GENERAL CONTRACTOR SERVICES - NEW GYMNASIUM - ADDENDUM No. TWO

Agency: Hall County
State: Georgia
Type of Government: State & Local
Category:
  • Q - Medical Services
Posted: May 23, 2023
Due: Jun 1, 2023
Solicitation No: 056-43
Publication URL: To access bid details, please log in.
Bid Number: 056-43
Bid Title: GENERAL CONTRACTOR SERVICES - NEW GYMNASIUM - ADDENDUM No. TWO
Category: Bids & Proposals
Status: Open

Description:

REQUEST AMMENDMENT NO. ONE BID DOCUMENTS

ADDENDUM NO. TWO

May 23, 2023

Joseph F. Walters Boys & Girls Club

Gymnasium Addition

Boys & Girls Club of Lanier

To: ALL CONTRACTORS

This addendum forms a part of the contract documents and modifies the original drawings & specifications dated December 16, 2022.

  1. SPECIFICATIONS

  • ITEM NO. 1:

Spec Section 133419 – Metal Building Systems.

Add: Red Dot Buildings, of Athens, TX as an approved manufacturer.

  • ITEM NO. 2:

Item No. 3, from Addendum #1 adding Specification Section 23 61 10 was erroneously included. This Item is to be disregarded.

  1. CIVIL DRAWINGS

N/A

  1. CIVIL CLARIFICATIONS

  • ITEM NO. 1:

Any shoring necessary for any construction related work is the responsibility of the General Contractor. Design requirements for any necessary shoring are the responsibility of the General Contractor.

  • ITEM NO. 2:

Any necessary tap fees are paid for by the Owner.

  • ITEM NO. 3:

The secondary access road behind Lyman Hall Elementary School is private property of the Hall County School District and may not be used for access or construction.

  1. ARCHITECTURAL CLARIFICATIONS

  • ITEM NO. 1:

Work can occur during normal business hours, however, the existing building is an operating Boys & Girls facility, and Club operations cannot be interrupted. Contractors may not access the existing club during operation hours, and construction must be kept separate from Club staff and children. Any work necessary in the existing Club must be done after Club operating hours, or scheduled on days when staff and children are not onsite.

Any temporary power and water requirements necessary to construct the addition and renovations are the responsibility of the General Contractor.

  • ITEM NO. 2:

The General Contractor will be expected to mobilize onsite no more than two (2) weeks following the Notice to Proceed. Construction is anticipated to take no more than twelve (12) months from the Notice to Proceed.

  • ITEM NO. 3:

Attic stock items for finishes are to be furnished per the specifications.

  • ITEM NO. 4:

There is no athletic equipment being provided by the Owner. The General contractor shall furnish and install the specified athletic equipment per the Specifications, and coordinate equipment weights and load requirements with the structural frame provider.

  • ITEM NO. 5:

The Owner will employ a testing agent for materials testing and Special Inspections per the Schedule of Special Inspections in the Specifications. The General Contractor shall coordinate and schedule the testing agent and keep records of the inspection and test results.

  • ITEM NO. 6:

Interior Panel Signage is to be furnished and installed by the General contractor per the Specifications. Assume a minimum of five (5) new signs.

  • ITEM NO. 7:

Graphics for the Gym wall padding shall be included in the Base Bid per the Specifications. The Owner will coordinate desired graphics during the shop drawing phase.

Wall Padding shall be 72” high as shown on the drawings.

  • ITEM NO. 8:

The General Contractor shall furnish the specified low-voltage rough-ins. The Owner’s vendor shall install data cabling, security cameras, etc. The General Contractor shall coordinate with the Owner’s vendor.

  • ITEM NO. 9:

The exterior metal wall panels shall be furnished and installed per the requirements in Division 13 – Metal Building Systems.

Exterior metal wall panels identified in Division 7 – Metal Wall Panels are not used for this project.

  • ITEM NO. 10:

There are no special tax exemptions for this project.

  • ITEM NO. 11:

For bidding purposes, the Portal Frames indicated for the Pre-Engineered Metal Building shall be included in lieu of Rod Bracing. Additional review and potential Value Engineering for Rod Bracing will be reviewed after Bidding.

