| Location: | Utah |
|---|---|
| Posted: | May 8, 2025 |
| Due: | May 29, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SLCDA-DCM-542511 |
| Publication URL: | To access bid details, please log in. |
Project Description: Hughes & Upper Limit:
This project is for site development within General Aviation Zone 3 on the eastside of Salt Lake City International Airport (SLCIA) to support future corporate hangar expansion. Work will include the demolition of the existing GA-35 and GA-36 hangars, the removal and capping of all utilities, and site restoration and preparation to accommodate future development. Hughes is building a new hangar in Zone 3 immediately east and south of the FAA FMP building. Upper Limit has plans to relocate to South Valley Regional Airport (SVRA) in the coming year. Both of their current leases are month to month to facilitate the subsequent demolition and move to the new locations. The parcel that exists after the demolition will be redeveloped by AirMed for a new U of U facility allowing demolition of their existing facility upon completion of their new hangar and building.
Rows 6, 7, 10, & 11:
This project is for site development within General Aviation Zone 1 on the east side of Salt Lake City International Airport (SLCIA) to support future expansion. Work will include demolition of T-hangars (Rows 6, 7, 10 and 11) along with asbestos mitigation, if necessary, and disconnecting existing utilities.

With GovernmentContracts, you can:
...will then move to the next lowest bid until the line-item need is ...
State Government of Utah
Bid Due: 6/23/2026
...possible for this event. Each vendor must score a minimum of 70% or ...
State Government of Utah
Bid Due: 6/16/2026
..., functional specifications and limitations to the heavy duty TigerTug model 12.0. To ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...to the heavy duty TigerTug model 12.0. To be used to move and ...
DEPT OF DEFENSE
Bid Due: 6/22/2026