Bond Northeast High Renovation

Agency: Guilford County Schools
State: North Carolina
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Posted: Apr 17, 2024
Due: Apr 29, 2024
Solicitation No: 6639
Publication URL: To access bid details, please log in.
QuoteID Description Bids Closed Scope of Work
6639
Bond Northeast High Renovation
Bond Northeast High Renovation
Bond Northeast High Renovation
04/29/2024

Attachment Preview

AeroRaq Engineering Inc
8511 Davis Lake Parkway, Suite C6-205 Charlotte NC 28269
Phone: (704) 469-8463
hakeembailey@aeroraq.com
www.aeroraq.com
ADDENDUM 1:
Project: Guilford County Schools; Northeast High School Bond Renovation
Address: 6700 McLeansville Rd. McLeansville NC 27301
Date: 04/04/24
1. See attached Bid Bond form for use in bidding documents.
2. See attached structural letter with reinforcing instructions.
3. Where plans specify ceiling grid to be lowered. The existing grid shall be demolished,
and the new grid shall be erected in it’s place. Plan on replacing 64,500 sqft of ceiling
tiles.
4. On Sheet M1.4: Area 2 Mechanical Plan. VUV shall be plenum supply. Note: 8
5. On Sheet M0.2; Schedule for the single package unit ventilators: VUV-3, VUV-4, VUV-5
omit accessories number 2. VUV-1 & VUV-2 omit accessories number 4. Add accessories
number 4 to VUV-3, VUV-4, VUV-5 schedule.
6. Vertical Unit Ventilators shall conform to the below specification:
a. Submittals
i. Submittals for Single Packaged Vertical Indoor Mount heat pump or air
conditioner shall include equipment performance, dimensions and electrical
requirements. Two stage equipment shall include the following performance
data: CFM, EER, COP, IPLV, Total, Sensible, Latent capacities at standard AHRI
conditions and for all stages of operation.
ii. Factory tested sound data per ANSI S12.60. Dba levels at all operating
conditions and ERV speeds including exterior sound level.
iii. Complete exterior Louver performance information. Louver shall be provided by
SPVU Manufacturer.
iv. Factory Warranty documentation verifying 5-year compressor and 5-year parts
warranty.
v. Control submittal if controller is provided by equipment manufacturer.
b. Quality Assurance
i. Design, construction, testing and installation shall comply with the following
standards as applicable:
1. UL or ETL classified in accordance ANSI/UL 1995/CSA 22.2 No. 236-05
fourth edition.
AeroRaq Engineering Services
Page 1
AeroRaq Engineering Inc
8511 Davis Lake Parkway, Suite C6-205 Charlotte NC 28269
Phone: (704) 469-8463
hakeembailey@aeroraq.com
www.aeroraq.com
2. Certificate of performance by AHRI or another independent third-party
testing agency. AHRI or third-party testing will be in accordance with the
Air Conditioning Heating and Refrigeration Institute (AHRI) Standard
390-2003 for Single Package Vertical Units (SPVU). Self-test data
provided “In accordance with AHRI 390-2003” will not be accepted or
considered as alternate. Consideration for exceptions will require
testing by a third-party agency preapproved by the specifier and
accompanying statement of indemnification from the Manufacturer.
ii. Unit shall be manufactured by an ISO 9001:2015 Certified Manufacturer.
c. Operating Characteristics
i. Unit shall be capable of simultaneous heating duty and defrost cycle operation
when using accessory electric strip heat. Unit electric nameplate shall display
required electric circuit. Factory installed adjustable control, allowing for
optional low amp draw operation preventing simultaneous operation of
compressor and strip heat, shall not be allowed. Only dedicated low ampacity
units manufactured and shipped with correct electric nameplate data shall be
accepted.
ii. Indoor supply airflow shall automatically adjust to maintain constant cfm at
rated airflow independent of external static pressure up to .5” WC.
d. Warranty
i. Unit shall include a full 5-year parts and labor warranty covering compressor,
sealed refrigeration system, heat exchange coils and ventilation packages as
defined by the terms and conditions of Bard Limited Warranty agreement. Labor
is excluded in the Bard standard warranty. Any non-equivalent 5-year
compressor or 1 year parts warranty shall not be accepted. All parts warranty
documentation shall be included in submittal data. Any exceptions to the
Manufacturers standard warranty must be acknowledged in writing by the
Manufacturers Senior Manager.
e. Training, Technical Support and Owner Training
i. Factory Startup Service provided by unit manufacturer to include individual unit
Startup Reports and Owner Training.
7. Panel “M” on Panel schedule on sheet E0.1 is mislabeled and should be marked as Panel
“BP”.
8. Disconnects that are integral to equipment (RTU’s, VFD’s, etc..) are to be circuit
breakers. Stand alone circuit breakers are to be fused.
AeroRaq Engineering Services
Page 2
AeroRaq Engineering Inc
8511 Davis Lake Parkway, Suite C6-205 Charlotte NC 28269
Phone: (704) 469-8463
hakeembailey@aeroraq.com
www.aeroraq.com
9. The bids must be sealed and delivered in person to 501 West Washington St.
Greensboro, NC 27401 on April 10th, 2024 before 1:30 pm. It will be opened and read
out loud.
10. The contract time will be extended to 07/31/2025 as the completion date.
Regards,
Hakeem R. Bailey, P.E.
Principal Project Manager,
8511 Davis Lake Parkway, Suite C6-205 Charlotte NC 28269
Office: (704) 469 8463
hakeembailey@aeroraq.com
AeroRaq Engineering Services
Page 3
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Pisgah RD Road Maintenance Project Active Contract Opportunity Notice ID 12445224B0005 Related

AGRICULTURE, DEPARTMENT OF

Bid Due: 5/17/2024

Format for Printing Bid Title: RFB 24-0379 SOUTH PROPERTY PARTIAL CLOSURE PHASE 2

New Hanover County

Bid Due: 5/03/2024

Solicitation Number Project Title Description Opening Date Posted Date Status Department 338-READVERTISEMENT -

State Government of North Carolina

Bid Due: 5/03/2024

Solicitation Number Project Title Description Opening Date Posted Date Status Department 287-21-24364-01PQB East

State Government of North Carolina

Bid Due: 5/09/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.