Title: Norrback School Fire Pump Replacement / WPS

Agency: City of Worcester
State: Massachusetts
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • J - Maintenance, Repair, and Rebuilding of Equipment
Posted: Feb 14, 2024
Due: Mar 6, 2024
Solicitation No: 8148-W4
Publication URL: To access bid details, please log in.

Bid Number

8148-W4
Title
Norrback School Fire Pump Replacement / WPS
Industry
Construction Services - Vertical
Open Date
02/14/2024
Close Date
03/06/2024 10:00 AM
Contact
Christopher Gagliastro, Purchasing Director
Comments

Scope: replacement of fire pump at Norrback School per attached plans and specifications

Estimated Cost: $ 188,000.00

DCAMM CertificationL Fire Protection Sprinkler Systems

Standard Form(s)
CORI Compliance.pdf
EPP Policy.pdf
MWBE Program.pdf
REAP Program.pdf
Wage Theft Prevention Certification.pdf
Bid Form(s)

8148-W4-FORM-149-Norrback-School-Fire-Pump-Replacement-WPS-12-12.pdf
8148-W4-Norrback-Fire-Pump-Bid-Set-Specs.pdf
Plan Holder(s)*
Bid Results
Awardee(s)
× Christopher Gagliastro, Purchasing Director
Email: gagliastroc@worcesterma.gov
Phone: 508-799-1224
Fax: 508-799-1203

View Buyer's Commodities List

*APPLIES TO CONSTRUCTION BIDS ONLY - All City of Worcester bids are available for downloading from the City of Worcester website with no required registration process. As a result, the City accepts no responsibility for the accuracy of plan holder lists issued.

