| Location: | Georgia |
|---|---|
| Posted: | Aug 19, 2025 |
| Due: | Sep 19, 2025 |
| Agency: | City of Sandy Springs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-008 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Mountain Creek Road Maintenance Project involves rehabilitating approximately 90 LF of 72" corrugated metal pipe using centrifugally cast concrete pipe (CCCP), replacing the upstream headwall, installing upstream stream bed protection, and replacing part of the driveway at 5775 Mountain Creek Road. Work also includes site grading, erosion control, and protection of an existing 10" Fulton County sewer line crossing the headwall.

With GovernmentContracts, you can:
...water line, all work complete with appurtenances, including traffic control, striping and erosion ...
G. Ben Turnipseed Engineers
Bid Due: 8/13/2026
...: Link Description Roadway construction along multiple paved roads, including traffic control, erosion... ...
State Government of Georgia
Bid Due: 8/27/2026
..., and insurance necessary to complete the work and shall provide erosion control, ...
State Government of Georgia
Bid Due: 8/17/2026
..., materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures... grading, ...
State Government of Georgia
Bid Due: 8/25/2026