Y1DA--630A4-26-401 MRI AHU Modification
| Location: |
Federal |
| Posted: |
Jul 23, 2026 |
| Due: |
Aug 7, 2026 |
| Agency: |
VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
36C24226R0060 |
| Publication URL: |
To access bid details, please log in. |
Y1DA--630A4-26-401 MRI AHU Modification
Active
Contract Opportunity
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
242-NETWORK CONTRACT OFFICE 02 (36C242)
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Jul 23, 2026 11:24 am EDT
-
Original Published Date: Apr 27, 2026 11:58 am EDT
-
Updated Date Offers Due: Aug 07, 2026 03:00 pm EDT
-
Original Date Offers Due: May 26, 2026 12:00 pm EDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Sep 06, 2026
-
Original Inactive Date:
Sep 02, 2026
-
Initiative:
Classification
-
Original Set Aside:
-
-
Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
-
236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Description
36C24226R0060
Amendment 3
630A4-26-401 MRI AHU Modification
6. Per our teams meeting this morning, please see below RFI's;
There are 3 potential options for the MRI chiller:
Air cooled package at grade with glycol and pump package.
Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water.
Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only.
Does The VA have a preference for which system works better for them?
The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice?
There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load?
COR answer(s):
It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications.
Accordingly, a series pump configuration is not considered an acceptable design.
The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.
Attachments/Links
Contact Information
Contracting Office Address
-
113 HOLLAND AVE
-
ALBANY , NY 12208
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
Follow WEAPONS STATION CON Active Contract Opportunity Notice ID N0038326QAA61 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 10/13/2026
Follow 48--VALVE,GLOBE Active Contract Opportunity Notice ID N0010426QNE54 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 10/14/2026
Follow BOMB BASE ASSEMBLY Active Contract Opportunity Notice ID N0038326QAA59 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 10/13/2026
Follow 16--HYDRAULIC,FLOW RATE, IN REPAIR/MODIFICATION OF Active Contract Opportunity Notice ID N0038326QSB71 Related
DEPT OF DEFENSE
Bid Due: 9/28/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.