HVAC Repairs for Animal Shelter

Agency: Terrebonne Parish
State: Louisiana
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Posted: Mar 11, 2024
Due: Mar 27, 2024
Solicitation No: Rebid 24-HVAC-05
Publication URL: To access bid details, please log in.
bid number description closing date/time
Rebid 24-HVAC-05

HVAC Repairs for Animal Shelter 03/27/2024 02:00 PM

Attachment Preview

MECHANICAL BID
TERREBONNE PARISH ANIMAL SHELTER
100 Government St, Gray, LA 70359
HVAC REPAIR PROJECT
March 4, 2024
1|Page
MECHANICAL BID
TERREBONNE PARISH ANIMAL SHELTER: Request for Proposal HVAC Repair Project
PROJECT SUMMARY:
The Terrebonne Parish Animal Shelter is Requesting Pricing for the HVAC Repair Project located at 100 Government St,
Gray, LA 70359. All requests for information regarding this RFP should be directed to the Terrebonne Parish
representative listed in this document.
The purpose of this RFP is to solicit proposals from qualified firms with expertise in HVAC Repair. The contracted work
involves providing all necessary labor, insurance, bonds, materials, and equipment as outlined in the Scope of Work
below. Within this RFP, you will find a comprehensive overview of the project, existing mechanical drawings, equipment
specifications, and details of the HVAC deficiencies.
This animal shelter encompasses distinct areas, including the Adoption Zone, Surgical Wing, Holding Kennels, and
Offices. The shelter's climate control relies on seven (7) AAON Dedicated Outdoor Air Package Units (DOAS), each
equipped with Energy Recovery Wheels (ERW) and exhaust fans.
2|Page
MECHANICAL BID
BASE Price Scope of Work to consists of the following:
1. Provide all labor and materials needed to replace all the energy recover wheels, belts, motors, and seals on all
seven (7) AAON Rooftop DOAS systems.
2. Provide all labor and materials to remove existing filter media from all units. Provide all labor and materials to
install factory outside air/intake filters in all seven (7) AAON Rooftop DOAS systems.
3. Provide all labor and materials to remove existing filter media from all exhaust grilles. Provide all labor and
materials to install new 1” MERV 8 pleated filters in all exhaust grilles throughout the Animal Shelter.
4. Provide all labor and materials to furnish and install balancing dampers and ceiling access hatches in order to
perform the required TAB work.
5. Provide all labor and materials to furnish and install seven (7) Room Pressure Monitors within each space of the
Animal Shelter.
6. Provide all labor and materials to furnish and install a front-end type controls interface to give customer access
to the HVAC monitoring and overall system conditions.
7. Develop a complete Preventative Maintenance Checklist for all HVAC equipment based on the engineering
report and the new HVAC repairs made.
8. Perform an On-Site customer training on all new equipment with the owner.
9. Provide one (1) new spare AAON VCCX2 controller.
ALTERNATES Price Scope of Work to consists of the following:
1. Alternate #1
a. Provide cost for a one (1) year maintenance program.
2. Alternate #2
b. Provide an extra set ERW Media for each Rooftop DOAS System.
c. Provide extra set of 2” Metal Mesh OSA Filters for each Rooftop DOAS System.
3. Alternate #3
a. Provide all labor, materials, etc. to furnish and install seven (7) new indoor Air Quality (IAQ) Monitors
throughout the Animal Shelter.
You are invited to submit your Separated Firm Price Proposal to provide the scope of work listed above.
Proposal pricing should be valid for the next 30 days.
3|Page
MECHANICAL BID
All proposals/bids are REQUIRED to include on-site customer training on the new equipment with the owner
following the completion of the fieldwork.
All proposals/bids are REQUIRED to include a comprehensive Preventative Maintenance Checklist for all HVAC
equipment.
All proposals/bids are REQUIRED to include a one (1) year parts and labor warranty for the work completed.
All proposals/bids are REQUIRED to provide Equipment and Material Lead Times.
