Agency: | DEPT OF DEFENSE |
---|---|
State: | New York |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 25, 2024 |
Due: | May 2, 2024 |
Solicitation No: | W912DS24B0003 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance
dredging and beach nourishment of Fire Island Inlet and Shores Westerly to Jones Inlet Beach
Erosion Control and Navigation Project, New York. The work consists of dredging the Fire Island
Inlet Federal Navigation channel and deposition basin with subsequent placement of the dredged sand
as nourishment along the designated feeder beach (Gilgo Beach, Suffolk County, New York).
The proposed dredging and beach nourishment work would involve dredging and placement of
approximately 700,000 to 1,000,000 CY of sand at Gilgo Beach, subject to available funding. The
project is scheduled to be dredged to a depth of 14 feet plus 2 feet allowable over-depth.
The purpose of the proposed work is to alleviate the effects of shoaling and maintain the project
dimensions, thereby providing safe and economical use of the Fire Island Inlet waterway by
commercial and recreational boating interests while providing beneficial use of the dredged sand.
Between maintenance operations, the bypassed sand placed at the feeder beach would be carried by
littoral drift to feed down drift beaches. The maintenance operation would thus serve to place sand
trapped in the channel back into the normal littoral movement that naturally replenishes the
western beaches, while maintaining a safe channel for navigation.
The proposed work can be accomplished by large pipeline dredge and must meet US Coast Guard
criteria for an “ocean going vessel”.
The Contractor will be required to commence work within five (5) calendar days after the date of
receipt by him of the notice to proceed, and to prosecute said work diligently and to complete the
basic work ready for use not later than ninety-seven (97) calendar days after the receipt by him of
the notice to proceed (NTP). The contractor is required to
maintain an integrated production of at least 13,500 cubic yards per calendar day.
The work is estimated to cost between $15,000,000 and $50,000,000. Plans and specifications for
the subject project would be available in March 2024, with bid opening in April 2024. It is the
intention of the government to award in May and NTP in first week of October 2024.
Liquidated Damages of $2,390.00 per calendar day of delay will be assessed to the contractor until
all work under the contract is accepted as complete.
This is an unrestricted Procurement.
Apr 16, 2024 | [Solicitation (Updated)] Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project |
Apr 17, 2024 | [Solicitation (Updated)] Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project |
Apr 22, 2024 | [Solicitation (Updated)] Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project |
Apr 23, 2024 | [Solicitation (Updated)] Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project |
Apr 26, 2024 | [Solicitation (Updated)] Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project |
May 1, 2024 | [Solicitation (Updated)] Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project |
With GovernmentContracts, you can:
Follow Repair/Replace Overhead Cranes on Fort Drum Active Contract Opportunity Notice ID W911S224UOHCR
Federal Agency
Bid Due: 11/13/2028
Issue Date: 11/21/2023 Contract Number: PON 4701 Low Carbon Pathways for Multifamily Buildings
The New York State Contract Reporter
Bid Due: 12/31/2025
Follow Elevator Maintenance & Repair Services MDC Brooklyn, New York Active Contract Opportunity
Federal Agency
Bid Due: 12/26/2026
Issue Date: 12/06/2023 Contract Number: PON 4378 Loan Loss Reserve to Catalyze Clean
The New York State Contract Reporter
Bid Due: 12/31/2024