| Location: | Virginia |
|---|---|
| Posted: | Feb 6, 2025 |
| Due: | Feb 12, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9123625B5002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Required work includes new work dredging by mechanical or bucket plant at the southeastern cell of the CIEE. The southeastern cell main dike footprint is being deepened to a required depth of -41 feet mean lower low water (MLLW). Also, the central and southern access channel footprints are being deepened to a required depth of -25 feet MLLW. Two feet of allowable over depth dredging will be part of the contract dredging pay prism for both the main dike and access channel footprints. A main dike footprint not to exceed depth of -46 feet MLLW will be observed for this project. A central and southern access channel footprints not to exceed depth of -30 feet MLLW will be observed for this project. Material removed from the dike footprint will be received by ocean-going scows and placed at the Norfolk Ocean Disposal Site (NODS). The scope requires a 3-year US Environmental Protection Agency USEPA Section 103 concurrence, and the estimated volume to be placed at NODS is 3-million cubic yards.The Contractor shall be responsible for the following: dredging within the designated areas to the proposed and allowable pay depths, placing the removed material in ocean-going barges, transporting the ocean-going barges with the collected material to NODS, depositing the collected material at NODS, and communicating with the Port of Virginia maritime users to minimize impacts to vessel traffic and other dredging operations.
| Nov 29, 2024 | [Presolicitation (Original)] Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C |
| Jan 14, 2025 | [Solicitation (Original)] Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C |
| Feb 7, 2025 | [Solicitation (Updated)] Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C |
| Feb 18, 2025 | [Solicitation (Updated)] Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C |
| Feb 20, 2025 | [Solicitation (Updated)] Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C |

With GovernmentContracts, you can:
Number Name Due Date Due Time IFB 2819 Attachment A-Forest Park
Roanoke City Public Schools
Bid Due: 12/12/2028
Bid Number NIGP Class Description Pre-Bid Date/Time Date/Time Due Buyer Actions IFB1944 91036
York County
Bid Due: 4/14/2030
Opportunity History Complete View Original Synopsis Special Notice Jan 24, 2019 5:24 pm
Department of the Navy
Bid Due: 3/29/2033
RFP 1294-3 RFP 0815-21-CAC; Camps & Classes Status: Open Time Left:3703 days Closing:
State Government of Virginia
Bid Due: 10/31/2031