| Location: | Federal |
|---|---|
| Posted: | Jun 30, 2025 |
| Due: | Jun 26, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912WJ25BA002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The New Haven Harbor O-and-M dredging project consists of dredging the 35-foot deep navigation channel and 35-foot deep turning basin below mean lower low water (MLLW) from Long Island Sound to the confluence at the Quinnipiac River. Approximately 770,000 cubic yards of predominantly silt and fine grain sand material shall be dredged from the 35-foot main channel and 35-foot turning basin during execution of this project. It is expected that material will be removed from the shoaled portions of New Haven Harbor channel and placed into scows before being delivered to the Central Long Island Sound Disposal Site. Dredging and disposal operations are anticipated to take 4 to 5 months, and will be performed during the period from October 1, 2025 to February 15, 2026 to meet environmental time of year (ToY) restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 200,000 CY per 30 calendar days. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District.

With GovernmentContracts, you can: