Agency: | State of Colorado - Department of Transportation |
---|---|
State: | Colorado |
Type of Contract: | Awards |
Type of Government: | State & Local |
Category: |
|
Posted: | Aug 29, 2023 |
Publication URL: | To access bid details, please log in. |
Letting Dates | Project Name and Description | Low Bidder/Award Winner | Bid Tabulation |
STM 0252-484 (22827)- This project is located in Region 2 in El Paso County. Project work consists of operational improvements along I-25 from Fillmore to Garden of the Gods. Work will include constructing continuous auxiliary lanes in both directions of I-25 between exits 145 and 146, reconstructing and widening the Ellston Street overpass structures, joint repair on the GOTG overpass structures, roadway resurfacing, curve cross slope corrections, drainage and water quality upgrades, ITS infrastructure replacements, and ramp metering modifications. |
SEMA Construction, Inc. | Pending |
With GovernmentContracts, you can:
...Bid Number: RFP-SN-2024-17 Bid Title: Yampa River Restoration Construction - Phase I Construction... ...
Steamboat Springs
Bid Due: 5/24/2024
...construction must be supervised by a qualified contractor with experience with wetland restoration... ...
Boulder County
Bid Due: 5/31/2024
...Prescott Wetland Construction Restoration Project Details Due Date: 05/22/2024 2:00 pm Bidding... to ...
Boulder County
Bid Due: 5/22/2024
...construction must be supervised by a qualified contractor with experience with wetland restoration... ...
Boulder County
Bid Due: 5/22/2024