S205--629-26-2-622-0217 Solid Waste Contract

Location: Federal
Posted: Mar 9, 2026
Due: Mar 25, 2026
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • S - Utilities and Training Services
Solicitation No: 36C25626Q0424
Publication URL: To access bid details, please log in.
Follow
S205--629-26-2-622-0217 Solid Waste Contract
Active
Contract Opportunity
Notice ID
36C25626Q0424
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
256-NETWORK CONTRACT OFFICE 16 (36C256)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Mar 09, 2026 01:17 pm CDT
  • Original Published Date: Mar 05, 2026 10:20 am CST
  • Updated Date Offers Due: Mar 25, 2026 10:00 am CDT
  • Original Date Offers Due: Mar 25, 2026 10:00 am CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Apr 04, 2026
  • Original Inactive Date: Apr 04, 2026
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
  • Product Service Code: S205 - HOUSEKEEPING- TRASH/GARBAGE COLLECTION
  • NAICS Code:
    • 562111 - Solid Waste Collection
  • Place of Performance:
    ,
Description View Changes





















5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the
offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter
or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to
the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print)
(Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign)
(Signature of Contracting Officer)

0001
629-26-2-622-0217


Department of Veterans Affairs
Overton Brooks VA Medical Center (90C)
510 East Stoner Avenue
Shreveport LA 71101


Department of Veterans Affairs
Overton Brooks VA Medical Center (90C)
510 East Stoner Avenue
Shreveport LA 71101
To all Offerors/Bidders



36C25626Q0424

X

X

X
See CONTINUATION Page





X
1
The purpose of this amendment is to correct CLIN structure and provide revised PWS.

Please see attached updated CLINs and revised PWS for this solicitation.






A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001

106.00
EA
__________________
__________________

2400 Canal St - 39yd Compactor Hauls (2x/week) plus 10 additional hauls 96 + 10 =106 total EA
Estimate two pull per week, 96 pulls per year with 10 additional pulls as needed at end of some months.
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0002

12.00
MO
__________________
__________________

2400 Canal St - 39yd Compactor Rental 1x Month
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0003

12.00
MO
__________________
__________________

2400 Canal St - (Once) Monthly Compactor Cleaning 1x Month
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0004

12.00
MO
__________________
__________________

2400 Canal St - 30yd Open Top Rental 1x Month
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0005

156.00
EA
__________________
__________________

CEP Loading Dock 2400 Canal St - 30yd Open Top Hauls (3x/week)
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0006

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for trash dumpster per month

Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0007

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for metal recycling dumpster per month

Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0008

1,000.00
TN
__________________
__________________

Solid Waste Disposal All Locations Disposal per Tonnage
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0009

12.00
MO
__________________
__________________

CBOC - Solid Waste Disposal
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0010

96.00
EA
__________________
__________________

CEP Loading Dock 2400 Canal St. Recycling Main Hospital (2x/week) 8yd
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
0011

12.00
MO
__________________
__________________

CBOC - Recycling
Contract Period: Base
POP Begin: 04-20-2026
POP End: 04-19-2027
PRINCIPAL NAICS CODE: 562111 - Solid Waste Collection
PRODUCT/SERVICE CODE: S205 - Housekeeping - Trash/Garbage Collection
1001

106.00
EA
__________________
__________________

2400 Canal St - 39yd Compactor Hauls (2x/week) plus 10 additional hauls 96 + 10 =106 total EA
Estimate two pull per week, 96 pulls per year with 10 additional pulls as needed at end of some months.
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1002

12.00
MO
__________________
__________________

2400 Canal St - 39yd Compactor Rental 1x Month
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1003

12.00
MO
__________________
__________________

2400 Canal St - (Once) Monthly Compactor Cleaning 1x Month
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1004

12.00
MO
__________________
__________________

2400 Canal St - 30yd Open Top Rental 1x Month
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1005

156.00
EA
__________________
__________________

2400 Canal St - 30yd Open Top Hauls (3x/week)
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1006

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for trash dumpster per month
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1007

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for metal recycling dumpster per month
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1008

1,000.00
TN
__________________
__________________

Solid Waste Disposal All Locations Disposal per Tonnage
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1009

