Agency: | County of San Joaquin |
---|---|
State: | California |
Type of Government: | State & Local |
Category: |
|
Posted: | Mar 27, 2024 |
Due: | Apr 25, 2024 |
Publication URL: | To access bid details, please log in. |
Number | Deadline |
Thornton Water Main Looping
The work is located in Thornton, CA.
The work, in general, consists of installing 3,292 linear feet of 8 inch diameter PVC pipe (AWWA C900), 108 linear feet of 16 inch diameter steel casing pipe, fire hydrants, and various appurtenances for the Thornton water distribution system. Base Estimate Range Between $858,879 and $1,002,025 |
04/25/2024 08:31 PM UTC |
With GovernmentContracts, you can:
...Number Deadline Thornton Water Main Looping The work is located in Thornton, CA. ...
County of San Joaquin
Bid Due: 5/02/2024
...RFP Number Title Starting Closing Status ENG24-08 RFP/RFSOQ - Recycled Water Main Downtown ...
City of Redwood
Bid Due: 5/22/2024
...Preparation & Grading, (4) 4" DIP Water Main, (5) 4" DIP Fittings, (6) ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/07/2024
.../ for updates. The objective of the project is to replace and rehabilitate ...
San Francisco Public Utilities Commission
Bid Due: 5/16/2024