: Rhode Island
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Posted: Apr 23, 2024
Due: Apr 30, 2024
Solicitation No: 70Z08524P0004482
Publication URL: To access bid details, please log in.
Follow
USCGC OAK Man Lift Rental
Active
Contract Opportunity
Notice ID
70Z08524P0004482
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
  • Original Published Date: Apr 23, 2024 10:50 am PDT
  • Original Date Offers Due: Apr 30, 2024 08:00 am PDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: May 15, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    Newport , RI 02841
    USA
Description

STATEMENT OF WORK (SOW) FOR USCGC OAK Man Lift Rental USCGC OAK requires the rental services of a man lift to repair components located on the ships main mast and in need of services outlined in this statement of work. 1.0 GENERAL 1.1 BACKGROUND The 225’ WLB asset, USCGC OAK, has failed halyards located on the ships main mast that require replacement with use of a man lift. 1.2 SCOPE The scope of this contract is defined by the efforts and tools required to support USCGC OAK (WLB 211). The Contractor shall provide all labor, materials, and tools necessary to elevate a 2 man work team to the location of the failed halyards on the ships main mast, approximately 100’ vertically and 50’ horizontally. 1.3 OBJECTIVE The goal is to provide man lifting services to the CGC OAK to facilitate the repair of failed halyards located on the ships main mast, approximately 100’ above ships main deck. 1.4 APPLICABLE DOCUMENTS 1.4.1 Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020, General Requirements 2.0 SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC OAK (WLB 211) in NAVSTA Newport, Newport RI. 2.1 Man Lift Rental and Service The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. 2.1.1 The Contractor shall deliver an appropriately sized/rated man lift to the CGC OAK homeport in Newport RI. 2.1.2 The Contractor shall provide all personnel necessary to operate the man lift properly and safely. LAST UPDATED: 03/17/2023 PAGE 2/3 2.1.3 The contractor shall operate the man lift in a manner that allows CG personnel to repair the faulty halyards safely and appropriately. 3.0 CONTRACTOR PERSONNEL 3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 4.0 OTHER APPLICABLE CONDITIONS 4.1 PERIOD OF PERFORMANCE The period of performance for this contract shall not exceed 60 calendar days from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC OAK home port at NAVSTA Newport, Newport RI 02841,unless an alternate location is approved by the Coast Guard. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Officer (EO) as scheduling is subject to ship’s operations. 4.4 TRAVEL Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications). 5.0 GOVERNMENT FURNISHED RESOURCES NA LAST UPDATED: 03/17/2023 PAGE 3/3 6.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. 7.0 GOVERNMENT ACCEPTANCE PERIOD The EO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EO will send an e-mail to the Contractor notifying it that the deliverable has been accepted. 8.0 DELIVERABLES The Contractor shall provide a trip report IAW 2.2 of this SOW


Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Apr 23, 2024 10:50 am PDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity

State Government of Rhode Island

Bid Due: 5/15/2024

Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity

State Government of Rhode Island

Bid Due: 5/17/2024

Zuccolo Recreation Center Roof Replacement (RFP PLANS)

City of Providence

Bid Due: 5/20/2024

Info Opening Time Solicitation Number Solicitation Status Bid Title Posting Group Posting Entity

State Government of Rhode Island

Bid Due: 5/21/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.