  • ITEM NO. 12:

Architectural Clarification Item IV.3 from Addendum #1 is to be disregarded. Standing Seam metal roofing with mechanically seamed ribs per the specifications shall be furnished.

  1. STRUCTURAL CLARIFICATIONS

  • ITEM NO. 1:

Structural load requirements as identified in Division 13 – Metal Building Systems shall be utilized for this project.

  1. MEP CLARIFICATIONS

  • ITEM NO. 1:

The existing Fire Alarm is a Fire-lite Ms5UD. Devices specified for the new addition shall be connected to, and coordinated with this existing system. A new remote voice evacuation unit is to be provided in the new Gym. The new remote and voice evacuation unit must be interlocked with the existing fire alarm system.

BDA/ERCC SYSTEM:

A. THE CONTRACTOR SHALL PROVIDE A COMPLETE BI-DIRECTIONAL ANTENNA (BDA) SYSTEM FOR EMERGENCY RESPONDER RADIO COVERAGE (ERRC) FOR THE ENTIRE BUILDING. THE BDA/ERRC SYSTEM SHALL BE DESIGNED AND INSTALLED BY AN FCC CERTIFIED TECHNICIAN TRAINED ON THE SYSTEM BEING INSTALLED. THE SYSTEM SHALL COMPLY WITH UL 2524, NFPA 72, NFPA 1221 AND IFC. THE SYSTEM SHALL BE OF THE SAME MANUFACTURER AS THE FIRE ALARM SYSTEM. BDA SYSTEM DESIGN SHALL BE SUBMITTED WITH THE SHOP DRAWINGS FOR ENGINEER’S REVIEW. PROVIDE ROOF PENETRATION AS REQUIRED FOR ROOF MOUNTED ANTENNA - ROOF PENETRATION SHALL BE PERFORMED BY ROOFING CONTRACTOR - COORDINATE WITH ARCHITECT FOR LOCATION. CRITICAL AREAS SHALL BE PROVIDED WITH 100% FLOOR AREA RADIO COVERAGE. GENERAL BUILDING AREAS SHALL BE PROVIDED WITH 95% RADIO COVERAGE, OR AS SPECIFIED BY AHJ.

B. RADIO SIGNAL COVERAGE IN THE BUILDING SHALL BE TESTED NEAR THE END OF BUILDING CONSTRUCTION AFTER ALL WALLS, CEILINGS, ROOF AND MAJOR COMPONENTS HAVE BEEN INSTALLED. THE PRICE OF THE SYSTEM SHALL BE OFFERED BACK TO THE OWNER ONLY IF RADIO SIGNALS (WITHOUT THE BDA/ERCC SYSTEM) MEET THE COVERAGE REQUIREMENTS LISTED ABOVE.

  • ITEM NO. 2:

The design intent for the new Fire Protection (sprinkler) system is that both the existing building and the new addition will be will be protected with a new fire sprinkler system. The General Contractor will need to coordinate any removal and reinstallation of ceiling tiles and grid necessary to fully install the new sprinkler in the existing building. Any damaged items such as ceiling tiles, grid, sheetrock walls, etc. must be repaired and / or replaced as part of the base bid.

  • ITEM NO. 3:

Detail 2/M1.2 is intended for usage with the relocation of the existing louver in Storage 113.:

END OF ADDENDUM NO. TWO

Publication Date/Time:
4/12/2023 8:00 AM
Publication Information:
The Gainesville Times, Hall County Website, The Georgia Procurement Registry
Closing Date/Time:
6/1/2023 2:00 PM
Bid Opening Information:
Public
Addendum Date/Time:
05/23/2023
Contact Person:
Andy Penick, apenick@hallcounty.org
Fee:
0.00
Business Hours:
8:00am -5:00pm

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Request for Information (RFI) Active Contract Opportunity Notice ID AFCEC24R0002 Related Notice

Federal Agency

Bid Due: 6/08/2024

Follow USACE National Dredging Meeting, 5-6 June 2024 Active Contract Opportunity Notice ID

Federal Agency

Bid Due: 5/10/2024

Event Details Event ID Event Type Event Status Purchase Type Category Type Government

State Government of Georgia

Bid Due: 5/08/2024

Event Details Event ID Event Type Event Status Purchase Type Category Type Government

State Government of Georgia

Bid Due: 5/06/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.