Agency: | City of Davenport |
---|---|
State: | Iowa |
Type of Contract: | Awards |
Type of Government: | State & Local |
Category: |
|
Posted: | Apr 27, 2023 |
Solicitation No: | 23-74 Addendum 2 |
Publication URL: | To access bid details, please log in. |
Bid Information
Type | Invitation to Bid |
Status | Awarded |
Number | 23-74 Addendum 2 (3rd and Brady Streetscaping (Re-issue)) |
Issue Date & Time | 2/17/2023 03:13:15 PM (CT) |
Close Date & Time | 3/8/2023 11:00:00 AM (CT) |
Duration | 18 days 19 hours 46 minutes 44 seconds |
Notes |
This project was previously bid in November 2022 but pricing was inconsistent and outside of budget. Therefore, changes to the original plan set have been made as follows: deleting a new storm sewer manhole, deleting flowable fill from the project, breaking out line items related to vault repair, deleting bike rack and planter items, and general clarifications and simplifications related to feedback received and the new 2023 Davenport Supplemental Specifications to SUDAS. The configurations of lights was also adjusted, and tree pits were removed from areas over basement vaults.
The project is streetscaping of the northwest corner of 3 rd and Brady Streets, including new curb, ADA-compliant PCC & brick sidewalk, and new ornamental lights. A portion of the project has a basement beneath the existing sidewalk, and the ceiling is in poor condition and requires replacement as part of this project. Therefore, the project also includes items related to removal and construction of a structural slab ceiling. The project is located on the north side of E. 3 rd St. from 116 W. 3 rd St. east to Brady St. AND the west side of Brady St. from E. 3 rd St. north to the alley. Work shall start at the Contractor’s convenience after the St. Patrick’s Day Parade and be completed by July 14, 2023. This has been changed to a Completion Date contract.
A Pre-Bid Meeting will be held
at 10:30am February 22, 2023 at the project location -- Northwest Corner of 3rd and Brady Streets.
This will be the time to discuss the plans and specifications, any concerns, and the city expectations.
All contractors intending to bid on this project are encouraged to have representative in attendance.
|
Name | Matthew Cullinan |
Address |
226 WEST FOURTH STREET
DAVENPORT, IA 52801 USA |
Phone | (563) 888-2077 |
Fax | |
matthew.cullinan@davenportiowa.com |
File Name | Description | File Size |
Bid Tab.pdf | Bid Tabulation. This is for informational purposes only. This is not a guarantee of an award. All vendors will be notified when an award decision has been made. | 208 KB |
Document name | Format |
Bid Invitation (please login to view this document) | Acrobat / PDF |
File Name | Description | File Size | ||||
|
||||||
ADV.FOR.BIDS_-_3rd and Brady Streetscaping (Re-issue).pdf | Advertisement for bid | 251 KB | ||||
Plans.pdf | Plans | 5.42 MB | ||||
Special Provisions.pdf | Special Provisions | 443 KB | ||||
SUDAS_Top_5_List_2023.pdf | SUDAS_Top_5_List_2023 | 228 KB | ||||
Instruction to Bidders.pdf | Instruction to Bidders | 79 KB | ||||
General_Contract_Conditions_12.14.20.pdf | General Contract Conditions. 12.14.20 | 262 KB | ||||
Communication Disclosure_2021.pdf | Communication Disclosure | 79 KB | ||||
Statement_of_Intent_and_Non-Collusion (Blank Form).pdf | Statement of Intent and Non-Collusion | 34 KB | ||||
Bond Requirements_2021.pdf | City of Davenport Bond Requirements | 49 KB | ||||
Special Condition Equal Opp Clause.pdf | 8 KB | |||||
Affirmative Action Form.pdf | Affirmative Action Program | 37 KB | ||||
Bidder Status Form - To be completed by all bidders..pdf | Bidders Status Form must be filled out and attached under the "Response Attachments" tab. | 155 KB | ||||
