2023-052 IFB Kitsap County House Demolition

Agency: Kitsap County
State: Washington
Type of Government: State & Local
Category:
  • P - Salvage Services
  • Y - Construction of Structures and Facilities
Posted: Nov 15, 2023
Due: Dec 15, 2023
Solicitation No: 2023-052
Publication URL: To access bid details, please log in.

2023-052 IFB Kitsap County House Demolition Closes 12/15/2023 @2:00 PM (Changed)

2023-052 IFB Kitsap County House Demolition


2023-052 Legal Ad


2023-052 Plan Holders List


2023-052 Abatement Reports


2023-052 Addendum 1

Attachment Preview

INFORMAL BID
2023-052
Kitsap County Facilities Maintenance
Demolition of Houses and Removal of Materials located at 612 Sidney Ave, 802
Sidney Ave, 808 Sidney Ave, 810 Sidney Ave, 816 Sidney Ave, 803 Cline Ave, 807
Cline Ave, and 704 Sidney Ave.
Mandatory Site Visit: Tuesday November 7, 2023 @ 10:00 AM
Please Note: Parking is located on the gravel lot on Taylor Street. Please meet at the
Facilities Maintenance office for walk-through:
Kitsap County Facilities Maintenance
717 Taylor Street
Port Orchard, WA 98366
Response Deadline: Wednesday November 22, 2023 @ 2:00 PM
PROJECT DESCRIPTION
Kitsap County Facilities Maintenance (the County) is seeking bids from qualified
contractors to demolish and dispose of all materials located at 612 Sidney Ave, 802
Sidney Ave, 808 Sidney Ave, 810 Sidney Ave, 816 Sidney Ave, 803 Cline Ave, and
807 Cline Ave.
SCOPE OF WORK
The Contractor shall provide all labor, equipment, and materials to demolish and dispose
of the existing house and all other structures/improvements located on-site. This work
shall also include removal of all foundations, concrete driveways/pathways, clean-outs,
fencing, utility valves and meters, mailboxes, trees and vegetation inside the properties
shall be removed to grade and disposed of, and walls inside the properties shall be
removed. The Contractor shall be responsible for hauling away all materials/debris
associated with the demolition, restoring the property to grade with dirt, and installing,
maintaining and removing erosion and water pollution control measures as required by
the permit(s). All utilities have been disconnected but meters shall be removed, and
water/sewer services shall be capped at the right of way line.
IFB 2023-052 :Demolition of Houses and Removal of Materials
1|Page
House details as follows:
(612 Sidney Ave)
612 Sidney Ave
Two-story single-family residence, and outbuilding, was originally built in 1900 and
is approximately 1,524 square feet, with approximately a 7,405 sq. ft. lot.
Foundation, concrete pathways/driveways, and retaining walls will need to be
removed and holes filled to grade.
Utility cables, valves, and meters
Trees and vegetation
Mailbox
Ground will need to be leveled and compacted to Facilities Maintenance
specifications.
IFB 2023-052 :Demolition of Houses and Removal of Materials
2|Page
(802 Sidney Ave)
802 Sidney Ave
House perished in a fire, nothing remains except possible foundation. This is
approximately a 5,663 sq. ft. lot.
Foundation and concrete pathways/driveways will need to be removed and holes
filled to grade.
Utility cables, valves, and meters
Trees and vegetation
Mailbox
Fencing
Ground will need to be leveled and compacted to Facilities Maintenance
specifications. This lot may have fill material that can be used for the South side of
816 Sidney Ave.
IFB 2023-052 :Demolition of Houses and Removal of Materials
3|Page
(808 Sidney Ave)
808 Sidney Ave
Single-story single-family residence, with basement, was originally built in 1935
and is approximately 800 square feet, with approximately a 5,663 sq. ft. lot.
Foundation and concrete pathways/driveways
Fencing
Utility cables, valves, and meters
Trees and vegetation
Landscape brick walls
Mailbox
Ground will need to be leveled and compacted to Facilities Maintenance
specifications. This lot may have fill material that can be used for the South side of
816 Sidney Ave.
IFB 2023-052 :Demolition of Houses and Removal of Materials
4|Page
(810 Sidney Ave)
810 Sidney Ave
Single-story single-family residence, with basement and two-story detached
garage (1,728 sq. ft.), was originally built in 1940 and is approximately 1,452
square feet, with approximately a 7,405 sq. ft. lot.
Foundation and concrete pathways/driveways will need to be removed and holes
filled to grade.
Fencing
Utility cables, valves, and meters
Trees and vegetation
Mailbox
Ground will need to be leveled and compacted to Facilities Maintenance
specifications.
IFB 2023-052 :Demolition of Houses and Removal of Materials
5|Page
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow General Services Administration (GSA) seeks to lease office space in Ellensburg, WA

Federal Agency

Bid Due: 5/10/2024

Follow Project 668-CSI-008, Expand and Renovate Building 27 for Additional MRI Active Contract

Federal Agency

Bid Due: 5/06/2024

2022-126 RFP Monthly Utility Bills Printing and Mailing Services Closes 06/16/ 2022 @2:00

Kitsap County

Bid Due: 6/16/2024

Specification Number Type Due Date Time Due - Pacific Title and Solicitation Documents

City of Tacoma

Bid Due: 5/07/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.