12.00
MO
__________________
__________________

CBOC - Solid Waste Disposal
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1010

96.00
EA
__________________
__________________

2400 Canal St. Recycling Main Hospital (2x/week)
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
1011

12.00
MO
__________________
__________________

CBOC - Recycling
Contract Period: Option 1
POP Begin: 04-20-2027
POP End: 04-19-2028
2001

106.00
EA
__________________
__________________

2400 Canal St - 39yd Compactor Hauls (2x/week) plus 10 additional hauls 96 + 10 =106 total EA
Estimate two pull per week, 96 pulls per year with 10 additional pulls as needed at end of some months.
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2002

12.00
MO
__________________
__________________

2400 Canal St - 39yd Compactor Rental 1x Month
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2003

12.00
MO
__________________
__________________

2400 Canal St - (Once) Monthly Compactor Cleaning 1x Month
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2004

12.00
MO
__________________
__________________

2400 Canal St - 30yd Open Top Rental 1x Month
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2005

156.00
EA
__________________
__________________

2400 Canal St - 30yd Open Top Hauls (3x/week)
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2006

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for trash dumpster per month
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2007

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for metal recycling dumpster per month
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2008

1,000.00
TN
__________________
__________________

Solid Waste Disposal All Locations Disposal per Tonnage
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2009

12.00
MO
__________________
__________________

CBOC - Solid Waste Disposal
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2010

96.00
EA
__________________
__________________

2400 Canal St. Recycling Main Hospital (2x/week)
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
2011

12.00
MO
__________________
__________________

CBOC - Recycling
Contract Period: Option 2
POP Begin: 04-20-2028
POP End: 04-19-2029
3001

106.00
EA
__________________
__________________

2400 Canal St - 39yd Compactor Hauls (2x/week) plus 10 additional hauls 96 + 10 =106 total EA
Estimate two pull per week, 96 pulls per year with 10 additional pulls as needed at end of some months.
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3002

12.00
MO
__________________
__________________

2400 Canal St - 39yd Compactor Rental 1x Month
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3003

12.00
MO
__________________
__________________

2400 Canal St - (Once) Monthly Compactor Cleaning 1x Month
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3004

12.00
MO
__________________
__________________

2400 Canal St - 30yd Open Top Rental 1x Month
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3005

156.00
EA
__________________
__________________

2400 Canal St - 30yd Open Top Hauls (3x/week)
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3006

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for trash dumpster per month
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3007

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for metal recycling dumpster per month
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3008

1,000.00
TN
__________________
__________________

Solid Waste Disposal All Locations Disposal per Tonnage
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3009

12.00
MO
__________________
__________________

CBOC - Solid Waste Disposal
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3010

96.00
EA
__________________
__________________

2400 Canal St. Recycling Main Hospital (2x/week)
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
3011

12.00
MO
__________________
__________________

CBOC - Recycling
Contract Period: Option 3
POP Begin: 04-20-2029
POP End: 04-19-2030
4001

106.00
EA
__________________
__________________

2400 Canal St - 39yd Compactor Hauls (2x/week) plus 10 additional hauls 96 + 10 =106 total EA
Estimate two pull per week, 96 pulls per year with 10 additional pulls as needed at end of some months.
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4002

12.00
MO
__________________
__________________

2400 Canal St - 39yd Compactor Rental 1x Month
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4003

12.00
MO
__________________
__________________

2400 Canal St - (Once) Monthly Compactor Cleaning 1x Month
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4004

12.00
MO
__________________
__________________

2400 Canal St - 30yd Open Top Rental 1x Month
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4005

156.00
EA
__________________
__________________

2400 Canal St - 30yd Open Top Hauls (3x/week)
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4006

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for trash dumpster per month
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4007

24.00
EA
__________________
__________________

4301 Poche Court West, New Orleans Warehouse - 30yd Open Top Hauls on call (2) hauls for metal recycling dumpster per month
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4008

1,000.00
TN
__________________
__________________

Solid Waste Disposal All Locations Disposal per Tonnage
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4009

12.00
MO
__________________
__________________

CBOC - Solid Waste Disposal
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4010