Waiver and Hold Harmless with Attachment 10.2019.pdf | Waiver and Hold Harmless with Attachments | 168 KB | ||||
DBE Subcontract contact forms 10.30.2020.doc | DBE Sub-Contract Contact Forms | 59 KB | ||||
GENERAL CONDITIONS Contractor - Medium Hazard (2).pdf | Insurance Indemnification - Medium Hazard | 246 KB |
|
||||||
|
||||||
Activity Date | Activity Name | Description | |
2/22/2023 10:30:00 AM (CT) | Pre-Bid Meeting | A Pre-Bid Meeting will be held at 10:30am February 22, 2023 at the project location -- Northwest Corner of 3rd and Brady Streets. This will be the time to discuss the plans and specifications, any concerns, and the city expectations. All contractors intending to bid on this project are encouraged to have representative in attendance. | |
2/24/2023 10:00:00 AM (CT) | Questions Due | Questions are due to the Purchasing Division no later than the time indicated. Submit inquiries via the Questions tab of the bid. | |
2/28/2023 02:00:00 PM (CT) | Answers Posted | Answers to inquiries submitted to the Purchasing Division will be issued no later than the date indicated. |
Supplier Name | City | State | Contact Name | Phone | |||||
|
|||||||||
Americore LLC | Blue grass | IA | Corey Smith | Americorellc@gmail.com | (641) 455-1714 | ||||
Anderson Commercial Concrete | Davenport | IA | John Lower | johnl@accinc.biz | (563) 391-3281 | ||||
Bi-State Barricade Rental and Sales | Coal Valley | IL | Tamara A Houseman | tamara_houseman@sbcglobal.net | (309) 792-1980 | ||||
Brandt Construction Co | Milan | IL | Terence L. Brandt | tbrandt@brandtconstructionco.com | (309) 787-4644 | ||||
Centennial Contractors of the Quad Cities | Moline | IL | Jayme Massa | jayme@cciqc.com | (309) 736-1212 | ||||
Construction Update Plan Room | Des Moines | IA | Cindy Adams | CAdams@mbi.build | (515) 288-7339 | ||||
Davenport Electric Contract Company | Davenport | IA | Barry Van Blaricom | barry@davenportelectric.com | (563) 326-6475 | ||||
Emery Construction Group Inc. | Moline | IL | Blake Lanum | blake@emeryconstgroup.com | (309) 797-2070 | ||||
Freedom Barricade Services LLC | Geneseo | IL | Marisol Carley | freedombarricade@gmail.com | (309) 550-9041 | ||||
Goetz Concrete Construction Corp | Milan | IL | BJ Sorensen | bj@goetzconcrete.com | (309) 787-6242 | ||||
Hardscape Solutions | Cedar Rapids | IA | (319) 377-5064 | ||||||
Hawkeye Paving Corporation | Davenport | IA | Tony Perkins | TPerkins@hawkeyepaving.com | (563) 355-6834 | ||||
Insituform Technologies USA, LLC | Chesterfield | MO | Jana Lause | jlause@aegion.com | (636) 530-8000 | ||||
KE Flatwork Inc. | eldridge | IA | Lucas | keflatwork@gmail.com | (563) 357-9028 | ||||
Lawns Unlimited of Iowa Inc. | Bettendorf | IA | Cyndi Diercks | (563) 332-9057 | |||||
Legacy Corporation | East Moline | IL | Tristan J Peterson | tpeterson@legacycorp.net | (563) 484-6863 | ||||
Lohman Earth Works | Davenport | IA | Pierce Lohman | pierce@lohmanearthworks.com | (309) 235-4083 | ||||
Manatt's, Inc. | Davenport | IA | Adam Smith | adams@manatts.com | (563) 359-3401 | ||||
Medic Striping | Davenport | IA | (563) 449-2553 | ||||||
Rittmer Inc. | DeWitt | IA | Jeff Rittmer | jrittmer@rittmerinc.com | (563) 659-3386 |
With GovernmentContracts, you can:
...with detention basin/interior drainage installations and a combined storm water and Effluent Pump... ...
City of Davenport
Bid Due: 6/06/2024
...March 23, 2019 for Iowa Severe Storms and Flooding (March 12, 2019 and ...
Iowa Grants
Bid Due: 12/31/2030
...for Ellis Park and the City's maintenance building, water main, sanitary sewer and ...
City of Cedar Rapids
Bid Due: 5/22/2024
...for Iowa Severe Storms and Flooding (March 12, 2019 and continuing). Funding is ...
Iowa Grants
Bid Due: 12/31/2030