Attachment Preview

Norback Fire Pump Replacement
architecture
engineering
management
electrical engineer:
edm
1801 6th Avenue
Suite 200
troy, ny 12180
contact: Jeremy Barnes
(518) 272-0274
(413) 443-6057 fax
jbarnes@edm-ae.com
issued for: Bid Set
date:
02.22.2023
project no. : cow-6095
architectural plan general notes
1. SEE SHEET GI-101 FOR TYPICAL SYMBOLS AND DRAWING CONVENTIONS.
2. REPAIR/REPLACE ALL IMPACTED FINISHES TO MATCH EXISTING.
3. ALL WALL AND CEILING PENETRATIONS SHALL BE FIRE STOPPED AS REQUIRED BY CODE.
4. REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR EQUIPMENT INFORMATION.
5. ALL EXISTING WALLS IN CONSTRUCTION ZONE TO BE REPAIRED, PATCHED, AND FINISHED TO MATCH
EXISTING ADJACENT.
6. PAINT ALL WALLS TO MATCH EXISTING.
architectural plan key notes
A01 EXISTING FLOOR DRAIN TO BE RELOCATED OUT OF DOOR SWING
A02 REPLACE EXISTING CUT DOOR WITH 90 MINUTE FIRE-RATED DOOR AND CLOSER
A03 REMOVE EXISTING LOUVER AND INFILL WALL W/ 2 HOUR RATED CONSTRUCTION
A04 REMOVE EXISTING ACCESS PANEL AND REPLACE WITH 2 HOUR RATED PANEL
A05 REMOVE EXISTING GYP AS REQUIRED AND REPLACE. PATCH ALL OPENINGS IN WALL CONSTRUCTION
A06 INSTALL WATER-RESISTANT GYPSUM WALLBOARD FROM FLOOR LEVEL TO 48" AFF
A07 NEW EPOXY FLOORING
A08 VERIFY EXISTING DOOR AND FRAME ARE 90 MINUTE FIRE RATED DOOR, REPLACE IF NEEDED.
FIRE
PUMP
1
A07
A06 A05
A02
A01
WATER
PUMP
A06
2
A07
A04 A03
A06
A06 A05
A08
1
architectural plan - first floor
1/2" = 1'-0"
edm
architecture
engineering
management
pittsfield, ma
unionville, ct
troy, ny
(888) 336-6500
team@edm-ae.com
consultants:
design by:
-
drawn by:
JP
checked by:
JI
approved by:
JI
Norback Water and
Fire Pump
Replacement
44 Malden St,
Worcester, MA 01606
keyplan:
issue / rev.: date:
issued for:
by:
construction plan - first floor
date:
3.3.23
project number:
cow-6094
scale:
As indicated
drawing number:
A-111
EXISTING TO REMAIN 8"
THRU WALL O.S. & Y
VALVE ON INCOMING
SERVICE
EXISTING TO REMAIN
6" FULL BYPASS
3
FP-100
EXISTING TO BE REMOVED
HORIZONTAL SPLIT-CASE
ELECTRIC DRIVEN 750 GPM
@ 100 PSI FIRE PUMP
EXISTING FIRE PUMP
DISCONNECT
EXISTING 6" BACKFLOW
PREVENTER
EXISTING TO BE REMOVED
FIRE PUMP CONTROLLER WITH
AUTO-TRANSFER SWITCH
EXISTING TO REMAIN
SIAMESE CONNECTION
EXISTING TO REMAIN
ELECTRIC DRIVEN JOCKEY PUMP
EXISTING TO REMAIN
FIRE PUMP TEST HEADER
EXISTING TO REMAIN 6"
WET-PIPE ALARM VALVE
EXISTING TO REMAIN
JOCKEY PUMP CONTROLLER
EXISTING TO REMAIN 6" TO
BUILDING SPRINKLER SYSTEM
1
Level 1 Fire Pump Room - Existing
1/4" = 1'-0"
EXISTING 8" THRU WALL
O.S. & Y VALVE ON
INCOMING SERVICE
EXISTING 6" FULL BYPASS
3
FP-100
NEW 750 GPM @ 100 PSI ELECTRIC
DRIVEN HORIZONTAL SPLIT-CASE
FIRE PUMP 480 VAC, 60 HP, 3560 RPM,
3 PHASE, 60 Hz
EXISTING 480 VAC FIRE PUMP
DISCONNECT
EXISTING 6" BACKFLOW
PREVENTER
NEW SOLID STATE SOFT START
FIRE PUMP CONTROLLER WITH
AUTO-TRANSFER SWITCH
2
Level 1 Fire Pump Room - New
1/4" = 1'-0"
EXISTING SIAMESE
CONNECTION
EXISTING ELECTRIC DRIVEN
JOCKEY PUMP
EXISTING FIRE PUMP TEST HEADER
EXISTING 6" WET-PIPE ALARM VALVE
EXISTING JOCKEY PUMP
CONTROLLER
6" TO BUILDING SPRINKLER
SYSTEM
EXISTING TO REMAIN
6" FULL BYPASS
EXISTING HORIZONTAL
SPLIT-CASE ELECTRIC
DRIVEN 750 GPM
@ 100 PSI FIRE PUMP
3
Fire Pump
1/4" = 1'-0"
EXISTING TO REMAIN 4" PIPE
TO FIRE DEPT CONNECTION
EXISTING TO REMAIN ELECTRIC
DRIVEN JOCKEY PUMP
NOTES:
1.
INSTALLATION TO BE IN ACCORDANCE WITH NFPA-20, 2013 EDITION
AND THE COMMONWEALTH OF MASSACHUSETTS STATE BUILDING
CODE, 9TH EDITION, AND LOCAL STANDARDS AND ORDINANCES.
2.
REPLACE EXISTING ELECTRIC DRIVEN FIRE PUMP WITH NEW 750 GPM
@ 100 PSI ELECTRIC DRIVEN HORIZONTAL SPLIT-CASE FIRE PUMP 480
VAC, 60 HP, 3 PHASE, 3560 RPM, 60 Hz.
3.
REPLACE EXISTING FIRE PUMP CONTROLLER WITH AUTO-TRANSFER
SWITCH WITH NEW SOLID STATE SOFT START FIRE PUMP
CONTROLLER WITH AUTO-TRANSFER SWITCH.
4.
MAKE CONNECTIONS FROM NEW FIRE PUMP MOTOR TO NEW FIRE
PUMP CONTROLLER.
5.
MAKE CONNECTIONS FROM EXISTING FIRE PUMP DISCONNECT TO
NEW FIRE PUMP CONTROLLER.
6.
MAKE SENSING LINE CONNECTIONS FROM SYSTEM TO FIRE PUMP
CONTROLLER.
7.
TEMPORARILY REMOVED EXISTING JOCKEY PUMP IN ORDER TO
REMOVE EXISTING FIRE PUMP AND INSTALL NEW FIRE PUMP.
8.
RE-INSTALL JOCKEY PUMP AFTER NEW FIRE PUMP IS INSTALLED.
9.
MAKE CONNECTIONS FROM FIRE PUMP CONTROLLER TO FIRE ALARM
MONITOR MODULES FOR FIRE PUMP RUNNING, PHASE REVERSAL,
POWER LOSS, AND LOSS OF PHASE.
10. PERFORM COMPLETE FIRE PUMP START-UP AND ACCEPTANCE TEST
OF FIRE PUMP SYSTEM WITH FACTORY TECHNICIAN.
edm
architecture
engineering
management
pittsfield, ma
unionville, ct
troy, ny
(888) 336-6500
team@edm-ae.com
consultants:
design by:
lff
drawn by:
lff
checked by:
lff
approved by:
lff
Norrback School
Fire Pump
Replacement
44 Malden Street
Worcester, Mass. 01606
keyplan:
N
issue / rev.: date:
issued for:
by:
Fire Pump Room
date:
02/22/2023
project number:
COW-6094
scale:
As indicated
drawing number:
FP-100
SECTION 210000
FIRE PROTECTION SYSTEMS
PART 1 - GENERAL
1.1
A.
GENERAL PROVISIONS
Drawings and general provisions of the Contract, including General and
Supplementary Conditions, and other Division 01 Specification Sections, apply to this
Section.
1.2
DESCRIPTION OF WORK
A. Work Included: Provide labor, materials, and equipment necessary to complete the
work of this Section, including but not limited to the following:
1. Electric driven slit-case horizontal fire pump, and solid-state soft start fire pump
controller with autotransfer switch.
2. Gate valves, check valves, and drain valves.
3. Preparation of complete "Fire Protection Working Drawings/Shop Drawings".
4. Tests of all piping, systems, devices, and alarms.
5. Pressure gauges.
6. Identification of systems, equipment, and valves.
7. Permits, fees and inspections.
8. System and equipment start-ups; instructions.
9. Operation and Maintenance Manuals.
10. Vibration isolators, flexible connectors, expansion fittings.
11. Drilling for installation of inserts.
12. Hoisting equipment for the Work of this Section.
13. Coordination with General Contractor for use of staging, planking, and
scaffolding, interior and exterior, which is the responsibility of the General
Contractor
B. Alternates: Not Applicable.