All proposals/bids are REQUIRED to provide a Project Schedule disclosing an estimated start date, end date, order in
which work will be performed, etc. within two (2) weeks of the project being awarded. Total Project duration should
not exceed 120 days.
The following “Contract Documents” are being provided:
1. A Project Overview & Scope of Work
2. B TPCG Animal Shelter HVAC Engineering Report
Existing Mechanical Drawings are included in the report.
The following will be used in the online bid statement for “Instructions to Bidders”:
1. This is a turn-key project. The contractor is responsible for providing all services, labor, material etc. to
deliver a complete and functional system to the owner.
2. You are invited to submit your Separated Firm Price Proposal to provide the scope of work listed above.
3. Proposal pricing should be valid for the next 30 days.
4. All proposals/bids are REQUIRED to include on-site customer training on the new equipment with the owner
following the completion of the fieldwork.
5. All proposals/bids are REQUIRED to include a comprehensive Preventative Maintenance Checklist for all
HVAC equipment.
6. All proposals/bids are REQUIRED to include a one (1) year parts and labor warranty for the work completed.
7. All proposals/bids are REQUIRED to provide Equipment and Material Lead Times.
8. All proposals/bids are REQUIRED to provide a Project Schedule disclosing an estimated start date, end date,
order in which work will be performed, etc within two (2) weeks of the project being awarded. Total Project
duration should not exceed 120 days.
9. Please note that the Terrebonne Parish Animal Shelter is an active building and consideration must be given.
A PROJECT OVERVIEW & SCOPE OF WORK
SCOPE OF WORK:
Outline:
4|Page
MECHANICAL BID
1. EXISITNG ROOFTOP PACKAGE UNIT REPAIRS AND MODIFICATIONS SCOPE OF WORK:
a. Provide all parts, materials and labor needed to replace the energy recover wheels and its associated belts,
motors and seals on all seven (7) AAON Rooftop DOAS systems.
i. New Energy Recovery Wheels to be equipped with a 1% Purge functionality.
b. Remove existing filter media from all units. Provide and install factory outside air/intake filters in all seven
(7) AAON Rooftop DOAS systems.
i. Remove the poly roll filter media on the weather hoods and replace the 2” pleated filters with the
original metal mesh filters on each unit.
The existing Rooftop HVAC Equipment serving TCPG Animal Shelter is listed below:
Rooftop Package Unit No. 1 (Main Entry Area / Offices): RTU-1
AAON Dedicated Outdoor Air System (100% Outside Air)
RTU Model: RN-010-8-0-FB09-3K4: GABDD0BDTEB0B0DEA00E0000A0000A1
Nominal Tonnage: 10-Tons
Gas Heat 120MBH
Electrical: 208-230/3/60; MCA: 63; MOCP: 90
Rooftop Package Unit No. 2 (Cat Adoption Area): RTU-2
AAON Dedicated Outdoor Air System (100% Outside Air)
RTU Model: RN-008-8-0-FA09-324: GABDD0BDTDB0B0DEA00E0000A0000A1
Nominal Tonnage: 8-Tons
Gas Heat 72.9MBH
Electrical: 208-230/3/60; MCA: 49; MOCP: 70
Rooftop Package Unit No. 3 (Cat Support Area): RTU-3
AAON Dedicated Outdoor Air System (100% Outside Air)
RTU Model: RN-010-8-0-FB09-3K4: GABDD0BDTEB0B0DEA00E0000A0000A1
Nominal Tonnage: 10-Tons
Gas Heat 120MBH
Electrical: 208-230/3/60; MCA: 63; MOCP: 90
Rooftop Package Unit No. 4 (Animal Treatment/Dishwasher/Laundry): RTU-4
AAON Dedicated Outdoor Air System (100% Outside Air)
RTU Model: RN-008-8-0-FA09-324: GABDD0BDTDB0B0DEA00E0000A0000A1
Nominal Tonnage: 8-Tons
Gas Heat 72.9MBH
5|Page
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

bid number description date issued bid open date/time help 3000022280 Lead & Copper

State Government of Louisiana

Bid Due: 12/28/2024

Follow Mississippi River Baton Rouge to Gulf of Mexico Southwest Pass Hopper Dredge

Federal Agency

Bid Due: 3/01/2026

Follow Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging,

Federal Agency

Bid Due: 2/02/2026

Follow Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging,

Federal Agency

Bid Due: 2/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.