Government Contract Archives
Access contract archives from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.
LAKE FORK ERFO ROAD REPAIR UT
... replacement, gravel fill, drainage grading, rock riprap placement, general roadway repair, surface...
AGRICULTURE, DEPARTMENT OF | Utah
LAKE FORK ERFO ROAD REPAIR UT
... the roadway. The work will consist of culvert replacement, gravel fill, drainage grading, rock...
AGRICULTURE, DEPARTMENT OF | Utah
Sidewalk Replacement and Stormwater Drainage Installation - Salt Lake City ARTCC UT
... Follow Sidewalk Replacement and Stormwater Drainage Installation - Salt Lake City ARTCC Active... and install stormwater drainage at the Salt Lake City Air Route Traffic Control Center in Salt Lake...
Federal Agency | Utah
Sidewalk Replacement and Stormwater Drainage Installation - Salt Lake City ARTCC UT
... Follow Sidewalk Replacement and Stormwater Drainage Installation - Salt Lake City ARTCC Active... Construction Branch (AAQ-540) has a need to replace sidewalks and install stormwater drainage at the Salt...
Federal Agency | Utah
Sources Sought Notice/PLA - F-35 East Campus Infrastructure UT
...-ways), associated drainage, and airfield lighting systems. Work will also include construction...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
..., and drainage improvements. Segment 2 (Schedule A) - Segment 2 goes from 147+00 at the intersection of Pack... leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet..., asphalt concrete pavement, and drainage…...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
...concrete pavement, and drainage improvements. Segment 2 (Schedule A) - Segment 2 goes from 147+00... aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway..., placing aggregate base, asphalt concrete pavement, and drainage…...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
..., and drainage improvements. Segment 2 (Schedule A) - Segment 2 goes from 147+00 at the intersection of Pack... leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet..., asphalt concrete pavement, and drainage…...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
..., and drainage improvements. Segment 2 (Schedule A) - Segment 2 goes from 147+00 at the intersection of Pack... leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet..., asphalt concrete pavement, and drainage…...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
..., and drainage improvements. Segment 2 (Schedule A) - Segment 2 goes from 147+00 at the intersection of Pack... leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet..., asphalt concrete pavement, and drainage…...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
...of the road, placing aggregate base and asphalt concrete pavement, and drainage improvements... pavement, and drainage improvements to narrow the roadway width to 26 feet. Five locations..., and drainage improvements to widen the roadway width to 26 feet.…...
Federal Agency | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
...aggregate base and asphalt concrete pavement, and drainage improvements. Segment 2 (Schedule A) - Segment 2... the existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage... or lowering profile, placing aggregate base, asphalt concrete pavement, and drainage…...
Federal Agency | Utah
Kents Lake Campground Reconstruction Project UT
.../install new drainage features such as culverts and/or ditches Construct new gravel and/or concrete...
Federal Agency | Utah
Kents Lake Campground Reconstruction Project UT
.../install new drainage features such as culverts and/or ditches Construct new gravel and/or concrete...
Federal Agency | Utah
Kane Creek Boulevard Reconstruction UT
... flatwork, drainage, street lighting, trenching/boring conduit, waterline, sewer line, storm drain line...
City of Moab | Utah
UT FLAP 73(2) La Sal Mountain Loop Road UT
...for the remainder of the road, placing aggregate base and asphalt concrete pavement, and drainage..., asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet. Five... concrete pavement, and drainage improvements to widen…...
Federal Agency | Utah
Moab Dispersed Parking Project - Downtown UT
..., sidewalk, drainage, micro-surface, street lighting, and landscape improvements. The ENGINEER...
City of Moab | Utah
Moab Dispersed Parking Project - Downtown UT
..., sidewalk, drainage, micro-surface, street lighting, and landscape improvements. The ENGINEER...
City of Moab | Utah
Z2DA--660-21-123 Repaving Parking lots, Roads UT
... ensuring that proper slope and grade are used to achieve proper drainage and restriping of any areas...
VETERANS AFFAIRS, DEPARTMENT OF | Utah
UT FTBL 7133(1) Canyon Rims Road UT
...network is to reduce annual maintenance costs and issues, re-establish proper drainage, and improve... of roadway embankment slope flattening, ditch and shoulder reconditioning, minor drainage improvements... the Needles Overlook Road. The work includes building embankment, minor drainage…...
TRANSPORTATION, DEPARTMENT OF | Utah