C. Items to be Installed Only: Not Applicable.
D. Related Work: The following items are not included in this Section and will be
performed under the designated Sections.
1. Division 26 - ELECTRICAL WORK for fire alarm devices and wiring.
E. Perform work and provide material and equipment as shown on Drawings and as
specified or indicated in this Section of the Specifications. Completely coordinate
work of this Section with work of other trades and provide a complete and fully
functional installation.
F. Drawings and Specifications form complimentary requirements; provide work
specified and not shown, and work shown and not specified as though explicitly
required by both. Although work is not specifically shown or specified, provide
supplementary or miscellaneous items, appurtenances, devices, and materials
obviously necessary for a sound, secure and complete installation.
G. Give notices, file plans, obtain permits and licenses, pay fees, and back charges,
and obtain necessary approvals from authorities that have jurisdiction as required to
perform work in accordance with all legal requirements and with Specifications,
Drawings, Addenda and Change Orders, all of which are part of Contract
Documents.
1.3
A.
B.
SUBMITTALS
Comply with requirements specified in Division 1 — SUBMITTALS
REQUIREMENTS.
Shop Drawings: Submittals shall include but not be limited to the following.
Shop/working drawings shall be stamped and sealed by a competent professional
engineer licensed in the Commonwealth of Massachusetts.
1. Fire Protection Products:
a. Fire pump and fire pump controller.
1.4
A.
DEFINITIONS
As used in this Section, "provide" means "furnish and install" and "POS" means
"Provided Under Other Sections". "Furnish" means "to purchase and deliver to the
project site complete with every necessary appurtenance and support," and "Install"
means "to unload at the delivery point at the site and perform every operation
necessary to establish secure mounting and correct operation at the proper location
in the project."
1.5 CONTRACT DOCUMENTS
A. Listing of Drawings does not limit responsibility of determining full extent of work
required by Contract Documents. Refer to Architectural, HVAC, Plumbing, Fire
Protection, Electrical, Structural, and other Drawings, and other Sections that
indicate types of construction in which work shall be installed and work of other
trades with which work of this Section must be coordinated.
B. Except where modified by a specific notation to the contrary, it shall be understood
that the indication and/or description of any item, in the drawings or specifications or
both, carries with it the instruction to furnish and install the item, regardless of
whether or not this instruction is explicitly stated as part of the indication or
description.
C. Items referred to in singular number in Contract Documents shall be provided in
quantities necessary to complete work.
D. Drawings are diagrammatic. They are not intended to be absolutely precise; they
are not intended to specify or to show every offset, fitting, and component. The
purpose of the drawings is to indicate a systems concept, the main components of
the systems, and the approximate geometrical relationships. Based on the systems
concept, the main components, and the approximate geometrical relationships, the
contractor shall provide all other components and materials necessary to make the
systems fully complete and operational.
E. Information and components shown on riser diagrams but not shown on plans, and
vice versa, shall apply or be provided as if expressly required on both.
F. Data that may be furnished electronically by the Designer is diagrammatic. Such
electronically furnished information is subject to the same limitation of precision as
heretofore described. If furnished, such data is for convenience and generalized
reference, and shall not substitute for Designer's sealed or stamped construction
documents.
1.6 DISCREPANCIES IN DOCUMENTS
A. Where Drawings or Specifications conflict or are unclear, advise Designer in writing
before Award of Contract. Otherwise, Designer's interpretation of Contract
Documents shall be final, and no additional compensation shall be permitted due to
discrepancies or unclarities thus resolved.
B. Where Drawings or Specifications do not coincide with manufacturers'
recommendations, or with applicable codes and standards, alert Designer in writing
before installation. Otherwise, make changes in installed work as Designer requires
within Contract Price.
C. If the required material, installation, or work can be interpreted differently from
drawing to drawing, or between drawings and specs, this contractor shall provide
that material, installation, or work which is of the higher standard.
D. It is the intent of these contract documents to have the contractor provide systems
and components that are fully complete and operational and fully suitable for the
intended use. There may be situations in the documents were insufficient
information exists to precisely describe a certain component or subsystem, or the
routing of a component. In cases such as this, where the contractor has failed to
notify the Designer of the situation in accordance with the paragraph above, the
contractor shall provide the specific component or subsystem with all parts
necessary for the intended use, fully complete and operational, and installed in
workmanlike manner either concealed or exposed per the design intent.
1. In cases covered by the paragraph above, where the contractor believes he
needs engineering guidance, he shall submit a sketch identifying his proposed
solution and the Designer shall review, note if necessary, and approve the
sketch.
1.7
MODIFICATIONS IN LAYOUT
A. Fire Protection Drawings are diagrammatic. They indicate general arrangements of
mechanical and electrical systems and other work. They do not show all offsets
required for coordination nor do they show the exact routings and locations needed
to coordinate with structure and other trades and to meet architectural requirements.
B. In all spaces, prior to installation of visible material and equipment, including access
