Removal and Replacement of Epoxy Floors at Various Parks Locations

Agency: Gwinnett County
State: Georgia
Type of Government: State & Local
Category:
  • S - Utilities and Training Services
  • Z - Maintenance, Repair or Alteration of Real Property
Posted: Feb 20, 2024
Due: Mar 13, 2024
Solicitation No: BL040-24 INV
Publication URL: To access bid details, please log in.
  • BL040-24 INV

    Removal and Replacement of Epoxy Floors at Various Parks Locations

    Buyer Contact : jake.scarpone@gwinnettcounty.com

    Opening Date : 03/13/2024 03:00 PM EST

    4

  • Attachment Preview

    PA046-21
    Page 1
    February 20, 2024
    INVITATION TO BID
    BL040-24
    Gwinnett County is soliciting competitive informal written Quotes from qualified contractors for Removal
    and Replacement of Epoxy Floors at Various Parks Locations for the Department of Community Services.
    Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the
    BL# and Company Name. Bids will be received until 2:50 P.M. local time on March 13, 2024 at the
    Gwinnett County Financial Services - Purchasing Division – 2nd Floor, 75 Langley Drive, Lawrenceville,
    Georgia 30046. Any bid received after this date and time will not be accepted. Bids will be publicly opened
    and read at 3:00 P.M. Apparent bid results will be available the following business day on the website
    www.gwinnettcounty.com.
    Questions regarding bids should be directed to Jake Scarpone, Purchasing Associate II, at
    Jake.Scarpone@gwinnettcounty.com or by calling 770-822-8722, no later than 3:00 P.M. on February 28,
    2024 . Bids are legal and binding upon the bidder when submitted.
    Gwinnett County does not discriminate on the basis of disability in the admission or access to its
    programs or activities. Any requests for reasonable accommodations required by individuals to fully
    participate in any open meeting, program or activity of Gwinnett County Government should be directed to
    the ADA Coordinator at the Gwinnett County Justice and Administration Center, 770-822-8165.
    The written bid documents supersede any verbal or written prior communications between the parties.
    Award will be made to the contractor submitting the lowest responsive and responsible bid. Gwinnett
    County reserves the right to reject any or all bids to waive technicalities and to make an award deemed in
    its best interest. Bids may be split or awarded in entirety. Gwinnett County reserves the option to
    negotiate terms, conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion.
    Award notification will be posted after award on the County website, www.gwinnettcounty.com and
    companies submitting a bid will be notified via email.
    We look forward to your bid and appreciate your interest in Gwinnett County.
    Jake Scarpone
    Purchasing Associate II
    The following pages should be returned with your bid:
    Bid Schedule, Pages 7-8
    References, Page 9
    Contractor Affidavit & Agreement, Page
    10
    Code of Ethics Affidavit, Page 11
    BL040-24
    Page 2
    REMOVAL AND REPLACEMENT OF EPOXY FLOORS AT VARIOUS PARKS LOCATIONS
    I. SCOPE OF WORK
    Gwinnett County Department of Community Services is soliciting competitive bids from qualified contractors for the
    removal and replacement of epoxy floors at various parks locations. The successful contractor shall furnish all labor
    and materials required to remove and replace epoxy floors at various locations for the Department of Community
    Services.
    II. DESCRIPTION OF WORK
    1. Remove existing epoxy floor/ceramic carpet and dispose of all material off County property according
    Environmental and Protection Agency (EPA) regulations.
    2. Check for moisture issues and install moisture membrane if needed.
    3. Installation of new epoxy floor/ceramic carpet according to manufacturer’s specifications.
    4. Remove existing cove base and install new 6” epoxy cove base.
    5. Secure work area before and during the project to ensure safety at all times.
    6. Clean up all debris and dispose of it according to EPA regulations.
    The use of products other than those indicated in the materials section must be pre-approved by the Gwinnett County
    representative. All products must be applied according to the manufacturer’s specifications. Any proposed
    substitutions must be submitted with the bid and must include specifications, colors, warranty, and any other
    information necessary for evaluation. The County may reject the bid if this information is not provided.
    III. QUALITY ASSURANCE
    1. Manufacturer’s Qualifications: Successful contractor must obtain materials from a manufacturer with a minimum
    of five years verifiable experience providing materials of the type specified.
    2. Contractor’s Qualifications: Installation must be performed by a manufacturer-certified contractor with skilled
