Government Contract Archives
Access contract archives from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.
Athens Tech Drive Sewer Extension (PE-66412-NONST-2025-000000006)
Georgia | State & Local Save
Due: 11/01/2024
Posted: 10/02/2024
011-24 North Broad Extension Road Improvements (PE-65750-NONST-2024-000000013)
Georgia | State & Local Save
Due: 11/07/2024
Posted: 10/01/2024
Dixie Highway Water Main Extension (PE-66078-NONST-2024-000000001)
Georgia | State & Local Save
Due: 10/22/2024
Posted: 9/26/2024
24-0156-2 Lake Mayer Park Court Improvements (PE-77548-NONST-2025-000000164)
Georgia | State & Local Save
Due: 10/29/2024
Posted: 9/26/2024
24-0157-2 Rio Vista Neighborhood Park Court Improvements (PE-77548-NONST-2025-000000165)
Georgia | State & Local Save
Due: 10/29/2024
Posted: 9/26/2024
Genesis Drive Water & Sewer Extension (PE-77523-NONST-2025-000000038)
Georgia | State & Local Save
Due: 10/29/2024
Posted: 9/26/2024
Pump Station H Rehabilitation Phase 2
California | State & Local Save
Due: 10/30/2024
Posted: 9/20/2024
Directional Bore Services (ITB-10340)
Florida | State & Local Save
Due: 10/18/2024
Posted: 9/18/2024
FCI Englewood- Water Service Improvement Project (15BFA024B00000027)
Colorado | Federal Save
Due: 11/06/2024
Posted: 9/17/2024
SMD_SERVICES_IDIQ CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING & ASBESTOS ABATEMENT, CITYWIDE WITH BOROUGH FOCUS
New York | State & Local Save
Due: 10/24/2024
Posted: 9/12/2024
SMD_SERVICES_IDIQ CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING & ASBESTOS ABATEMENT, CITYWIDE WITH BOROUGH FOCUS
New York | State & Local Save
Due: 10/24/2024
Posted: 9/12/2024
RFP-23-24-066 Mountain Run Road Boring Project (23-24-066)
Virginia | State & Local Save
Due: 3/04/2025
Posted: 2/16/2024
U1a Access
Nevada | Federal Save
Due: 11/07/2024
Posted: 10/17/2023
Roadwork-SUPPLY&INSTALL 1 SMOOTH WALL STEEL PIPE CULVERT by BORING HWY16 TOTAL LENGTH 36m CS:16-17 (HWY-H26056-APPN)
State & Local Save
Due: 6/09/2026
Posted: 5/26/2026
Roadwork-SUPPLY&INSTALL 1 SMOOTH WALL STEEL PIPE CULVERT by BORING HWY16 TOTAL LENGTH 36m CS:16-17 (HWY-H26056-APPN)
State & Local Save
Due: 7/09/2026
Posted: 5/25/2026
Roadwork-CONSTRUCTION SURFACING STRUCTURE HWY 13 TL Distance 25.72KM CS:13-02 13-08-40 13-08-41 (HWY-H26027)
State & Local Save
Due: 6/02/2026
Posted: 5/13/2026
Roadwork-SUPPLY&INSTALL 2 SMOOTH WALL STEEL PIPE CULVERTS BY BORING. TOTAL LENGTH 56m. CS: 16-15 (HWY-H26046-APPN)
State & Local Save
Due: 5/13/2026
Posted: 4/27/2026
Roadwork-SUPPLY&INSTALL CULVERT boring method & culvert sleeve 5 locations HWY 16 CSL 16-16 (HWY-H26030)
State & Local Save
Due: 5/06/2026
Posted: 4/20/2026
Roadwork-SUPPLY&INSTALL 8 STEEL PIPE CULVERTS BY BORING METHOD on HWY33 TOTAL LENGTH 183 m CS:33-03 (HWY-H25136)
State & Local Save
Due: 4/23/2026
Posted: 4/08/2026
Due: 3/24/2026
Posted: 3/18/2026