| Location: | California |
|---|---|
| Posted: | Aug 14, 2025 |
| Due: | Aug 8, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N6247324R5227 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the
BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.

With GovernmentContracts, you can:
Bid Detail Information Bid Number : RFB-IS-12200418 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/28/2050
Number IFB/RFP Name Release Date Due Date 2017-18 NPS-NPA Application Packet for CDE-certified
Los Angeles Unified School District
Bid Due: 12/31/2078
General Information BAVN ID: 30751 Event ID: 180000910001 Category: Commodity Type: Request For
City of Los Angeles
Bid Due: 6/30/2037
General Information BAVN ID: 30751 Event ID: 180000910001 Bid Method: Line Items Category:
City of Los Angeles
Bid Due: 6/30/2037