    mechanics having approximately three years’ satisfactory experience in the installation of the type of system
    specified.
    IV. STORAGE
    The successful contractor must store materials in accordance with the manufacturer's instructions, with seals and
    labels intact and legible. The owner is not responsible for the storage of materials. Materials shall not be stored in
    areas accessible to the public.
    V. MATERIALS
    Successful contractor must submit samples of flooring material to the owner for approval of color and texture before
    beginning installation. Color should match Sherwin Williams Ceramic Carpet color #319 (Sandpoint) or an approved
    equivalent.
    1. Crack Filler: General Polymers #3580 Crack and Joint Filler or an approved equivalent
    2. Moisture Barrier (if needed): General Polymer Moisture Membrane or an approved equivalent
    3. Epoxy Resin Glaze: General Polymers #3561 or an approved equivalent
    4. Standard System for New Flooring: Ceramic Carpet #400 Quartz Broadcast Flooring System by General Polymers
    or an approved equivalent. Color should match Sherwin Williams Ceramic Carpet color #319 (Sandpoint) or an
    approved equivalent.
    5. Grout/Seal Coat: General Polymers #3744 or an approved equivalent
    BL040-24
    Page 3
    BL040-24
    Page 4
    VI. PREPARATION
    The successful contractor shall exercise care during surface preparation and system installation to protect
    surrounding finishes, substrates, and surfaces, as well as in-place equipment, floor drains, cleanouts, etc.
    1. The successful contractor shall cover and secure all HVAC grills, vents, commodes, urinals, sinks, bathroom
    fixtures, etc. with heavy-duty plastic sheeting before beginning surface preparation. Contractor shall provide dust
    control during surface preparation. All dust and debris from surface preparation work shall be removed before
    uncovering and operating HVAC systems.
    2. The successful contractor must remove existing flooring from substrate and legally dispose of all materials off
    site, according to EPA regulations.
    3. The successful contractor shall prepare the substrate to remove laitance and open the surface in according with
    Flooring System or coating manufacturer’s instructions. Concrete surfaces shall be abrasive blasted to remove all
    surface contaminants and laitance. The prepared concrete shall have a minimum surface profile equal to 40-60
    grit sandpaper and be free of bond-inhibiting contaminants.
    4. After initial preparation is completed, inspect the substrate for big holes, voids, fins, and other imperfections.
    Protrusions shall be ground smooth, and voids shall e filled with General Polymers #3580 Crack and Joint Filler or
    an approved equivalent.
    5. Successful contractor must treat cracks, control joints and isolation/expansion joints in accordance with the
    manufacturer’s recommendations. Where necessary, the installer shall saw cut existing control joints, clean out
    joint materials and fill joints with the specified crack filler (or an approved equivalent).
    6. If necessary, concrete around floor drains shall be ground down for positive slope and the drains re-set. The top of
    the drains must be even with the surrounding edge of the finished flooring.
    7. Contract must notify the owner’s representative when surface preparation is completed and must obtain approval
    of surface preparation before proceeding with installation of the flooring system.
    VII. WORK CONSTRAINTS
    1. The affected area will be closed to the public, but the remainder of the facility and park will be open to the public.
    The successful contractor shall take proper precautions to block off, barricade, and cover in-process work areas
    to protect the floor, carpeting, employees, and other people in the building.
    2. Hours of work shall be agreed upon by the successful contractor and County staff, but generally are from 7:30 AM
    until 4:00 PM Monday through Friday. Hours may vary depending on the location of the job.
    3. Once work is scheduled and schedules are confirmed by both the contractor and the County representative, it is
    critical that the contractor adheres to the schedule and performs the work in a timely manner. Failure to do so
    could cause the County unnecessary revenue loss and inconvenience to park patrons.
    VIII. INSTALLATION
    1. Apply each component of the flooring system and/or coatings in compliance with manufacturer’s written
    installation instructions and strictly adhere to mixing and installation methods, re-coat windows, cure times and
    environmental restrictions. The flooring system shall be installed directly over non-moving control joints and
    cracks which have been treated with General Polymer #3580 Crack and Joint Filler or an approved equivalent.
    2. Throughout the application process, and for 72 hours after the application process, substrate temperature should
