| Location: | Idaho |
|---|---|
| Posted: | Nov 15, 2025 |
| Due: | Nov 19, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1284LL26Q0010 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This requirement is for the Contractor to provide all labor to complete maintenance and repair services on the Heating, Ventilation, Air Conditioning (HVAC) and refrigeration systems at the Sandpoint Ranger District building, to include the geothermal loops. Contractor will be required to complete all Quarterly, Semi-Annual, and Annual preventative maintenance, providing all incidentals and materials. The Contractor shall submit a service report to the Contracting Officer’s Representative (COR) at the completion of each service visit and with the service report, the Contractor shall include corrective maintenance required.
Sandpoint Ranger District HVAC Preventative Maintenance - Amendment 1
The purpose of this amendment is for the following purposes:
1) Added a bullet point under the Quarterly Requirements for the Energy Recovery Ventilator (ERV) to inspect all components and ensure proper functioning of duct heater.
2) Deletion of all references to Variable Refrigerant Flow Fan Coils as there are none in the system at this location.
3) Deletion of all references to Branch Selector Boxes as there are none in the system at this location.
4) Clarification that exhaust fans are specific to the HVAC system.
5) Clarification that the Contractor will be responsible for ensuring proper replacement of any belts per manufacturer specifications.
6) Clarification that there is only one ductless mini-split system.
All changes are indicated with a vertical line in the left margin of the "a. 1284LL26Q0010_CSS_Amend1.docx" and "b. Sandpoint HVAC PWS.docx" documents. No changes were made to any other documents.
The hour and date for receipt of quotes has been extended to November 19, 2025 at 4:30 pm Pacific Time.
| Oct 31, 2025 | [Combined Synopsis/Solicitation (Original)] Sandpoint Ranger District HVAC Preventative Maintenance |

With GovernmentContracts, you can:
Bid date project number project name 11-04-26 24207 Leatherman Peak 2nd Floor Addition,
State Government of Idaho
Bid Due: 11/04/2026
Follow E-Waste Collection Events Active Contract Opportunity Notice ID INL-26-057 Related Notice Department/Ind.
ENERGY, DEPARTMENT OF
Bid Due: 11/13/2026
Follow Fenn Ranger Station roofing replacement Active Contract Opportunity Notice ID 1240LU26Q0130 Related
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/19/2026
Event: Center Consoles for Enforcement Vehicles Event: 1471-0 Category: AGENCY MANAGED Sub Category:
State Government of Idaho
Bid Due: 11/04/2026