SCP24-02 Straight Creek Drive

Agency: Summit County
State: Colorado
Type of Government: State & Local
Category:
  • 47 - Pipe, Tubing, Hose, Fittings
Posted: Mar 1, 2024
Due: Apr 3, 2024
Solicitation No: SCP24-02
Publication URL: To access bid details, please log in.
Bid Number: SCP24-02
Bid Title: SCP24-02 Straight Creek Drive
Category: Road and Bridge
Status: Open

Description:

This project combines a sewer line replacement for Dillion Valley Metro District and the roadway reconstruction for Summit County Government. There will be a mandatory pre-bid meeting at 1pm on site on March 13, 2024

Publication Date/Time:
3/1/2024 8:00 AM
Publication Information:
Summit County Journal
Closing Date/Time:
4/3/2024 10:00 AM
Submittal Information:
alice.gustafson@summitcountyco.gov
Bid Opening Information:
04/03/2024
Pre-bid Meeting:
03/13/2024
Contact Person:
Alice Gustafson
Download Available:
http://www.co.summit.co.us/Bid
Business Hours:
M-F: 8:00 AM - 5:00 PM
Related Documents:

Attachment Preview

Dillon Valley District
Straight Creek Drive Sewer Replacement
Technical Specifications
Summit County, Colorado
Project No. 200-34857-23001
© 2024 Tetra Tech, Inc.
February 28, 2024
Table of Contents
Note: See contract by Summit County for Division 00 and 01 sections.
Division 00 and 01 sections provided below are supplemental to the
contract.
01340 Shop Drawings, Product Data, and Samples
01400 Quality Control
01 5700 Care and Diversion of Surface Water
01 5713 Temporary Erosion and Sediment Control
31 1000 Site Clearing
31 2000 Earth Moving
31 2333 Trenching and Backfilling
33 3113 Site Sanitary Sewage Gravity Piping
33 4200 Stormwater Conveyance
SECTION 01 0340
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Submission of all shop Drawings and product data as required by the Contract
Documents for all equipment and materials to be furnished under this contract unless
specifically indicated otherwise
1.2 RELATED SECTIONS
A. Section 01 0400—Quality Control
B. Section 01 0700—Contract Closeout
C. Section 01 0730—Operation and Maintenance Data
1.3 SUBMITTALS
A. Shop Drawings—Drawings shall be presented in a clear and thorough manner:
1. Identify details by reference to sheet and detail, schedule or room numbers shown
on Contract Drawings
2. Identify equipment by reference to equipment name and tag number shown on
Contract Drawings
3. Scale and Measurements: Make drawings accurate to a scale with sufficient detail to
show the kind, size, arrangement and function of component materials and devices
4. Minimum sheet size: 8-1/2 inch by 11 inch
5. Fabrication drawing size: 11 inch by 17 inch or 24 inch by 36 inch
B. Product Data—Preparation:
1. Clearly mark each copy to identify pertinent products or models submitted for review
2. Identify equipment by reference to equipment name and tag number
3. Catalog cut sheets: Cross-out or delete irrelevant data
4. Show performance characteristics and capacities
5. Show dimensions and clearances required for installation and maintenance
6. Show wiring or piping diagrams and controls
7. Show external connections, anchorages, and supports required
C. "Certificate of Compliance":
200-34857-23001
01 0340 - 1
Dillon Valley District-
SHOP DRAWINGS PRODUCT DATA AND SAMPLES
Straight Creek Drive Sewer Replacement
02/02/2024
Final Construction Documents
1. Provided by manufacturer or supplier in lieu of submittal data required
2. Certifies that product data or item identified in certificate is in total compliance with
Contract Document requirements
3. Specifically identifies project name and that there is no deviation from Contract
Documents
4. Identify equipment by reference to equipment name and tag number
5. Identify limits of equipment, materials or work provided
6. Provide for specific product data or item only as indicated herein
D. Construction Schedule: Designate in the construction schedule, or in a separate
coordinated shop drawing schedule, the dates for submission and the dates that
reviewed Shop Drawings and Product Data will be needed
E. Samples—Office samples shall be of sufficient size and quantity to clearly illustrate:
1. Functional characteristics of the product, with integrally related parts and attachment
devices
2. Full range of color, texture and pattern