panels, review Architectural Drawings for exact locations and where not definitely
indicated, request information from Designer.
C. Check Contract Drawings as well as Shop Drawings of all subcontractors to verify
and coordinate spaces in which work of this Section will be installed.
D. Maintain maximum headroom at all locations. All piping and associated components
to be as tight to underside of structure as possible.
E. Make reasonable modifications in layout and components needed to prevent conflict
with work of other trades and to coordinate according to Paragraphs A, B, C, D
above. Systems shall be run in a rectilinear fashion.
F. Where conflicts or potential conflicts exist and engineering guidance is desired,
submit sketch of proposed resolution to Designer for review and approval.
1.8
A.
B.
C.
CODES, STANDARDS, AUTHORITIES AND PERMITS
Perform work strictly as required by rules, regulations, standards, codes, ordinances,
and laws of local, state, and Federal governments, and other authorities that have
legal jurisdiction over the site. Materials and equipment shall be manufactured,
installed, and tested as specified in latest editions of applicable publications,
standards, rulings and determinations of:
1. Local and state building and fire codes.
a. Massachusetts State Building Code, 9th edition.
b. Massachusetts Comprehensive Fire Safety Code, Jan. 1, 2018
2. National Fire Protection Association (NFPA).
a. NFPA 20 “Standard for the Installation of Stationary Pumps for Fire
Protection”, 2013 edition.
3. American Insurance Association (A.I.A.) (formerly National Board of Fire
Underwriters).
4. Occupational Safety and Health Act (OSHA).
5. Underwriters' Laboratories (UL).
6. American National Standards Institute (ANSI).
7. FM Global (FM).
Material and equipment shall be listed by Underwriters' Laboratories (UL), and FM
Global for intended service.
When requirements cited in this Specification conflict with each other or with
Contract Documents, most stringent shall govern work. Designer may relax this
requirement when such relaxation does not violate ruling of authorities that have
jurisdiction. Approval for such relaxation shall be obtained in writing.
1.9
GUARANTEE AND 24-HOUR SERVICE
A. Guarantee Work of this Section in writing for one year following the date of
Substantial Completion. The guarantee shall repair or replace defective materials,
equipment, workmanship, and installation that develop within this period, promptly
and to Designer's satisfaction and correct damage caused in making necessary
repairs and replacements under guarantee within Contract Price.
B. In addition to guarantee requirements of Division 01 and of Subparagraph A above,
obtain written equipment and material warranties offered in manufacturer's published
data without exclusion or limitation.
C. Replace material and equipment that require excessive service during guarantee
period as defined and as directed by Designer.
D. Provide 24-hour service beginning on the date the project is first occupied for public
use by the Owner, whether or not fully occupied, and lasting until the termination of
the guarantee period. Service shall be at no cost to the Owner. Service can be
provided by this contractor or a separate service organization. Choice of service
organization shall be subject to Owner’s approval. Submit name and a phone
number that will be answered on a 24-hour basis each day of the week, for the
duration of the service.
E. Submit copies of equipment and material warranties to Designer before final
payment.
F. At end of guarantee period, transfer manufacturers' equipment and material
warranties still in force to Owner.
G. This Article shall not be interpreted to limit Owner's rights under applicable codes
and laws and under this Contract.
H. Part 2 Paragraphs of this Specification may specify warranty requirements that
exceed those of this Paragraph.
I. Provide manufacturer's engineering and technical staff at site to analyze and rectify
problems that develop during guarantee period immediately. If problems cannot be
rectified immediately to Owner’s Project Manager's satisfaction, advise Designer in
writing, describe efforts to rectify situation, and provide analysis of cause of problem.
Designer will suggest course of action.
1.10
A.
B.
RECORD DRAWINGS
Comply with requirements specified in Division 1 — CONTRACT CLOSEOUT.
Drawings shall show record condition of details, sections, riser diagrams, control
changes and corrections to schedules. Schedules shall show actual manufacturer
and make and model numbers of final equipment installation.
1.11 BULLETINS, MANUALS, AND OPERATING INSTRUCTIONS, AND PROTECTION
A. Obtain at time of purchase of equipment, three copies of operation, lubrication, and
maintenance manuals for all items. Assemble literature in coordinated manuals with
additional information describing combined operation of field assembled units,
including as built wiring diagrams. Manual shall contain names and addresses of
manufacturers and local representatives who stock or furnish repair parts for items
or equipment. Divide manuals into three sections or books as follows:
1. Directions for and sequence of operation of each item of Fire Protection
systems. Sequence shall list valves, switches, and other devices used to
start, stop and control system. Detail procedure to be followed in case of
malfunctions.
2. Detailed maintenance and troubleshooting manuals containing data furnished
by manufacturer for complete maintenance. Include copy of balancing report.
3. Lubrication instructions detailing type of lubricant, amount, and intervals
recommended by manufacturer for each item of equipment. Include additional
instructions necessary for implementation of first-class lubrication program.
Include approved summary of lubrication instructions in chart form, where
appropriate.
B. Furnish three copies of manuals to Designer for approval and distribution to Owner
Project Manager. Deliver manuals no less than 30 days prior to acceptance of
equipment to permit Owner's personnel to become familiar with equipment and
operation prior to acceptance.