    be 60-80 degrees Fahrenheit. The substrate temperature must be at least 5 degrees Fahrenheit above the dew
    point. Application on concrete substrates should occur while temperature is falling to reduce out gassing and
    problems associated with dew point.
    3. For New Flooring System:
    a. Apply primer(s) in accordance with manufacturer’s instructions.
    b. Install a 1/8” zinc strip 6” above floor level on adjacent walls to provide termination point for the cove
    BL040-24
    Page 5
    base. The zinc strap shall be level and secure.
    c. Install 6” tall cove base terminating at the zinc strip, per manufacturer’s instructions.
    d. After the cove base has cured, install a continuous strip of Sherwin Williams #2230A High Performance
    clear sealant or an approved equivalent along the top of the zinc strip and the wall.
    e. Install epoxy resin glaze, ceramic granules, grout coat and seal coat in accordance with manufacturer’s
    instructions.
    f. Color and texture should be even throughout and closely match the approved sample. Fill any bare spots
    with granules and smooth out any rough spots or spurs. Provide an additional seal coat if necessary. The
    cove base should match the flooring in texture and finish.
    g. Successful contractor must notify the owner’s representative when the flooring system is ready for
    inspection. Correct items that are found to be inconsistent with the sample or which do not meet the
    specifications must be repaired to the satisfaction of the owner’s representative.
    IX. CURING, CLEANING AND PROTECTION
    1. Contractor to cure the flooring system materials and coatings in compliance with the manufacturer's directions,
    taking care to prevent contamination during the stages of the installation and prior to completion of the curing
    process. Do not leave the room(s) unlocked or unattended during the curing process. Do not allow public access
    on the floors until curing is complete and approval has been given by the County representative.
    2. Contractor must perform cleaning during installation of the work and upon completion of the work. Clean the
    flooring system just prior to final inspection, using only materials and procedures recommended by the
    manufacturer.
    3. Contractor shall remove from the site all debris and equipment, clean flooring material and preparation work
    debris from adjacent surfaces and repair all damage resulting from work under this contract.
    4. Contractor shall inspect the site daily and must not leave the site without correcting any conditions caused by this
    work which would be hazardous to the public. Contractor must provide barricades, warning tape and other means
    necessary to protect the public from hazardous conditions while work is in progress.
    X. GENERAL REQUIREMENTS
    1. References
    The selected contractor must have demonstrated successful performance on projects on projects of a similar
    size and scope. A minimum of three (3) references shall be provided on the “References” form included herein.
    References must clearly demonstrate successful completion of similar projects within the past five (5) years.
    2. Contractor Qualifications
    The selected contractor shall comply with state and local codes and regulations, Contractor shall have and
    maintain all appropriate state, local, and federal licensing.
    3. Safety and Damages
    The contractor shall adequately protect County property and take necessary precautions during the work process
    to protect all persons/property from damage or loss. Reports of any damage to County property must be
    submitted by the contractor to the designated County representative. Damage to public and/or private property
    shall be the sole responsibility of the contractor and shall be repaired and/or replaced at no additional cost to
    Gwinnett County.
    4. Clean Up
    The contractor shall be responsible for proper removal and disposal of all construction debris and materials
    according to EPA regulations.
    5. Warranty
    The contractor shall warranty all work for a minimum of one (1) year from the date of acceptance from the County
    representative.
    This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Request for Information (RFI) Active Contract Opportunity Notice ID AFCEC24R0002 Related Notice

    Federal Agency

    Bid Due: 6/08/2024

    Follow USACE National Dredging Meeting, 5-6 June 2024 Active Contract Opportunity Notice ID

    Federal Agency

    Bid Due: 5/10/2024

    Event Details Event ID Event Type Event Status Purchase Type Category Type Government

    State Government of Georgia

    Bid Due: 5/08/2024

    Event Details Event ID Event Type Event Status Purchase Type Category Type Government

    State Government of Georgia

    Bid Due: 5/06/2024

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.