Y1DA--Renovate Bldg. 110 Ground Floor | 590-21-121

Location: Federal
Posted: May 28, 2025
Due: Jun 4, 2025
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 36C24625B0013
Publication URL: To access bid details, please log in.
Follow
Y1DA--Renovate Bldg. 110 Ground Floor | 590-21-121
Active
Contract Opportunity
Notice ID
36C24625B0013
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
246-NETWORK CONTRACTING OFFICE 6 (36C246)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: May 28, 2025 06:32 am EDT
  • Original Published Date: Apr 18, 2025 03:12 pm EDT
  • Updated Date Offers Due: Jun 04, 2025 02:00 pm EDT
  • Original Date Offers Due: Mar 21, 2025 02:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 04, 2025
  • Original Inactive Date: Jun 19, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
Description View Changes
CONTRACTOR S REQUEST FOR INFORMATION AND GOVERNMENT RESPONSES

The description for Alternate #3 on drawing GI001 makes reference to an infrared scan. We are not able to locate this reference document. Please provide the infrared scan document.
See RoofScan Report dated: January 20, 2023, prepared by Pinnacle Engineering, LLC.
The description for Alternate #3 on drawing GI001 appears to require Alternate #3 to be an additive line item. The description on for Bid Item IV in the Price/Cost Schedule on page 7 of 81 of the IFB clearly describes this line item as a deductive line item. Please confirm that the cost of the roof repairs is to be included in the Base Bid and a deductive price is to be provided in the Bid Item IV in the Price/Cost Schedule.
Provide Alternate #3 as indicated in the price/cost schedule on page 7 of the IFB to be a deductive line item

Please confirm that the Superintendent can also perform the duties of the SSHO as well.
The site Superintendent may perform the duties of the SSHO. If permitted to serve as the SSHO, the site superintendent must meet the minimum qualifications for both SSHO and Superintendent.

Fire Protection note #12 on drawing FP000 requires a coordinated set of shop drawings . Spec section 21 13 13 requires shop drawings and hydraulic calculations as well. The work of the project is only to add and relocate sprinkler heads on an existing system. Please confirm that shop drawings and hydraulic calculations will not be required for this project.
Follow NFPA 13 chapter Existing System Modifications . Provide shop drawings with product data for new materials for areas within the Area of Work that will be added or modified. Sprinklers shall not be re-used per NFPA. Show enough of the existing system on the shop drawings to make all conditions clear as directed by NFPA 13. Hydraulic calculations will not be required unless required by NFPA 13.

Once the existing ceilings are removed, does the government require that the existing sprinkler heads be turned to the upright position during construction until they can be turned back down into the new ceiling grid?
Yes.

On drawings AE010, for the wall designation G3d 2 S, what does the 3 represent?
The 3 represents the structural stud size:
The 3 represents the structural stud size:
STUD SIZE
1 - 1 5/8" METAL STUD
2 - 2 1/2" METAL STUD
3 - 3 5/8" METAL STUD
4 - 4" METAL STUD / 4" SHAFTWALL STUD / 3-5/8" BLOCK
6 - 6" METAL STUD / 6" SHAFTWALL STUD

The description for Alternate #3 on drawing GI001 appears to require Alternate #3 to be an additive line item. The description on for Bid Item IV in the Price/Cost Schedule on page 7 of 81 of the IFB clearly describes this line item as a deductive line item. Please confirm that the cost of the roof repairs is to be included in the Base Bid and a deductive price is to be provided in the Bid Item IV in the Price/Cost Schedule.
Provide Alternate #3 as indicated in the price/cost schedule on page 7 of the IFB to be a deductive line item.

One of the electric panels in the corridor are removed and relocated to Rm DG50, the existing vinyl wall guard will need to be replaced given the holes in the existing wall guards due to the space occupied by the electric panels. Please provide the product specification for the existing vinyl wall protection guards.
Specifications will be provided.

In the same area the electric panels in the corridor are removed and relocated to Rm DG50, are the existing handrail and crash rails to be extended to the adjacent doorway?
Yes

Are the existing ceiling mounts for the TV monitors to be included in the demolition or will they be removed by the government?
Existing ceiling mounts for TV monitors to be included in demolition

Please confirm that all of the medical related equipment and devices will be removed by the government (or others) and is not required to be relocated by the contractor.
All the medical related equipment and devices will be removed by the government.
Please confirm that any devices, furnishings, equipment, cubical track curtains, etc that will remain in the space to be renovated and are not indicated on the drawings to remain are to be removed by the contractor and disposed.
Yes

The space above the ceilings is only 27 inches and is grossly insufficient for the new work to be installed. Will the government consider lowering the ceiling height to 8 ft for the new Admin Space DG52?
It is the intent of the design to keep that ceiling as close to 9 -0 as possible. The AE and VA will work with the awarded contractor during construction regarding the ceiling height and the above ceiling work required. 8 -0 is the minimum ceiling height required.

Can the FM 4991 requirement for firestopping be override if the subcontractor is registered with SAM to work on military projects? Or is it acceptable if they are qualified as an Accredited Firestop Contractor (HAFSC).
Follows the TIL requirements.

