Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | California |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 24, 2024 |
Due: | May 6, 2024 |
Solicitation No: | 12970224R0021 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SCOPE OF CONTRACT:
The Contractor shall furnish all equipment and personnel necessary to remove and replace the
existing Wire-Faced Retaining Wall with government furnished Hilfiker Wall material.
The Contractor shall furnish all materials not provided by the government to complete
the project. (See Section G)
Work includes: Remove and dispose of the existing AC surface, remove and stockpile the
aggregate base, excavate the existing MSE structure, dispose of all steel and fabric
encasement materials, prepare the structure base, construct the new Government
Furnished MSE structure with the retained rock facia including an upper and lower
drain system, Backfill as needed to the sub-base level, replace the augmented road base,
place a 3” course of hot asphalt, and install object markers.
Specific Requirements for the Base Items are:
• All existing AC and/or chip seal pavement is to be removed and disposed of away from
government land. (See Section H)
• Excavate the existing MSE structure. Remove the geo-fabric and metal WW cages and
dispose of away from government land.
• Prepare a base for and construct the new Government Furnished MSE structure as
shown on the drawings. Also include installation of contractor supplied lower and
upper drain system.
• Place and compact suitable fill over the MSE structure to the appropriate level for
reconstruction of the new paved road section. Place and compact a six-inch course of
aggregate base. Clean base material previously removed from the excavation may be
reused here up to 50%.
• Apply a prime coat to compacted aggregate base and a tack coat to cut surfaces of
remaining AC pavement.
• Placing, shaping, and compacting hot-mix asphalt concrete to produce a single
compacted 3” course.
• Traffic control for public access and administrative travel.
PROJECT LOCATION:
The project is located on the Feather River Ranger District of the Plumas National Forest,
California. FSR 22N94 runs along the Hartman Bar Ridge south of the Middle Fork of the
Feather River. The road intersects with FSR 22N27 7.2 miles east of the community of Feather
Falls, CA. Access from the east (Quincy) is via PC 511 & 514 at Little Grass Valley Res. Near
La Porte, CA
The project location is:
Survey Location: T21N, R7E, Sec. 5, NE ¼
MAGNITUDE OF CONSTRUCTION PROJECT:
The price range for this contract is: $100,000.00 to $250,000.00.
RFIs to be submitted to george.staggs@usda.gov by 1200 CDT April 29, 2024.
Apr 16, 2024 | [Combined Synopsis/Solicitation (Original)] Plums National Forest; Feather River Ranger District; 22N94 Replace Retailing Wall 3 |
With GovernmentContracts, you can:
...Details Event ID 04-2J7904 Format/Type: Sell Event / RFx Published Date 04/22/2024 12:00AM ...
State Government of California
Bid Due: 5/29/2024
...Details Event ID 08-1N5704 Format/Type: Sell Event / RFx Published Date 04/29/2024 12:00AM ...
State Government of California
Bid Due: 5/22/2024
..., the work consists of demolition, including excavation and removal of existing landscape...
State Government of California
Bid Due: 5/16/2024
...-in-place columns and architectural columns, all structural excavation, formwork, and cast-in-place...
UCLA Capital Programs
Bid Due: 5/23/2024