| Location: | California |
|---|---|
| Posted: | Jul 21, 2025 |
| Due: | Oct 9, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N6247324R5227 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the
BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.

With GovernmentContracts, you can:
Follow Install Water Softener and Hot Water Heaters at FCI Mendota Active Contract
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
Follow Repair ADM Baker Pool Complex Active Contract Opportunity Notice ID NAVMWR-26-R-0029 Related
DEPT OF DEFENSE
Bid Due: 6/05/2026
Project ID: MHC/039 Title: ATLAS (Access, Treatment, Linkage, and Stabilization): Integrated Children's Specialty
Sacramento County
Bid Due: 6/10/2026
CDBG 602748-25 - Sidewalk ADA Ramps Project (6-03-26) 1 Item(s)
City of Lawndale
Bid Due: 6/03/2026