Is there any roofing work and which areas would they be?
See Sheet AE300 for roof work and coordinate roofing with MEP and the infrared scan report dated 1/20/2023.

Where will the electrical panels be removed in the corridor, and the wall will be filled in, what is the color that the KTR must match?
Color will be provided by VA.

The drawings incorrectly reference the water filtration room, will these be corrected?
Yes
Will the work be done during working hours and will that part of the hospital be open during construction.
Patient care is very important to the VA that may lead to working hours consisting of day, night and on weekends. The hospital will be open during construction.

To be included in TAB B , the solicitation calls for:
d. Complete Brand Name or Equal Clause and submit with electronic offer.
We see that Page 42 contains the 4.6 CONSTRUCTION MATERIALS BRAND NAME OR EQUAL LIST Are we right to assume, that this submission is if needed ? So, if we are not using any equal product, we do not have to submit anything.
If you are not using any equal product, you are still required to complete the Complete Brand Name or Equal Clause. In this case, you will provide the brand name. This is not a if needed requirement. It is required to complete either with a brand Name or Equal Product, whichever is applicable.

Since we were not able to observe the active space were dialysis is currently being
performed as required by FAR 52.236.3, we respectfully request another site visit as
was discussed during the initial site visit.
A second site visit was held on May 8, 2025, at 10:00 AM Eastern Daylight Time.

Since we were not able to observe the active space where dialysis is currently being
performed as required by FAR 52.236.3, we respectfully request an extension to the
due date for questions since we have not yet observed the existing conditions and
additional questions.
A second site visit was held on May 8, 2025, at 10:00 AM Eastern Daylight Time.
Drawing AE010 contains detail G10 for corner guards. However, the drawings do not
identify the locations corner guards to be provided. Please provide a drawing Which shows the locations the corner guards are to be provided.
Provide corner guards on all outside corners of new partitions and gypsum board column covers.

23. Drawing AE110 contains detail G10 for a trench repair detail. However, the drawings
do not identify the locations the trench detail is to be provided. Please provide a
drawing which identifies the locations the trench repair is required to be provided.
The trench repair detail G10/Sheet AE110 is provided for the patching of the existing concrete slab as required by the MEP SOW. See Note A, Sheet AE110 PATCH EXISTING CONCRETE FLOOR SLAB AS REQUIRED BY MEP SCOPE OF WORK. SEE MEP DRAWINGS FOR PIPING AND DRAIN REMOVAL AND COORDINATE FLOOR PATCHING PRIOR TO INSTALLATION OF NEW FLOORING.

The drawings and specifications do not appear to require any permanent signage to
be provided. Please confirm permanent signage (room signs, location signs, wayfare signs, etc are not required for this project.
Permanent signage (room signs, location signs, way fare signs, etc. are not required for this project.

Have the floor slabs been applied in previous renovations with a leveling compound
in which delamination during the floor finish removal process could be a concern?
If so, we request the government provide an allowance quantity we are to include in
our proposal for the repairs.
10% allowance

27. Can a single person perform the duties of the Superintendent, SSHO, and CQC
Systems Manager if they otherwise qualify for the respective positions?
No.

Each sheet of the drawing set is evenly dated August 17, 2023. Please confirm that
this is the most current set of drawings documents and that no other drawing set
exists upon which we are to base our proposal upon.
The most current set of documents is dated August 17, 2023.
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 100 EMANCIPATION DR
  • HAMPTON , VA 23667
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Jan 15, 2025[Presolicitation (Updated)] Y1DA--Renovate Bldg. 110 Ground Floor
Apr 18, 2025[Solicitation (Updated)] Renovate Bldg. 110 Ground Floor at Hampton VAMC, Virginia
Apr 24, 2025[Solicitation (Updated)] Renovate Bldg. 110 Ground Floor at Hampton VAMC, Virginia
Apr 30, 2025[Solicitation (Updated)] Renovate Bldg. 110 Ground Floor at Hampton VAMC, Virginia.
May 14, 2025[Solicitation (Updated)] Y1DA--Renovate Bldg. 110 Ground Floor | 590-21-121
May 19, 2025[Solicitation (Updated)] Y1DA--Renovate Bldg. 110 Ground Floor | 590-21-121
Jun 3, 2025[Solicitation (Updated)] Y1DA--Renovate Bldg. 110 Ground Floor at Hampton VAMC
Aug 21, 2025[Award Notice (Original)] Y1DA--Renovate Building 110 Ground Floor
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Y--VOYA 335009 N191 REHAB RAINY AND ASH Active Contract Opportunity Notice ID

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/09/2026

Follow 20--CYLINDER,DUPLEX Active Contract Opportunity Notice ID N0010426QYA76 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Bid Due: 7/31/2026

Follow F--Snake River Area Office Weed Control Active Contract Opportunity Notice ID 140R1726Q0025

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/12/2026

Follow Z1DA--646-21-101 UD SPS AHU & RO Upgrade (VA-26-00036217) Active Contract Opportunity Notice

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.