| Location: | Texas |
|---|---|
| Posted: | Jan 8, 2025 |
| Due: | Jan 13, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA301625Q0017 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Posted Answers to questions that was submitted by 6 Jan 2025. Posted Answers Jan 8, 2025. (see Attached)
This Solicitation has been revised with new Proposal date(13 January 2025) and a SITE VISIT scheduled for( 3 January 2025)
Please Review all attachments:
The contractor shall provide all personnel, equipment, supplies, tools, materials, and all non-personal services necessary for purchase and to install one industrial ceiling fan in support of the 344th Training Squadron (TRS), at Lackland bldg. 10904 as defined in this Statement of Work (SOW) Offerors shall inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.
SPECIFIC REQUIREMENTS:
1.3.1. The industrial ceiling fan shall be mounted to structural beams and shall have safety cables.
1.3.2. The contractor shall hang the industrial ceiling fan with mount from the manufacturer and installed in accordance with manufacturer specifications.
1.3.3. The contractors shall make electrical connections from the industrial ceiling fan to the power panel.
1.3.4. Structural Grade 8.8 bolts shall be used for mounting.
1.3.5. Wiring shall be in electrical conduit (no exposed wires.)
1.3.6. The contractor shall insure that all possible deflection, vibration, torque, and other such detrimental forces are considered, controlled, and eliminated as necessary.
1.3.7. The contractor shall provide and install all metal conduit, fittings, boxes wire, and switches necessary to establish full and necessary electrical circuits and ensure a perfectly working and code compliant ceiling fan system.
1.3.8. Industrial ceiling fan shall have a minimum drop from support beam of 12”.
1.3.9. Contractor shall install the Fan (bldg. 10904) on main structural ceiling beam 35’ 8” from South wall and 75’ from the East wall. Fan shall be centered between vertical beams.
1.3.10. Contractor shall install a ceiling fan control box 44’ from the east wall next to the current light switch at the south entrance/exit door.
| Dec 10, 2024 | [Solicitation (Updated)] Warehouse Fan Bldg. 10904 |
| Dec 20, 2024 | [Solicitation (Updated)] Warehouse Fan Bldg. 10904 |
| Jan 7, 2025 | [Solicitation (Updated)] Warehouse Fan Bldg. 10904 |

With GovernmentContracts, you can:
..., winches, saws, tool boxes, headache racks, tire machines, air compressors, ground lifts, ...
City of Wichita Falls
Bid Due: 6/13/2026
...and AHU-6, and their respective ducting systems, Variable Air Volume (VAV) boxes, and ...
DEPT OF DEFENSE
Bid Due: 6/15/2026