Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Idaho |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 16, 2024 |
Due: | May 1, 2024 |
Solicitation No: | 1202L3 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The project consists of preparing pits, mining materials, crushing pit material into blended aggregate with commercial source additives meeting contract requirements and performing the following:
NOTE: Aggregate items shall utilize Blind Summit Pit or another approved source by the CO, including commercial source(s).
** “Up to” items are subject to availability of funds and not to exceed the quantity listed in the SCHEDULE OF ITEMS.
Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56.
Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs).
Surface to the compacted depth specified in the attached road logs the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor.
Protect the environment and resources impacted by all construction activity according to
With GovernmentContracts, you can: