GLEN COVE AREA COLLECTION SYSTEM IMPROVEMENTS CENTRAL HOMES PS FORCE MAIN

Agency: Nassau County
State: New York
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Posted: Jan 18, 2024
Due: Feb 13, 2024
Solicitation No: S3P312-13G
Publication URL: To access bid details, please log in.
Contract Number Contract Title Opening Date Bidders List Bid Items
S3P312-13G

GLEN COVE AREA COLLECTION SYSTEM IMPROVEMENTS CENTRAL HOMES PS FORCE MAIN

2/13/2024
Bidders List
Bid Items

Attachment Preview

FOR INFORMATIONAL PURPOSES ONLY - DO NOT USE FOR BIDDING
BID FORM
CENTRAL HOMES PUMP STATION FORCE MAIN REPLACEMENT
IN THE CITY OF GLEN COVE
NEW YORK, 11542
CONTRACT NO. S3P312-13G GENERAL CONSTRUCTION
NAME OF BIDDER:
TO BE COMPLETED BY BIDDER SUBMITTING BID ON
CENTRAL HOMES PUMP STATION FORCE MAIN REPLACEMENT
IN THE CITY OF GLEN COVE, NEW YORK
CONTRACT NO. S3P312-13G GENERAL CONSTRUCTION
ITEM
NO.
1
2
TYPE
Base Bid
(Lump
Sum)
Allowance
DESCRIPTION
LUMP SUM PRICE for furnishing all
labor, equipment, materials, supervision
and incidentals necessary to complete the
work and make ready for operation.
ALLOWANCE NO. 1: for cleaning and/or
coating the force main terminal manhole as
directed by the County.
3 Allowance ALLOWANCE NO. 2: for unforeseen
conditions not specifically characterized in
the Contract Documents but required to
complete the project.
4 Unit Price Additional
Authorized
Excavation.
Estimated quantity of 100 cubic yards.
NOTE TO BIDDER: Include a separately sealed envelope containing a list of all subcontractors the
bidder will use to perform (a) plumbing and gas fitting, (b) heating, ventilating and air conditioning, and
(c) electric wiring and standard illuminating fixtures; and the respective agreed-upon amount to be paid
to each subcontractor. Write on the outside of the envelope the bidder’s name, the contract number,
and the words “List of Subcontractors”.
53
NO TEXT ON THIS PAGE
CONTRACT NO. S3P312-13G
GLEN COVE AREA COLLECTION SYSTEM IMPROVEMENTS
CENTRAL HOMES PS FORCE MAIN
TABLE OF CONTENTS
SECTION
DESCRIPTION
PAGE
DIVISION 1
GENERAL REQUIREMENTS
01010
01020
01050
01072
01150
01271
01300
01311
01312
01342
01355
01356
01370
01400
01410
01495
01500
01560
01600
01610
01660
01700
01710
01720
01760
01770
Summary of Work........................................................................................ 01010-1
Allowances................................................................................................... 01020-1
Field Engineering......................................................................................... 01050-1
Reference Standards..................................................................................... 01072-1
Measurement and Payment .......................................................................... 01150-1
Milestones, Liquidated Damages and Scheduling Constraints.................... 01271-1
Submittals .................................................................................................... 01300-1
Construction Scheduling .............................................................................. 01311-1
Project Meetings .......................................................................................... 01312-1
Samples ........................................................................................................ 01342-1
Hazardous Materials Control ....................................................................... 01355-1
Safe and Healthful Working Conditions...................................................... 01356-1
Schedule of Values ...................................................................................... 01370-1
Protection of Utilities ................................................................................... 01400-1
Job Photographs and Video ......................................................................... 01410-1
Spill Prevention and Control........................................................................ 01495-1
Temporary Facilities and Controls............................................................... 01500-1
Environmental Controls ............................................................................... 01560-1
Materials and Equipment ............................................................................. 01600-1
Transportation and Handling of Materials and Equipment.......................... 01610-1
Quality Control ............................................................................................ 01660-1
Maintenance of Plant Operations................................................................. 01700-1
Cleaning ....................................................................................................... 01710-1
Project Record Documents .......................................................................... 01720-1
Project Closeout ........................................................................................... 01760-1
MWBE Requirements .................................................................................. 01770-1
DIVISION 2
SITE WORK
02082
02210
02225
02260
02316
02317
02371
Manholes...................................................................................................... 02082-1
