| Location: | Washington |
|---|---|
| Posted: | Aug 29, 2025 |
| Due: | Sep 5, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N0040625QS561 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Statement of Work
SWFPAC requires engine repair and replacement for two Lenco BearCat armored vehicles, one for diesel engine and tire replacement, and the second for diesel engine replacement.
Applicable References: OEM service manuals, Ford F-550 chassis specs, and Lenco BearCat maintenance manual.
1. Purpose:
This Statement of Work defines the requirements for two (2) Lenco BearCats:
Each Lenco BearCat armored vehicle shall be restored to full operational capability to ensure continued performance is in accordance with manufacturer specifications in relation to requested repairs.
2. Scope of Work:
The contractor shall provide all labor, tools, equipment, and materials necessary to perform the following tasks:
2.1 Lenco BearCat#1, (USN 95-31822), VIN: 1FDAF5HT3BEB33142:
Engine Replacement (6.7L Power Stroke Turbo-Diesel V8)
Tire Installation:
2.2 Lenco BearCat #2 (USN 95-31820), VIN: 1FDAF5HT1BEB33141:
Engine Replacement (6.7L Power Stroke Turbo-Diesel V8)
3. Standards and Requirements:
All replacement parts and components must meet or exceed original manufacturer standards. Work shall be conducted in accordance with OEM technical manuals and applicable federal, state, and local regulations.
The Contractor shall be responsible for all quality control, all inspections, and any required factory tests and inspections.
The Contractor will dispose of replaced engine, engine components, and hazardous waste per local, state, and federal regulations.
Any part replacement and / or additional repair cost (Labor and Material) beyond the SOW must be approved by the Contracting Officer.
4. Deliverables:
The contractor shall be responsible for all quality control, all inspections, and any required factory tests and inspections to include:
Warranty documentation shall be provided for all parts and labor.
The contractor shall dispose of replaced engine, engine components, and hazardous waste per local, state, and federal regulations.
5. Delivery of Items:
The Government POC will coordinate delivery and pick up of vehicles upon contract award.
6. Period of Performance:
All tasks shall be completed within 30 business days from the date of contract award, unless otherwise negotiated.
| Aug 26, 2025 | [Presolicitation (Original)] Lenco Bearcat Armored Vehicle Repair |
| Aug 26, 2025 | [Solicitation (Original)] Lenco Bearcat Armored Vehicle Repair |

With GovernmentContracts, you can: