Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
---|---|
State: | South Carolina |
Type of Government: | State & Local |
Category: |
|
Posted: | Dec 14, 2023 |
Due: | Jan 4, 2024 |
Solicitation No: | 532 |
Publication URL: | To access bid details, please log in. |
ReWa is accepting bids for the Mountain Creek Crossing project. The work to be performed under this contract includes the excavation and removal of compromised Timber pile sections, placement of formed reinforced concrete pile caps, and erection of steel pipe support Frames. The work is in response to the collapse of two existing pipe supports holding up a 30" CIP gravity sewer line. The work is Emergency in nature and should be performed in a timely manner.
With GovernmentContracts, you can:
...Ad Title: Aluminum Pipe 2024 Purchasing Agent/Entity: City of Myrtle Beach Ad Publish ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/22/2024
...Dutcher Email: bids@keckwood.com Telephone: 803-768-5200 Description: Upgrade to existing stormwater pipe... underneath Taylor ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/13/2024
...brass goods, repair clamps, service saddles, pipe, pipe fittings, hydrants, meter boxes and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/24/2024
...) of 8-inch ductile iron pipe (DIP) water main, ~3,000 linear feet (lf) ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/23/2024