Subsurface Exploration ................................................................................ 02210-1
Removal and Abandonment of Existing Facilities ...................................... 02225-1
Excavation Support and Protection.............................................................. 02260-1
Excavation.................................................................................................... 02316-1
Backfilling.................................................................................................... 02317-1
Dust Soil Erosion and Sedimentation Control ............................................. 02371-1
363
02446
02536
02700
02720
02721
02934
Horizontal Directional Drilling.................................................................... 02446-1
Wastewater Force Mains.............................................................................. 02536-1
Asphaltic Concrete Paving........................................................................... 02700-1
Portland Cement Concrete Paving ............................................................... 02720-1
Recycled Concrete Aggregate Base Course ................................................ 02721-1
Grassing Solid Sodding................................................................................ 02934-1
DIVISION 3
CONCRETE
03300
03600
Cast-in-place Concrete................................................................................. 03300-1
Grouts........................................................................................................... 03600-1
The pages of this document are numbered consecutively. Prospective bidders must examine the
documents carefully and, before bidding, must advise the Commissioner, in writing, if any pages
are missing and must request that such missing pages be furnished to them.
364
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
1.01 SCOPE OF WORK
A. The Work to be done under this Contract and in accordance with these Specifications consists
of the furnishing of equipment, superintendence, labor, skill, material and all other items
necessary for the demolition, modification and construction associated with the Central Homes
Pump Station Force Main Replacement – Contract No. S3P312-13G as shown on the Contract
Drawings and specified herein. This is a single prime contract; all references to multiple
contractors, the General Construction Contractor, the HVAC Contractor, the Electrical
Contractor, Prime Contractors and alphanumeric designations for these Contractors shall be
deemed to refer to the sole contractor for Contract No. S3P312-13G.
B. The existing pump station will be maintained in continuous operation by the County during the
entire construction period of the contract. Work under the Contract shall be so scheduled and
conducted by the Contractor that such Work will not impede any treatment process, reduce the
quality of the pump station effluent or cause odor or other nuisance. In performing the Work
shown and specified, the Contractor shall plan and schedule his Work to meet the pump station
operating requirements.
C. The construction sequence, as described in Section 01700, Maintenance of Plant Operations,
must be followed so that the County is able to maintain continuous operation of the existing
pump station.
D. Before bidding, the Contractor shall visit the site of the work. The Contractor shall obtain all
necessary information and make their own determinations of any and all conditions which may
affect in any way the performance of their work and their bid prices under the Contract. All
pertinent data and dimensions with regard to existing construction shall be verified by the
Contractor.
E. The contractor shall provide parking for work force off site at the contractor's expense. No on-
site parking will be allowed. No staging of vehicles on-site will be allowed
F. Delays due to lack of available labor, supervision, equipment, etc. will not be acceptable.
G. Additional details concerning storm water permit compliance and pollution prevention plans
can be found in the Federal Regulations 40 CFR 122 & 123.
1.02 WORK COVERED BY CONTRACT DOCUMENTS
A. The foregoing is a general outline of work only and shall not be construed as complete
description of the Work to be performed under the Contract.
1. Force Main Replacement
a. Installation of 8” HDPE force main
NCDPW Central Homes PS Force Main Replacement 01010-1
070810 – October 2023
365
Summary of Work
©Gannett Fleming 2023
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Large-Scale Renewables "Build-Ready" Site Nomination (RFI-4464) Due Date: 12/30/2025 NYSERDA RFI-4464 advances large-scale

State Government of New York

Bid Due: 12/30/2025

Charge Ready NY 2.0 Equipment and Network Qualification Process (RFQL 5312) Due Date:

State Government of New York

Bid Due: 12/31/2025

Follow Repair/Replace Overhead Cranes on Fort Drum Active Contract Opportunity Notice ID W911S224UOHCR

Federal Agency

Bid Due: 11/13/2028

Issue Date: 11/21/2023 Contract Number: PON 4701 Low Carbon Pathways for Multifamily Buildings

The New York State Contract Reporter

Bid Due: 12/31/2025

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.