C. Provide framed and glazed charts as follows: mount as directed by Designer.
1. Flow diagrams from first part of manual as described above.
2. Valve directory.
3. Lubrication chart from third part of manual.
D. Operating instructions: Upon completion of installation or when Owner Project
Manager accepts portions of building and equipment for operational use, instruct
Owner's operating personnel in any or all parts of various systems. Instructions shall
be performed by factory trained personnel. Owner shall determine which systems
require additional instructions. Duration of instructions shall take equipment through
complete cycle of operation (at least two working days). Make adjustments needed
under operating conditions.
E. Each contractor shall be responsible for his work and equipment until finally
inspected, tested, and accepted. Carefully store materials and equipment which are
not immediately installed after delivery to site. Close open ends of work with
temporary covers or plug during construction to prevent entry of obstructing material.
F. Each separate contractor shall protect the work and material of other trades that
might be damaged by his work or workmen and make good all damage thus caused.
1.12
A.
B.
COORDINATION DRAWINGS
Refer to Division 1 — PROJECT MANAGEMENT AND COORDINATION for
coordination drawing requirements.
Coordination Drawings include but are not necessarily limited to:
1. Major electrical conduit runs, panelboards, feeder conduit and racks of branch
conduit.
2. Sprinkler piping and heads.
1.13 SPRINKLER WORKING PLANS
A. Definition: Working plans are the installation shop drawings required by NFPA
Standard 13, NFPA Standard 20, and normally prepared by the installing sub-
contractor.
B. Prepare working plans according to the requirements of NFPA Standard 13, and 20.
Working plans shall be prepared by a NICET-certified Level III or IV automatic
sprinkler system engineering technician and be stamped by a professional engineer
registered in the jurisdiction of the Project.
C. Submit working plans to the authorities having jurisdiction for approval, including:
1. Building Department.
2. Fire Department.
3. User Agency's Insurance Underwriter.
4. Designer.
D. Deviation from the approved plans will require re-approval by the reviewing
authorities.
E. Submit working plans to the Designer in one complete package, after review by the
other authorities having jurisdiction. Plans submitted without P.E. stamp will be
returned without review.
1.14 WATER SUPPLY TEST DATA
A. Perform hydrant flow test under the work of this Section for water supply
characteristics to be used for hydraulic calculations if supplied information is more
than 1 year old.
PART 2 - PRODUCTS
2.1
MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers
offering fire protection system products which may be incorporated in the work
include, but are not limited to, the following:
1. Gate Valves:
a. Fairbanks
b. Jenkins
c. Kennedy Valve, Div of ITT Grinnell Valve Co., Inc.
d. Stockham
e. Victaulic Company of America.
2. Swing Check Valves:
a. Fairbanks
b. Jenkins
c. Kennedy Valve, Div of ITT Grinnell Valve Co., Inc.
d. Star Sprinkler Corp.
e. Stockham
3. Grooved Mechanical Couplings:
a. Stockham
b. Victaulic
c. Grinnell
4. Automatic (Ball Drip) Drain Valves:
a. Tyco Fire & Building Products LP
b. Reliable Automatic Sprinkler Co.
5. Fire Pump:
a. Peerless Pump Company
b. Patterson Pump Company
c. Fairbank-Morse
6. Fire Pump Controller:
a. Firetrol
b. Joslyn-Clark
c. Metron
2.2
PIPING, FITTINGS AND JOINTS
A. Sprinkler Piping:
1. Steel: 2 inches and smaller: ASTM 135 Schedule 40 black steel with threaded
joints for wet-pipe system and galvanized with galvanized threaded joints for
drains.
2. Steel: 2-1/2 inches and larger: ASTM 135 Schedule 10 black steel with roll
grooved joints for wet-pipe system.
B. Fittings:
1. Galvanized and Uncoated Gray Iron Threaded Fitting: ASME B16.4, Class
125.
2. Malleable Iron: ANSI B16.3.
3. Steel Flange and Flanged Fitting: ASMEI 16.1, Class 125.
4. Cast Iron Flanges: ASME 16.1, Class 150.
C. Grooved Fittings and Couplings:
1. Ductile iron housing clamps to engage and lock pressure-responsive, synthetic
rubber sealing gasket, steel bolts, nuts, and washers; galvanized for
galvanized pipe.
a. Rigid Type: Rigid Type: Housings shall be cast with offsetting, angle-
pattern bolt pads to provide system rigidity and support and hanging in
accordance with NFPA 13. Tongue and recess rigid type couplings shall
only be permitted if the contractor uses a torque wrench for installation.
Required torque shall be in accordance with the manufacturer's
recommendations. Contractor shall remove and replace any improperly
installed joints.
1) 1-1/4" thru 4": "Installation Ready" rigid type coupling designed for
direct "stab" installation onto grooved end pipe without prior
disassembly of the coupling equal to Victaulic FireLock® EZ Style
009.
2) 5" and Larger: Standard rigid joint equal to Victaulic FireLock®
Style 005 or Style 07 Zero-Flex®.
b. Flexible Type: Use in seismic areas where required by NFPA 13.
Victaulic Style 75, 004, or 77.
c. Coupling gaskets shall be listed for use as follows:
Fire Protection
Service
Dry Systems
Freezer
Applications
Water/Wet
Systems
Temperature Range Gasket Recommendation
Ambient
-40°F to 0°F
FlushSeal® or EZ Style 009
design, Grade EPDM, Type A
FlushSeal®, Grade L, Silicone
Ambient
C-Shape or EZ Style 009 design,
Grade EPDM, Type A
2. Flange Adapters: Victaulic flange adapters shall be ASTM A536 ductile iron,
flat faced, for incorporating flanged components with ANSI Class 125 and 150
bolt-hole patterns to a grooved piping system. Victaulic Style 741 or 744.
3. Compatibility: Couplings and fittings shall be of a single manufacturer or shall
be certified as compatible by both manufacturers.
2.3
A.
JOINING MATERIALS
Gasket Materials: Thickness, material, and type suitable for fluid or gas to be
handled, and design temperatures and pressures.
2.4
GENERAL DUTY VALVES
A. Gate valves, 2 inches and smaller shall be outside screw and yoke, bronze, rising
stem, wedge disc type, threaded, conforming to MSS SP-80. Gate valve 2-1/2
