C 5502-098 (22086) ~ This project is in La Plata county on US 550… CO

C 5502-098 (22086) ~ This project is in La Plata county on US 550 MP 21.5-24.0 US 160 MP 82.5-83.4. Consists of installation of curb ramps at 19 locations within the city limits of Durango. A MANDATORY PRE-BID CONFERENCE HAS BEEN SCHEDULED FOR WEDNESDAY, NOVEMBER 7, 2018 AT 9:00 AM AT THE REGION 5 OFFICE IN DURANGO LOCATED AT 3803 NORTH MAIN AVE. Bids will be accepted only from certified ESB pre-qualified…

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

ER 052A-039 (20262) ~ This project is located in Boulder county. SH 170 MP… CO

ER 052A-039 (20262) ~ This project is located in Boulder county. SH 170 MP 1.2 CBC Eldorado Canyon. 15Nov011.EBSx 15Nov011.001x Revision 1 Q&A

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

CR 500-198 (22120R) ~ Region 5 guardrail replacement in La Plata, Montezuma, and Saguache… CO

CR 500-198 (22120R) ~ Region 5 guardrail replacement in La Plata, Montezuma, and Saguache counties. 15Nov010.EBSx 15Nov010.001x Revision 1

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

ER R400-329 (20285) ~ This project located in Larimer county on US 287 &… CO

ER R400-329 (20285) ~ This project located in Larimer county on US 287 & SH 14 north of Fort Collins. The work consists of placing rip rap along the highway embankment at various locations, temporary river channel diversion and reconstruction and cross culvert installations. 15Nov009.EBSx

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

C 060A-023 (21876) ~ This project in Weld county entails the widening at SH60… CO

C 060A-023 (21876) ~ This project in Weld county entails the widening at SH60 and WCR40 to improve the safety of the corridor. Southbound SH60 will add a deceleration right turn lane and bubble left turn lane. Northbound SH60 will add a left turn lane. The existing CBC minor structure in Farmer's Independent Ditch will be extended on the existing channel alignment. The project will be completed with…

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

NHPP 0402-090 (20753) ~ The project located in Moffat and Routt counties. The project… CO

NHPP 0402-090 (20753) ~ The project located in Moffat and Routt counties. The project consists of Bridge preventative maintenance project for five structures. B-06-A on US40Z MP 0.02, B-06-S on US40A MP 91.22 in, B-06-V on SH394 MP 1.0, C-06-A on US40A MP 105.50in Routt county, C-08-A on US40A MP 108.38 in Routt county. 15Nov007.EBSx Q&A

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

ITS 0242-088 (22503) ~ On US-24 from I-25 to Morning Sun Drive (Woodland Park),… CO

ITS 0242-088 (22503) ~ On US-24 from I-25 to Morning Sun Drive (Woodland Park), work consists of installation of fiber optic cable and conduit, which includes pull boxes, manholes, Ethernet switches, backbone fiber, lateral fiber, splicing fiber, terminating fiber, existing device integration, and testing ofthe fiber and network in El Paso and Teller Counties. A Mandatory Pre-Bid conference will be…

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

STA 086A-051 (18611) ~ Located in Elbert county on State Highway 86 beginning at… CO

STA 086A-051 (18611) ~ Located in Elbert county on State Highway 86 beginning at M.P. 33.1 and extending approximately 26.1 miles easterly ending at M.P. 59.2 with a no work section beginning at M.P. 38.1 and ending to M.P. 50.5. Consisting of roadway resurfacing, which includes: H.M.A. Overlay, Bridge repair, and striping. 15Nov004.EBSx 15Nov004.001x 15Nov004.002x Revision 1 Revision 2 Q&A

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

NHPP 0252-455 (21364S) ~ The Smart 25 Project limits are along NB I-25 from… CO

NHPP 0252-455 (21364S) ~ The Smart 25 Project limits are along NB I-25 from Ridgegate to University. There is additional ITS work along 225 between Parker Roadand I-25. The purpose of the project is to install devices and equipment required to operate a coordinated ramp metering demonstration project along NB I-25. This project will install a new CDOT Fiber backbone in new conduit along portions of…

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

NHPP 4912-007 (20684) ~ This project consists of minor widening at junction with Montezuma… CO

NHPP 4912-007 (20684) ~ This project consists of minor widening at junction with Montezuma county road S located on US 491 north of Cortez in Montezuma county from MP 33.48 to MP 34.01. The project consists of HMA leveling course and SMA overlay located on US 491 from MP 36.15 to MP 53.74 and SMA overlay located on SH 184 from MP 0.00 to MP 3.78. It also consists of installation of an advanced warning…

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

NHPP 0705-082 (21878) ~ This project is located on I-70 in Kit Carson and… CO

NHPP 0705-082 (21878) ~ This project is located on I-70 in Kit Carson and Lincoln county beginning at MP 380.0 extending 15.1 miles. The project consists of concrete overlay with concrete paving, removal of hot mix asphalt and full depth reclamation and stripping. 15Nov001.Ebsx Q&A

