Agency: | TRANSPORTATION, DEPARTMENT OF |
---|---|
State: | Arizona |
Type of Government: | Federal |
Category: |
|
Posted: | Mar 27, 2024 |
Due: | Mar 28, 2024 |
Solicitation No: | 6982AF24B000004 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT NUMBER: AZ FLAP NAV FR136(1)
PROJECT NAME: Joe Tank Road – 151604NAV1361
PROJECT DESCRIPTION:
Joe Tank Road (FR136) provides access to the Los Caballos Trailhead and to Apache-Sitgreaves National Forest. The Project is northwest of Show Low, Arizona in Navajo County. The Project is accessed from North Clark Road (AZ-260) about two miles northwest of West Deuce of Clubs Avenue in Show Low. The project extends 0.6 miles west along Joe Tank Road past the Los Caballos Trailhead #638 in the Apache-Sitgreaves National Forest. There is a base Schedule (0.32 miles) and an Option (0.28 miles).
SCOPE OF THE WORK:
The project scope includes providing a wider roadway bench and paved shoulders for approximately 0.6 miles from State Route (SR) 260 to Apache-Sitgreaves National Forest (ASNF) land. The improvements will consist of the removal of the existing asphalt surface and base material and the construction of a new roadway structural section, including new aggregate base and a new asphalt surface. The Project will provide a new paved surface, ditch construction or reconditioning to improve drainage, extending, or replacing culverts, the replacement of a cattle guard, minor City of Show Low utility valve box and manhole adjustments and the installation of new street signage. The existing roadway bench width of approximately 20 feet is proposed to be widened to 24 feet, allowing for curb and curb and gutter on both sides of Joe Tank Road.
Access to all approach roads within the project limits must be maintained during construction.
PRINCIPAL WORK ITEMS (Totals reflect base Schedule plus Option):
• 4,500 cubic yards of roadway excavation
• 5,000 tons of roadway aggregate
• 1,900 tons of asphalt concrete pavement
• 6,600 linear feet of curb and curb and gutter
• 1,150 linear feet of pipe culvert, 3 manholes and 3 inlets
• 125 cubic yards of rip rap
ANTICIPATED SCHEDULE: Advertisement Late February 2024; Award Late March 2024; Construction May 2024 through August 2024.
The estimated bid range is between $2,000,000 and $5,000,000.