inches and larger shall be iron body, bronze trim, outside screw and yoke, flanged,
UL/FM listed conforming to MSS SP-70. All valves shall be UL listed for at least 175
psi working water pressure (wwp).
B. Globe and angle valves may be used as auxiliary valves (drain valves, test valves,
trim valves, and valves on compressed air piping) for diameters not over 2 in. They
shall be bronze, rising stem, with bronze disc, threaded, conforming to MSS SP-80
Class 150.
C. Check valves shall be swing type except as noted. Valves 2 inches and smaller
shall be bronze, regrinding type with renewable disc, screwed caps, threaded, class
150 conforming to MSS SP-80. Check valves 2-1/2 inches and greater shall be iron
body, bronze trim, bolted cover, flanged, conforming to MSS SP-71, UL listed for 175
psi wwp.
2.5
PIPE AND HANGER SUPPORTS
A. Provide pipe supports, sway braces, hangers, and clamps conforming to NFPA 13
and listed by UL and approved by FM. Provide protection of piping against
earthquake damage in accordance with NFPA 13.
B. Piping 2-1/2” and smaller: Carbon Steel, adjustable swivel.
C. Piping 3” and larger: Carbon Steel, adjustable clevis.
D. Hanger Rods: Electro-Galvanized mild steel threaded both ends, threaded one end,
or continuous threaded.
E. Riser Clamps: Carbon Steel riser clamp.
F. Floor Supports: Schedule 40 black steel adjustable pipe saddle, lock nut, nipple,
floor flange and concrete pier or steel support.
2.6
FIRE PUMP AND ACCESSORIES
A. Description: Factory-assembled and -tested fire-pump and driver unit.
B. Base: Fabricated and attached to fire-pump and driver unit, with reinforcement to
resist movement of pump during seismic events when base is anchored to building
substrate.
C. Finish: Red paint applied to factory-assembled and -tested unit before shipping.
D. Provide an electrical driven horizontal split-case fire pump, designed in accordance
with the requirements of NFPA 20. Equipment to be stored in factory until installation
date, where it shall then be delivered to the site. Coordinate the lifting and
installation of pump, motor, and all required connections.
E. The fire-pumping system shall be designed to deliver 750 GPM when operating at
100 PSI using a 60 HP Motor. The pump shall also deliver not less than 150% of
rated capacity at a pressure not less than 65% of rated pressure. Motor and pump
speed shall not exceed 3560 RPM. Supply power to the system shall be 480 Volts,
3 phase, 60 Hertz. Pump is to be mounted horizontally with both pump and drive on
the same base for Fire Pump service Constructed in accordance with NFPA-20, UL
448 and approved by U.L. and F.M.
F. Pump:
1. Standard: UL 448, for split-case pumps for fire service.
2. Casing: Axially split case, cast iron, with ASME B16.1 pipe-flange connections.
3. Impeller: Double suction, cast bronze, statically and dynamically balanced, and
keyed to shaft.
4. Wear Rings: Replaceable bronze.
5. Shaft and Sleeve: Alloy steel shaft with bronze sleeve.
a. Shaft Bearings: Grease-lubricated ball bearings in cast-iron housing.
b. Seals: Stuffing box with minimum of four rings of graphite-impregnated
braided yarn and bronze packing gland.
6. Mounting: Pump and driver shafts are horizontal, with pump and driver on
same base.
G. Coupling: Flexible and capable of absorbing torsional vibration and shaft
misalignment. Include metal coupling guard.
H. Driver:
1. Standard: UL 1004A.
2. Type: Electric motor; NEMA MG 1, polyphase Design B.
I. Capacities and Characteristics:
1. Rated Capacity: 750 GPM.
2. Total Rated Head: 100 psi.
3. Inlet Flange: Class 125.
4. Outlet Flange: Class 125.
5. Motor Horsepower: 60 hp.
6. Motor Speed: 3560 rpm.
7. Electrical Characteristics:
a. Volts: 480V.
b. Phase: Three.
c. Hertz: 60.
J. Pump shall include:
1. Pressures gauges.
2. Circulation relief valve.
3. Automatic air release valve.
4. Concentric discharge increase.
5. Concentric suction reducer.
K. Submittal drawings shall include certified dimensional prints, bill of material, and
curves of performance characteristics on pump unit proposed. Pumps shall be
hydrostatically tested to twice shut-off pressure, or to 250 psi, whichever is greater.
L. Automatic Air-Release Valves: Comply with NFPA 20 for installation in fire-pump
casing.
M. Circulation Relief Valves: UL 1478, brass, spring loaded; for installation in pump
discharge piping.
N. Outlet Fitting: Concentric tapered reducer at pump discharge outlet.
O. Provide services of factory technician to supervise installation and to conduct final
field acceptance tests.
edm
architecture
engineering
management
pittsfield, ma
unionville, ct
troy, ny
(888) 336-6500
team@edm-ae.com
consultants:
design by:
lff
drawn by:
lff
checked by:
lff
approved by:
lff
Norrback School
Fire Pump
Replacement
44 Malden Street
Worcester, Mass. 01606
keyplan:
N
issue / rev.: date:
issued for:
by:
Fire Protection Specifications
date:
02/22/2023
project number:
COW-6094
scale:
drawing number:
FP-101
2.7 AUTOMATIC FIRE PUMP CONTROLLER
A. The fire pump controller shall be a UL/FM labeled combination manual and
automatic type. Provide controller with floor mounted start/stop push buttons, 0-300#
pressure transducer, minimum run timer Firetrol Mark III FTA1930/FTA950 Solid
State Reduced Current Starting or equal.
B. The enclosure NEMA 2 floor mounted and meeting the requirements of the most
recently mandated edition of NFPA 20 and shall be listed by Underwriters
Laboratories and approved by Factory Mutual.
C. The withstand rating of the controller shall not be less than 100,000 RMS
Symmetrical at 480 volts.
D. The controller shall include a motor rated combination isolating disconnect
switch/circuit breaker, mechanically interlocked, and operated with a single,
externally mounted handle. When moving the handle from OFF to ON, the
interlocking mechanism shall sequence the isolating disconnect switch ON first and
then the circuit breaker. When the handle is moved from ON to OFF, the
mechanism shall sequence the circuit breaker open first, and then the isolating
disconnect switch. The isolating disconnect switch and circuit breaker shall be
