Agency: | City of Lewiston |
---|---|
State: | Maine |
Type of Government: | State & Local |
Category: |
|
Posted: | Jul 25, 2023 |
Due: | Aug 1, 2023 |
Publication URL: | To access bid details, please log in. |
Description: |
The work for the HALL AND COBURN STREETS WATER MAIN REPLACEMENT AND ROAD REHABILITATION shall consist of, but not be limited to, the complete and satisfactory construction and installation of:
- 300 LF of 8” Dia. DI Water Main
Work will include the installation of a new water main and services within a portion of Hall Street, and the entirety of Coburn Street. Additional work will include adjusting an existing catch basin on Thompson Street, and laying a new, stormdrain lead to connect to an existing catch basin within the gutterline of Lisbon Street. The existing pavement within Coburn Street will be stripped & paved, with a Type A gravel shim. The existing pavement outside of the utility trench within Hall Street will receive a 1” shim & overlay. Sporadic sidewalks in the right of way will be removed, as shown on the project plans. Coordination with the Water District for requisite shut-downs will be required. |
Publication Date/Time: |
7/5/2023 12:00 AM |
Publication Information: |
None |
Closing Date/Time: |
8/1/2023 2:00 PM |
Submittal Information: |
Purchasing Agent, City Hall, 27 Pine St. Lewiston, ME 04240 |
Bid Opening Information: |
Admin Conf. Room/Zoom Meeting |
Pre-bid Meeting: |
07/11/2023 @ 10:15 am via ZOOM |
Contact Person: |
Allen Ward
Purchasing Agent Tel: 207-513-3040 E-mail: award@lewistonmaine.gov |
Download Available: |
Yes |
Fee: |
None |
Plan & Spec Available: |
Attached |
Business Hours: |
M-F 8:30 a.m. to 4:00 p.m. |
Fax Number: |
Faxed bids are not accepted. |
Plan Holders List: |
Attached |
Special Requirements: |
No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of ten percent (10%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated.
A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work. |
Miscellaneous: |
Faxed or e-mailed proposals will not be considered. |
Related Documents: |
With GovernmentContracts, you can:
Follow N3904024R0005- SSTG #1 and #2 Maintenace and Repair- Portsmouth Naval Shipyard Active
Federal Agency
Bid Due: 12/15/2024
Bid Date WIN(s) Municipality Description Date Posted/Updated 5/6/2024 LAP027756.00 Bar Harbor - Region
State Government of Maine
Bid Due: 5/06/2024
Follow JLG MANLIFT RENTALS (MULTIPLE) FOR FY24 Active Contract Opportunity Notice ID N3904023Q0171
DEPT OF DEFENSE
Bid Due: 7/07/2024
RFP #24061 Existing Facility Condition Assessment and Space Needs Analysis of the Portland
City of Portland
Bid Due: 5/08/2024