Government Contract Archives
Access contract archives from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.
Belvoir Ranch Phase 2, Design-Build Trail WY
... Belvoir Ranch Phase 2, Design-Build Trail OPEN 2 3/28/2024 4/29/2024 ...
City of Cheyenne | Wyoming
Belvoir Ranch Phase 2, Design-Build Trail WY
... Belvoir Ranch Phase 2, Design-Build Trail OPEN 1 3/28/2024 4/29/2024 ...
City of Cheyenne | Wyoming
Y1DA--(CON) 442-303 Expand Emergency Department, Cheyenne, WY (VA-25-00000818) WY
... will be a competitive, firm-fixed-price contract utilizing the design-bid-build approach (Final Specifications...
VETERANS AFFAIRS, DEPARTMENT OF | Wyoming
Belvoir Ranch Phase 2, Design-Build Trail WY
... Belvoir Ranch Phase 2, Design-Build Trail OPEN 0 3/28/2024 4/29/2024 ...
City of Cheyenne | Wyoming
GBSD Integrated Command Center - FE Warren AFB WY
... SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build (construction... be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials...
Federal Agency | Wyoming
GBSD Integrated Command Center - FE Warren AFB WY
... PARTICIPATION. The construction acquisition method is design-bid-build (construction). Project... with applicable DoD, Air Force, and base design standards. In addition, local materials and construction...
Federal Agency | Wyoming
C1DA--AE Water Treatment Improvements (666-18-106) (VA-23-00097362) WY
...shall be an Architectural & Engineering (AE) firm. This will be a firm fixed price DESIGN-BID...-BUILD with included construction management services provided by the AE for the stated Project. The... characteristics which will affect the design such…...
Federal Agency | Wyoming
Z2DA--442-24-014 - DB Renovate 3rd Floor Cowboy and Other Areas (VA-24-00007236) WY
...- DB Renovate 3rd Floor Cowboy and Other Areas The Department of Veteran s Affairs has a design build... materials, lead based paint, rectify code deficiencies including seismic requirements, gaps in design... as required by program design…...
Federal Agency | Wyoming
Z2DA--442-24-014 - DB Renovate 3rd Floor Cowboy and Other Areas (VA-24-00007236) WY
...: Cheyenne VAMC 2360 E. Pershing Blvd. Cheyenne , WY 82001 USA Description Design Build Statement..., inpatient and business service spaces in multiple phases and areas of the facility. Design-Build (DB...,…...
Federal Agency | Wyoming
GBSD Integrated Command Center - FE Warren AFB WY
... LARGE AND SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build... be compatible with applicable DoD, Air Force, and base design standards. In addition, local...
Federal Agency | Wyoming
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) WY
...PARTICIPATION. The construction acquisition method is design-bid-build (construction). Construct a multi... will be executed using a Design-Bid-Build (DBB) project delivery method. This project consists of…...
Federal Agency | Wyoming
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) WY
...LARGE AND SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build...: This project will be executed using a Design-Bid-Build (DBB) project delivery method. This project...),…...
Federal Agency | Wyoming
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) WY
...PARTICIPATION. The construction acquisition method is design-bid-build (construction). Construct a multi... will be executed using a Design-Bid-Build (DBB) project delivery method. This project consists of…...
Federal Agency | Wyoming
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) WY
...PARTICIPATION. The construction acquisition method is design-bid-build (construction). Construct a multi... will be executed using a Design-Bid-Build (DBB) project delivery method. This project consists of…...
Federal Agency | Wyoming
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) WY
...PARTICIPATION. The construction acquisition method is design-bid-build (construction). Construct a multi... will be executed using a Design-Bid-Build (DBB) project delivery method. This project consists of…...
DEPT OF DEFENSE | Wyoming
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) WY
...is design-bid-build (construction). Construct a multi-story Missile Handling Complex (MHC) at FE Warren... AFB in Cheyenne, Wyoming: This project will be executed using a Design-Bid-Build (DBB) project...…...
DEPT OF DEFENSE | Wyoming
GBSD Integrated Command Center - FE Warren AFB WY
... BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build... should be compatible with applicable DoD, Air Force, and base design standards. In addition, local...
DEPT OF DEFENSE | Wyoming
GBSD Missile Handling Complex - FE Warren AFB WY
... is design-bid-build (construction). Project Description: The Missile Handling Complex includes...
DEPT OF DEFENSE | Wyoming
GBSD Integrated Command Center - FE Warren AFB WY
... is design-bid-build (construction). Project Description: This project consists of renovating.... The facility should be compatible with applicable DoD, Air Force, and base design standards. In...
DEPT OF DEFENSE | Wyoming
GBSD Missile Handling Complex - FE Warren AFB WY
... PARTICIPATION. The construction acquisition method is design-bid-build (construction). Project Description: The...
DEPT OF DEFENSE | Wyoming