Government Contract Archives
Access contract archives from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.
On Call Water Treatment Services
Connecticut | State & Local Save
Due: 6/25/2025
Posted: 6/10/2025
Brookside Drive Wastewater Pump Station Improvements
Connecticut | State & Local Save
Due: 6/30/2025
Posted: 6/10/2025
SCADA TELEMETRY SYSTEM STUDY AND SURVEY
Connecticut | State & Local Save
Due: 6/25/2025
Posted: 6/08/2025
COLLECTION SYSTEM INFLOW / INFILTRATION (I&I) STUDY
Connecticut | State & Local Save
Due: 6/26/2025
Posted: 6/08/2025
Sludge System and Plant Water Improvements at WPC
Connecticut | State & Local Save
Due: 6/25/2025
Posted: 5/30/2025
J046--Cogen Cooling Tower Water Treatment (VA-25-00072804)
Connecticut | Federal Save
Due: 6/05/2025
Posted: 5/29/2025
Miscellaneous Emergency Construction Svcs for Water and Wastewater Operations
Connecticut | State & Local Save
Due: 6/03/2025
Posted: 5/21/2025
Miscellaneous Emergency Construction Svcs for Water & Waste Water Operations at Various Locations
Connecticut | State & Local Save
Due: 6/03/2025
Posted: 5/16/2025
Supply and Delivery of Wastewater Treatment Chemicals
Connecticut | State & Local Save
Due: 6/12/2025
Posted: 5/09/2025
Supply and Delivery of Wastewater Treatment Chemicals
Connecticut | State & Local Save
Due: 6/12/2025
Posted: 5/08/2025
Design Services - Replacement of Flocculation Equipment and Sedimentation Collection System
Connecticut | State & Local Save
Due: 5/28/2025
Posted: 5/07/2025
Design Services for Replacement of Flocculation Equipment
Connecticut | State & Local Save
Due: 5/28/2025
Posted: 5/07/2025
Lease, Development and Management, and Financial Feasibility of Town-Owned Property Located at 50 East Street, New Milford, CT Request for…
Connecticut | State & Local Save
Due: 6/12/2025
Posted: 5/04/2025
RFP #2154 - Furnishing Heating, Ventilation and Air Conditioning System Maintenance at the Town of Vernon Water Pollution Control…
Connecticut | State & Local Save
Due: 6/04/2025
Posted: 5/01/2025
Furnishing HVAC System Maintenance at the Water Pollution Control Facility
Connecticut | State & Local Save
Due: 6/04/2025
Posted: 5/01/2025
Replacement of Condensing Boilers at the Wastewater Treatment Plant
Connecticut | State & Local Save
Due: 6/04/2025
Posted: 4/29/2025
CHEMICALS FOR WATER AND WASTEWATER TREATMENT
Connecticut | State & Local Save
Due: 5/07/2025
Posted: 4/23/2025
STRAIGHTWAY WATER TREATMENT FACILITY, DWSRF 16849, BARNSTABLE, MA
Connecticut | State & Local Save
Due: 5/23/2025
Posted: 4/18/2025
Transportation and disposal of liquid sludge from Wastewater Treatment Plant
Connecticut | State & Local Save
Due: 5/14/2025
Posted: 4/17/2025
J044--Boiler Feedwater Chemical Treatment
Connecticut | Federal Save
Due: 4/18/2025
Posted: 4/08/2025