mechanically interlocked so that the enclosure door cannot be opened with the
handle in the ON position except by a hidden tool operated defeater mechanism.
E. The controller shall have a minimum running period timer set for ten minutes.
Terminals shall be provided to field convert the controller from automatic to manual
shutdown.
F. The controller shall have externally mounted, individual visual indicators for:
1. Power available
2. Low pressure
3. Local start
4. Remote start
5. Phase failure
6. Phase reversal
7. Interlock on
8. Pump running
9. Low room temperature
10. Run timer on.
G. The controller shall be supplied with duplicate individual alarm contacts for:
1. Phase reversal
2. Phase failure
3. Pump running
4. Low room temperature.
H. The controller shall have a USB port for recording pressure.
I. The power transfer switch shall be designed for use with Generator set emergency
power source. The power transfer switch shall include a motor rated
disconnect/isolating switch capable of interrupting the motor locked rotor current.
The disconnect/isolating switch shall be mechanically interlocked so that the
enclosure door cannot be opened with the handle in the ON position except by a
hidden tool operated defeater mechanism.
J. The transfer switch circuitry shall be capable of sensing both the normal power
source and the emergency source. The normal power source pick up shall be set at
90% nominal voltage and 95% nominal frequency. All voltage sensing, frequency
sensing, and time delays shall be field adjustable. The transfer signal shall be
delayed for one second, delaying the transfer and engine start signals so as to
override momentary normal power outages.
K. The transfer switch shall have TRANSFER SWITCH NORMAL, TRANSFER
SWITCH EMERGENCY, and EMERGENCY ISOLATING SWITCH OFF pilot lights,
TEST, and SILENCE ALARM pushbuttons mounted on the flange of the enclosure.
The transfer switch shall be electrically operated and mechanically held and shall be
capable of being operated by a manual transfer mechanism located on the switch.
L. The transfer switch must be manufactured by the fire pump controller manufacturer
and be in the same enclosure and rated for fire service. The maximum width on the
fire pump controller shall be 64”.
PART 3 - EXECUTION
3.1
A.
B.
EXAMINATION
Examine rough-in for pipe penetrations to verify actual locations of piping
connections prior to installing.
Do not proceed until unsatisfactory conditions have been corrected.
3.2 PIPE APPLICATIONS
A. Install piping in accordance with NFPA 13 for sprinkler system, and hose system,
and NFPA 20 for fire pump system.
B. Install Schedule 40 steel pipe with threaded joints and fittings for 2-inch and smaller
on wet-pipe sprinklers.
C. Install Schedule 10 steel pipe with roll-grooved ends and grooved mechanical
couplings for piping 2-1/2 inch and larger on wet-pipe sprinklers.
D. Install Schedule 40 galvanized steel pipe with threaded joints and fittings for 2-inch
and smaller on drains.
3.3 HANGERS AND SUPPORT
A. Support all piping included in the Work of this Section with hangers and rods
attached to the building structure. Hang piping in compliance with NFPA Standards
and the requirements of this Section.
B. Space hangers and supports for horizontal steel sprinkler piping according to the
following schedule:
Pipe Size:
Maximum Hanger Spacing:
1-1/4 inches and smaller
1-1/2 inches to 3 inches
4 inches to 5 inches
6 inch and larger
8'-0"
10'-0"
12'-0"
15'-0"
C. Hang sprinkler piping to support the weight of the water filled pipe plus 250 pounds at
the hanger.
D. Hang horizontal fire line piping to support the weight of five times the weight of the
water filled pipe plus 250 pounds at the hanger.
E. Provide steel angle supports attached to the building structure to support piping
below ductwork.
3.4 PIPING INSTALLATIONS
A. Locations and Arrangements: Drawings (plans, schematics, and diagrams) indicate
the general location and arrangement of piping systems. So far as practical, install
piping as indicated.
1. Deviations from approved “Working Plans” for sprinkler piping, require written
approval of the authority having jurisdiction. Written approval shall be on file
with the Designer prior to deviating for the approved “Working Plans.”
B. Install sprinkler piping to provide for system drainage in accordance with NFPA 13.
C. Use approved fittings to make all changes in direction, branch takeoffs from mains,
and reductions in pipe sizes.
D. Install unions in pipes 2-inch and smaller, adjacent to each valve. Unions are not
required on flanged devices or in piping installations using grooved mechanical
couplings.
E. Install flanges or flange adaptors on valves, apparatus, and equipment having 2-1/2
inch and larger connections.
F. Hangers and Supports: Comply with the requirements of NFPA 13. Hanger and
support spacing and locations for piping joined with grooved mechanical couplings
shall be in accordance with the grooved mechanical coupling manufacturer’s written
instructions, for rigid systems. Provide protection from damage where subject to
earthquake in accordance with NFPA 13.
G. Use galvanized pipe and fittings for all drain lines.
H. Die cut screw joints with full cut standard taper pipe threads with red lead and
linseed oil or other non_toxic joint compound applied to male threads only.
I. Install valves with stems upright or horizontal, not inverted. Remove protective
coating after installation.
J. Flush entire piping system of foreign matter.
3.5
A.
PIPE JOINT CONSTRUCTION
Threaded Joints: Conform to ANSI B1.20.1, tapered pipe threads for field cut
threads. Join pipe, fittings, and valves as follows:
1. Note the internal length of threads in fittings or valve ends, and proximity of
internal seat or wall, to determine how far pipe should be threaded into joint.
2. Align threads at point of assembly.
3. Apply appropriate tape or thread compound to the external pipe threads.
4. Assemble joint to appropriate thread depth. When using a wrench on valves,
place the wrench on the valve end into which the pipe is being threaded.
5. Damaged Threads: Do no use pipe with threads which are corroded, or
damaged. If a weld opens during cutting or threading operations, that portion
of pipe shall not be used.
6. Flanged Joints: Align flanges surfaces parallel. Assemble joints by sequencing
bolt tightening to make initial contact of flanges and gaskets as flat and parallel
as possible. Use suitable lubricants on bolt threads. Tighten bolts gradually
and uniformly to appropriate torque specified by the bolt manufacturer.
7. Mechanical Grooved Joints: Cut or roll grooves on pipe ends dimensionally
compatible with the couplings.
8. End Treatment: After cutting pipe lengths, remove burrs and fins from pipe
ends.
3.6
A.
B.
VALVE INSTALLATION
General: Install fire protection specialty valves, fittings, and specialties in
accordance with the manufacturer’s written instructions, NFPA 13, and the authority
having jurisdiction.
Gate Valves: Install supervised-open gate valves so located to control all sources of
water supply except fire department connections. Where there is more than one
control valve, provide permanently marked identification signs indicating the portion
of the system controlled by each valve.
3.7
FIRE PUMP INSTALLATION
A. Install complete fire pump system in compliance with NFPA-20.
B. Completely align and level pump, motor, and base. Where pumps and motor are
shipped as a unit, realign them in the field.
C. Grout fire pump base plate completely to provide a non-deflecting support.
D. Secure pumps to bases with proper size anchor bolts.
E. Pump manufacturer to set packing, adjust impellers and check alignment prior to
start-up.
F. Construct all apparatus of materials and pressure ratings suitable for the conditions
encountered during continuous operation.
G. Provide casing connections for vent, drain, suction and discharge pressure gauges.
H. Balance impellers and all other moving components statically and dynamically.
I. Pump must operate stably without pulsation, vibration, or internal recirculation.
Pump operating characteristics at the design point must be such that a variation of
10% in head results in not more than a 15% variation in gpm and does not affect the
stability of operation of the pump.
J. Pipe all drains to the existing floor drain.
K. Pipe relief valve to the existing floor drain.
L. Connect fire pump sensing line after system check valve to fire pump controller.
M. Connect power to fire pump controller and pump motor.
N. Install and connect power and wiring for fire pump remote monitoring by building fire
alarm system.
3.8
A.
SIGNS
Signs and nameplates in accordance with NFPA standards and/or these
specifications shall be provided at all drains, test, alarm valves and other areas as
required by NFPA 13 Standards, NFPA 20 Standards as well as fire pump room, and
sprinkler valve rooms as required by Massachusetts State Building Code.
3.9
A.
B.
FIELD QUALITY CONTROL
Flush, test and inspect fire pump system in accordance with NFPA 20.
Replace piping system components which do not pass the test procedures specified,
and retest repaired portion of the system.
3.10 TESTING
A. Testing and flushing of the fire protection systems shall be done at the expense of
this Subcontractor and with equipment furnished by him. Testing shall be done in
the presence of duly authorized inspectors and representatives of the Designer and
Owner’s Project Manager within forty-eight (48) hour notice given those authorities.
Prior to testing, the system shall be thoroughly flushed with clean water.
B. The system shall be repaired and retested until made perfect, without additional
expense to Owner.
C. Fire Pump — perform acceptance test in accordance with NFPA 20 with a factory
technician present at start up and field acceptance test.
D. A factory certified pump performance test shall be performed at the factory prior to
shipping.
E. Training shall be onsite instruction to owner’s representatives for system review and
operation. A minimum of 5 (five) days’ notice is to be given to the owner to establish
a time for this review.
F. Fire pump manufacturer will be required to submit a notarized Certificate of
Compliance certifying that all components of the fire pump unit were in fact supplied
by the fire pump manufacturer and acknowledging its responsibility for the proper
function of the unit.
G. Material and test certificates must be signed by the Owner’s Project Manager prior to
and upon completion of testing. Final test reports must be approved in writing by
local authorities.
H. Results of tests shall be recorded and submitted using the forms in NFPA #13, for
review by the Engineer. The Material and Test Certificate shall also be sent to the
Owner’s Project Manager.
I. Provide all necessary and appropriate personnel to participate in and coordinate fire
protection systems with all fire alarm testing, or other systems testing which may
interface with fire protection system. Participation shall include all preliminary
testing, walk-through testing prior to official walk-through testing and any re-testing if
required.
END OF SECTION
edm
architecture
engineering
management
pittsfield, ma
unionville, ct
troy, ny
(888) 336-6500
team@edm-ae.com
consultants:
design by:
lff
drawn by:
lff
checked by:
lff
approved by:
lff
Norrback School
Fire Pump
Replacement
44 Malden Street
Worcester, Mass. 01606
keyplan:
N
issue / rev.: date:
issued for:
by:
Fire Protection Specifications
date:
02/22/2023
project number:
COW-6094
scale:
drawing number:
FP-102
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

IFB - Franklin Ridge Booster Pump Station Start / End Dates & Times:

Town of Franklin MA

Bid Due: 5/01/2024

Bid Solicitation: BD-24-1026-DOE02-DOE01-99820 Responses Due in 48 Days, 5 Hours, 13 Minutes Header

Commonwealth of Massachusetts

Bid Due: 5/01/2024

Bid Solicitation: BD-24-1045-BWR00-BWR01-99902 Responses Due in 69 Days, 22 Hours, 30 Minutes Header

Commonwealth of Massachusetts

Bid Due: 5/24/2024

Bid Solicitation: BD-24-1142-111-111-99918 Header Information Bid Number: BD-24-1142-111-111-99918 Description: RFP - Acquisition Fund

Commonwealth of Massachusetts

Bid Due: 5/16/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.