3. Comply with requirements identified in individual specification sections
F. Manufacturer's standard schematic drawings and diagrams:
1. Modify drawings and diagrams to delete information which is not applicable to the
Work by crossing out or omitting irrelevant data
2. Supplement standard information to provide information specifically applicable to the
Work
G. Field samples and mock-ups:
1. Contractor shall erect, at the Project site, at a location acceptable to the Engineer
2. Size or area: That specified in the respective specification section
3. Fabricate each sample and mock-up complete and finished
4. Remove mock-ups at conclusion of Work or when acceptable to the Engineer
1.4 CONTRACTOR RESPONSIBILITIES
A. Review shop drawings and product data prior to submission for accuracy and
completeness of each submission
B. Approve and stamp each submission before submitting it
C. Determine and verify:
1. Field measurements
2. Field construction criteria
200-34857-23001
01 0340 - 2
Dillon Valley District-
SHOP DRAWINGS PRODUCT DATA AND SAMPLES
Straight Creek Drive Sewer Replacement
02/02/2024
Final Construction Documents
3. Catalog numbers and similar data
4. Conformance with specifications
D. Prior to each submission, carefully review and coordinate all aspects of each item being
submitted
E. Verify that each item and the submittal for it conform in all respects with specified
requirements of the Work and of the Contract Documents with respect to means,
methods, techniques, sequences, and operations of construction, and safety precautions
and programs incidental thereto
F. Make submissions promptly in accordance with Construction Schedule, and in such
sequence as to cause no delay in the Work or in the work of any other contractor
G. Limit requirements for expedited submittal review by Engineer to no more than 20
percent of total number of submittals:
H. Expedited submittal review period: Less than 7 calendar days
I. Notify Engineer in writing, at time of submission, of any deviations in the submittals from
Contract Document requirements:
J. Identify and tabulate all deviations in transmittal letter
K. Indicate essential details of all changes proposed, including modifications to other
facilities that may be a result of the deviation
L. Include required piping and wiring diagrams
M. Provide resubmissions within 30 calendar days following return of reviewed submissions
for submittal items with disposition of either “Rejected” or “Revise and Resubmit”.
Promptly address noted Contract Document requirements, unresolved issues and all
other comments of Engineer prior to final review and approval by Engineer of
resubmissions. Contractor will be notified by Engineer of any deficient submittal items
after the specified number of calendar days required for resubmissions has expired.
1.5 SUBMISSION REQUIREMENTS
A. Make submissions far enough in advance of scheduled dates for installation to provide
time required for reviews, for securing necessary approvals, for possible revisions and
resubmissions, and for placing orders and securing delivery
B. In scheduling, allow a minimum of 14 calendar days for review by Engineer following
receipt of submission in Engineer's office:
1. Time required to mail submissions or resubmissions is not considered part of review
C. Consecutively number all submissions:
1. Assign unique number to include all shop Drawings, product data and other
information required for individual specification sections
200-34857-23001
01 0340 - 3
Dillon Valley District-
SHOP DRAWINGS PRODUCT DATA AND SAMPLES
Straight Creek Drive Sewer Replacement
02/02/2024
Final Construction Documents
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow NREL Space Assessment Active Contract Opportunity Notice ID SS-2024-3003 Related Notice Department/Ind.

Federal Agency

Bid Due: 12/18/2024

Follow NAF OFF BASE PRIORITY CHILD CARE REFERRALS Active Contract Opportunity Notice ID

Federal Agency

Bid Due: 8/30/2028

Follow NISSC II Follow-on Industry Day Active Contract Opportunity Notice ID FA8723-24-R-0003 Related

Federal Agency

Bid Due: 12/12/2024

Solicitation number Status Due Description Attachments 119-24 Active 10/30/2024 5:00 PM City of

City of Thornton

Bid Due: 10/30/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.