State Government of Colorado | Colorado

State & Local

Due: 11/15/2018

Posted: 11/09/2018

Save

IM 0253-268 (22703) ~ This project is located in Adams and Broomfield counties I-25:… CO

* IM 0253-268 (22703) ~ This project is located in Adams and Broomfield counties I-25: 120 th (SH 128) to SH 66. Completion of the SB and NB tolled express lane from 120 th to E470. Consisting of mainline overlay, new mash complain median barrier and lighting, and ITS and tolling. A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON THURSDAY, NOVEMBER 15TH, 2018 STARTING AT 8:00 AM AT 4670 NORTH HOLLY STREET,…

State Government of Colorado | Colorado

State & Local

Due: 11/29/2018

Posted: 11/09/2018

Save

RFQ 11156 - As-Built Drawing Services CO

RFQ 11156 - As-Built Drawing Services Category Services Type Request for Qualifications Solicitation Number 11156 Title As-Built Drawing Services Summary ? The Lower Colorado River Authority (LCRA) is soliciting responses from qualified eligible suppliers to perform as-built drawing services for transmission lines and substations. Update Notice ?Addendum 1 and 2: Updates for clarification. Meeting…

State Government of Colorado | Colorado

State & Local

Due: 11/20/2018

Posted: 11/08/2018

Save

RFQ 11278 - RiverWare Modeling Services CO

RFQ 11278 - RiverWare Modeling Services Category Services Type Request for Qualifications Solicitation Number 11278 Title RiverWare Modeling Services Summary ?? The Lower Colorado River Authority (LCRA) is soliciting responses from qualified eligible suppliers to provide RiverWare Software Modeling Services .? Update Notice ?Addendum 1 added. Updated Qualifications Package Requirements document for…

State Government of Colorado | Colorado

State & Local

Due: 11/21/2018

Posted: 11/08/2018

Save

ER 0252-467 (22312) ~ The South Douglas Creek box culvert (Structure Number 025A145120BL, MP… CO

* ER 0252-467 (22312) ~ The South Douglas Creek box culvert (Structure Number 025A145120BL, MP 145.12) is a 400 feet long, 14 feet wide, 12 feet high concrete box culvert (CBC) conveying flows under all lanes of I-25. The structure was constructed in 1959. This site is needing repairs as a result of flood damage from 2013. The project is located in El Paso county. 29Nov003.EBSx

State Government of Colorado | Colorado

State & Local

Due: 11/29/2018

Posted: 11/07/2018

Save

STU 1211-085 (20322) ~ This project is located on SH 121 (S. Wadsworth Blvd)… CO

* STU 1211-085 (20322) ~ This project is located on SH 121 (S. Wadsworth Blvd) beginning at Bear Creek MP 8.5 and extending north approximately 3.7 miles to W. 4 th Ave. MP 12.28. The project consists of 2.5 inch H.M.A. Resurfacing, curb ramp upgrades, adjusting manhole and valve boxes, cleaning inlets, constructing a pipe edge drain, and placing final signing and stripping. This project is in Denver…

State Government of Colorado | Colorado

State & Local

Due: 11/29/2018

Posted: 11/07/2018

Save

STR 1591-001 (21559) ~ This project is located in Costilla county. SH 159 San… CO

* STR 1591-001 (21559) ~ This project is located in Costilla county. SH 159 San Luis to Fort Garland surface treatment. Work consists of HMA leveling course, HMA overlay, shouldering, signing and pavement markings. 13Dec001.EBSx

State Government of Colorado | Colorado

State & Local

Due: 12/13/2018

Posted: 11/07/2018

Save

ER 119A-065 (20258) ~ This is a reconstruction, resurfacing and a Boulder Trail Project.… CO

* ER 119A-065 (20258 ) ~ This is a reconstruction, resurfacing and a Boulder Trail Project. This project is located in Boulder county. 06Dec003.EBSx

State Government of Colorado | Colorado

State & Local

Due: 12/06/2018

Posted: 11/07/2018

Save

STR 112A-001 (21317) ~ On SH 112, from US 285 to SH 17, work… CO

* STR 112A-001 (21317) ~ On SH 112, from US 285 to SH 17, work consists of HMA leveling course, followed by HMA overlay, shouldering, concrete ramp, sidewalk, signing and pavement markings in Rio Grande, Alamosa, and Saguache counties. 06Dec002.EBSx

State Government of Colorado | Colorado

State & Local

Due: 12/06/2018

Posted: 11/07/2018

Save

STA 050A-028 (20751) ~ This project is located in Pueblo, CO along US 50C… CO

* STA 050A-028 (20751) ~ This project is located in Pueblo, CO along US 50C from 4th St. to Baxter Rd. The project consists of HMA Mill and Fill, Installing new ADA ramps and upgrading existing ADA ramps, new RCP Storm Sewer in the areas of Aspen St. - Carson St., 20th Lane - south of US 50C, anda short run of new storm sewer in an existing parking lot east of 20th Lane. Bridge work includes joint…

State Government of Colorado | Colorado

State & Local

Due: 12/06/2018

Posted: 11/07/2018