| Location: | Oklahoma |
|---|---|
| Posted: | Jun 17, 2026 |
| Due: | Jun 30, 2026 |
| Agency: | |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | TBESS-SS-01 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
17 June 2026
Draft PWS and Draft CDRLS have been uploaded for review.
Industry Day is being planned and will be announced at a later date.
==================================================================================================
1.0 BACKGROUND AND OBJECTIVE
The 72d Civil Engineer Directorate (72 ABW/CE) at Tinker Air Force Base (TAFB), Oklahoma, is seeking capability statements from qualified industry partners to provide comprehensive, cradle-to-grave engineering project management, execution, and technical support services. The objective of this acquisition is to secure an agile, innovative, and highly qualified engineering workforce to manage the installation's built infrastructure portfolio.
2.0 CONTRACT STRUCTURE & STRATEGIC INTENT
The Government anticipates an IDIQ contract utilizing both Firm-Fixed Price (FFP) and FFP Level of Effort (LOE) Contract Line Item Numbers (CLINs) to address baseline workload, surge capacity, and specialized workload as appropriate. A critical strategic imperative of this contract is the support of the Government’s long-term workforce and insourcing strategy. The successful offeror must be capable of providing comprehensive knowledge transfer, developing rigorous Standard Operating Procedures (SOPs), and seamlessly transitioning specific functions to Government performance over the life of the contract.
3.0 SCOPE OF WORK SUMMARY
The scope of work is divided into two primary categories:
3.1. Baseline FFP-LOE Scope (Core Workload):
The contractor shall provide an optimally sized, on-site support team to execute the daily, continuous functions of the CEN portfolio, including:
3.2. Orderable IDIQ Scope (Surge & Specialized Workload):
The contractor shall maintain the capacity (including corporate reach-back) to dynamically scale support for discrete, project-specific task orders, including:
4.0 KEY PERSONNEL & QUALITY REQUIREMENTS
The Government requires a highly credentialed workforce to mitigate risk and ensure technical rigor. Key Personnel requirements include, but are not limited to:
Furthermore, strict adherence to data integrity is paramount. The contractor will be required to manage project data accurately and timely within designated Government IT systems of record (e.g., NexGen IT, Kahua) and will be evaluated against stringent Quality Performance Indicators (QPIs) tied to schedule adherence, cost estimating accuracy, construction cost control, and data accuracy.
| Jun 12, 2026 | [Sources Sought (Original)] Tinker Base Engineering Support Services (TBESS) Sources Sought |
| Jun 18, 2026 | [Sources Sought (Updated)] Tinker Base Engineering Support Services (TBESS) Sources Sought |
| Jul 2, 2026 | [Sources Sought (Updated)] Tinker Base Engineering Support Services (TBESS) Sources Sought |

With GovernmentContracts, you can:
...Stabilization,Excavation,Grade and Surface,Grubbing & Clearing,Pavement - Marking,Pavement Removal..., Excavation, Erosion Control - Temporary, ...
City of Broken Arrow
Bid Due: 7/28/2026