FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
| Location: |
Maryland |
| Posted: |
Sep 19, 2025 |
| Due: |
Oct 21, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
W912DR25BA006 |
| Publication URL: |
To access bid details, please log in. |
FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Active
Contract Opportunity
Related Notice
W912DR25BA006
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTH ATLANTIC
Office
W2SD ENDIST BALTIMORE
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Sep 19, 2025 11:03 am EDT
-
Original Date Offers Due: Oct 21, 2025 11:00 am EDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Dec 31, 2025
-
Initiative:
Classification
-
Original Set Aside:
-
Product Service Code: Z1KF - MAINTENANCE OF DREDGING FACILITIES
-
NAICS Code:
-
237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Baltimore MD
21201
Description
The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The dredging depth for all channels is between 35 and 50 feet mean lower low water (MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 950,000 cy will be dredged from the Maryland approach channels (Brewerton Eastern Extension and Craighill Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 550,000 cy will be dredged from Baltimore Harbor Channels (Brewerton and Seagirt West Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of one to two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
Attachments/Links
Contact Information
Contracting Office Address
-
CONTRACTING DIVISION 2 HOPKINS PLAZA
-
BALTIMORE , MD 21201-2526
-
USA
Secondary Point of Contact
History
Related Document
| Aug 4, 2025 | [Presolicitation (Original)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
| Oct 3, 2025 | [Solicitation (Updated)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
| Oct 8, 2025 | [Solicitation (Updated)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
| Oct 21, 2025 | [Solicitation (Updated)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.