CEDAR CREEK WATER POLLUTION CONTROL PLANT DIGESTER REHABILITATION AND CLEANING – PHASE 1

Agency: Nassau County
State: New York
Type of Government: State & Local
Category:
  • F - Natural Resources and Conservation Services
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Posted: Nov 17, 2023
Due: Dec 19, 2023
Solicitation No: S35100-07G1
Publication URL: To access bid details, please log in.
Contract Number Contract Title Opening Date Bidders List Bid Items
S35100-07G1 CEDAR CREEK WATER POLLUTION CONTROL PLANT DIGESTER REHABILITATION AND CLEANING – PHASE 1
12/19/2023
Bidders List
Bid Items

Attachment Preview

PROPOSAL
FOR INFORMATIONAL PURPOSES ONLY - DO NOT USE FOR BIDDING
THIS PAGE SHALL BE COMPLETED BY CONTRACTOR SUBMITTING
A BID ON GENERAL CONSTRUCTION
CONTRACT NO. S35100-07G1
ITEM APPROXIMATE ITEMS WITH UNIT PRICE WRITTEN IN
NO. QUANTITIES
WORDS
1
Lump Sum Base Bid for furnishing all labor, materials,
equipment, and incidentals required for all work
for the described in the Technical Specifications
and not included in Item No. 2, unit costs, and
allowances listed below.
N/A
N/A
2
Lump Sum Lump sum for furnishing all labor, materials,
equipment, and incidentals required to design
and install a temporary groundwater dewatering
system to maintain required groundwater levels
in the vicinity of dewatered digesters during N/A
N/A
cleaning and rehabilitation. (Section 31 23 19)
P-9
55
PROPOSAL
FOR INFORMATIONAL PURPOSES ONLY - DO NOT USE FOR BIDDING
THIS PAGE SHALL BE COMPLETED BY CONTRACTOR SUBMITTING
A BID ON GENERAL CONSTRUCTION
CONTRACT NO. S35100-07G1
ITEM
NO.
3
APPROXIMATE
QUANTITIES
3,900,000
Gallons of
Digester Contents
ITEMS WITH UNIT PRICE WRITTEN IN
WORDS
All contract work associated with the removal,
dewatering, hauling, and disposal of digester
contents from three anaerobic digester,
including but not limited to operation of the tank
pump out system, odor control system, and
sludge dewatering system.
Per Gallon of Digester
Contents Removed
4
355 Weekdays All contract work associated with the continuous
operation and maintenance of the groundwater
dewatering system.
Per Weekday
5
155 Weekend All contract work associated with the continuous
Days or Holidays operation and maintenance of the groundwater
dewatering system.
Per Weekend Day or Holiday
P-11
57
PROPOSAL
FOR INFORMATIONAL PURPOSES ONLY - DO NOT USE FOR BIDDING
THIS PAGE SHALL BE COMPLETED BY CONTRACTOR SUBMITTING
A BID ON GENERAL CONSTRUCTION
CONTRACT NO. S35100-07G1
ITEM
NO.
6
APPROXIMATE
QUANTITIES
15 Each
ITEMS WITH UNIT PRICE WRITTEN IN
WORDS
All contract work associated with the removal
and replacement of 6-inch digester sludge plug
valves including required fittings and all other
incidentals.
Each
7
4 Each
All contract work associated with the removal
and replacement of 8-inch digester sludge plug
valves including required fittings and all other
incidentals.
Each
8
1 Each
All contract work associated with the removal
and replacement of 10-inch digester sludge plug
valves including required fittings and all other
incidentals.
Each
P-13
59
PROPOSAL
FOR INFORMATIONAL PURPOSES ONLY - DO NOT USE FOR BIDDING
THIS PAGE SHALL BE COMPLETED BY CONTRACTOR SUBMITTING
A BID ON GENERAL CONSTRUCTION
CONTRACT NO. S35100-07G1
ITEM
NO.
9
APPROXIMATE
QUANTITIES
3 Each
ITEMS WITH UNIT PRICE WRITTEN IN
WORDS
All contract work associated with the removal
and replacement of 4-inch digester gas plug
valves including required fittings and all other
incidentals.
Each
10
5 Each
All contract work associated with the removal
and replacement of 6-inch digester gas plug
valves including required fittings and all other
incidentals.
Each
11
9 Each
All contract work associated with the removal
and replacement of 8-inch digester gas plug
valves including required fittings and all other
incidentals.
Each
P-15
61
PROPOSAL
FOR INFORMATIONAL PURPOSES ONLY - DO NOT USE FOR BIDDING
THIS PAGE SHALL BE COMPLETED BY CONTRACTOR SUBMITTING
A BID ON GENERAL CONSTRUCTION
CONTRACT NO. S35100-07G1
ITEM
NO.
12
APPROXIMATE
QUANTITIES
9 Each
ITEMS WITH UNIT PRICE WRITTEN IN
WORDS
All contract work associated with the removal
and replacement of 10-inch digester gas plug
valves including required fittings and all other
incidentals.
Each
13
6 C.F.
Concrete Corbel Spall Repair
Per Cubic Foot
14
3,000 L.F.
Type I Epoxy Cementitious Crack Repair
Per Linear Foot
15
225 L.F.
Type II Epoxy Injection Crack Repair
Per Linear Foot
P-17
63
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

New York State Flexible Energy Technical Analysis (RFQL 5548) Due Date: 12/31/2026 Establishes

State Government of New York

Bid Due: 12/31/2026

Charge Ready NY 2.0 Equipment and Network Qualification Process (RFQL 5312) Due Date:

State Government of New York

Bid Due: 12/31/2025

Follow Elevator Maintenance & Repair Services MDC Brooklyn, New York Active Contract Opportunity

Federal Agency

Bid Due: 12/26/2026

BC Auxiliary Enterprises Corporation RFEI-Food Truck Services Project Description: The Brooklyn College Auxiliary

City University of New York

Bid Due: 6/28/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.