Agency: | State Government of Georgia |
---|---|
State: | Georgia |
Type of Government: | State & Local |
Category: |
|
Posted: | Feb 28, 2024 |
Due: | Apr 3, 2024 |
Solicitation No: | PE-66086-NONST-2024-000000003 |
Publication URL: | To access bid details, please log in. |
Angel Fowler
cityclerk@manchester-ga.gov
706 846 3141
The work to be done consists of furnishing all materials, equipment and labor for the
construction of replacing approximately 255 linear feet of 48" HDPE storm pipe,
replacing approximately 50 linear feet of 42" HDPE pipe, replacing 20 linear feet of 60"
box culvert, junction boxes, headwalls and other appurtenances.
Code | Description |
91345 | Construction, Sewer and Storm Drain |
91381 | Maintenance and Repair, Sewer and Storm Drain, Including Removal |
96873 | Storm Drain Cleaning, Repair, and Sludge Removal Services |
With GovernmentContracts, you can:
...@carrollton-ga.gov (770) 830-2000 Description The project consists of extending storm sewer systems on ...
State Government of Georgia
Bid Due: 5/14/2024
...for the purpose of conducting a public property tree inventory and a related ...
State Government of Georgia
Bid Due: 4/29/2024
...and Repair, Sewer and Storm Drain, Including Removal 91345 Construction, Sewer and Storm ...
State Government of Georgia
Bid Due: 5/08/2024
...the existing storm sewer pipes as shown on the provided drawings. Installation of ...
State Government of Georgia
Bid Due: 5/14/2024