96.00
EA
__________________
__________________

2400 Canal St. Recycling Main Hospital (2x/week)
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031
4011

12.00
MO
__________________
__________________

CBOC - Recycling
Contract Period: Option 4
POP Begin: 04-20-2030
POP End: 04-19-2031


GRAND TOTAL
__________________






PERFORMANCE WORK STATEMENT (PWS)
WASTE MANAGEMENT
Feb 2026

GENERAL:

Contractor shall be responsible for allocating all equipment and personnel, including back-up resources, to meet all requirements for the comprehensive management of solid waste and the recycling programs at Southeast Louisiana Health Care System (SLVHCS). The comprehensive waste services shall include the collection and disposal of the waste, and the training and support required to ensure compliance with all Federal, State, and Local regulations. The Contractor must have relevant experience in providing comprehensive waste management services. The ability to provide waste audits and to properly separate waste streams is crucial to this requirement.
All self-contained roll off compactors shall be designed for dock usage or as further defined herein. Any mechanical or electrical modifications to accommodate the compactors in the designated dock areas will be at the cost of the Contractor and not the Department of Veterans Affairs (VA). The contractor also has the responsibility for maintaining/repairing the equipment/materials, compactors operation or supplies required at no cost to the VA. The compactors must be designed to meet or exceed all safety standards to include key type lock/start control; emergency stop, and safety retract controls. Unit must be designed to prevent leakage, spillage, odors and pest control concerns. The Contractor shall install, maintain and monitor an automated notification fullness system (i.e., fax) that will maximize usage and notify Contractor when compactor is ready for replacement. Setting will be at the agreement of the Contractor and COR to maximize usage of the units. The Contractor shall submit with his/her signed Proposal a detailed description of the type of compactor recommended for use under this Contract.
The Contractor shall clearly show a plan that will easily measure the reductions in volumes on a monthly basis. It shall be the responsibility of the Contractor to provide the tracking and reports in a timely manner, and action plans to address any shortfalls.

BACKGROUND:

The SLVHCS is a dynamic and progressive health care organization dedicated to providing quality, compassionate and accessible care and service to Louisiana veterans. The New Orleans VA Medical Center and Community Based Outpatient Clinics (CBOC), all work together to form this comprehensive health care delivery system. To ensure the provision of quality patient care, the health care system employs 2,500 plus professional, technical, administrative and support personnel who work together to meet the needs of Louisiana Veterans.

PERIOD OF PERFORMANCE:
Performance Period: The Period of Performance for this contract service shall be for one (1) base year and four (4) one-year option periods.
Base Year: 04/20/2026 04/19/2027
Option Year 1: 04/20/2027 04/19/2028
Option Year 2: 04/20/2028 04/19/2029
Option Year 3: 04/20/2029 04/19/2030
Option Year 4: 04/20/2030 04/19/2031
Type of Contract: The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
PLACES OF PERFORMANCE: Solid Waste and recycling removal are required at the following sites:
a.
VA Baton Rouge South CBOC, 7850 Anselmo Lane, Baton Rouge, LA.
b.
Hammond CBOC, 1131 South Morrison Blvd., Hammond, LA
c.
Slidell CBOC, 60491 Doss Dr, Suite B, Slidell, LA
d.
St. John CBOC, 247 Veterans Blvd, Reserve, LA
e.
Poche Ct West Warehouse, 4301 Poche Court West, New Orleans, LA
f.
VA Medical Center, 2400 Canal St., New Orleans, LA

Recycling plans and concepts will need to be developed for the following sites:

a.
VA Baton Rouge South CBOC, 7850 Anselmo Lane, Baton Rouge, LA.
b.
Hammond CBOC, 1131 South Morrison Blvd., Hammond, LA
c.
Slidell CBOC, 60491 Doss Dr, Slidell, LA
d.
St. John CBOC, 247 Veterans Blvd, Reserve, LA
e.
VA Medical Center, 2400 Canal St., New Orleans, LA
FREQUENCY OF SERVICE(s) PROVIDED:

Current Services Only:

Location
Building
Service
Container Size
CBOC
Hammond, LA
Mon/Wed/Fri
8yd
CBOC
Slidell, LA
Mon/Wed/Fri
8yd
CBOC
New Orleans, LA
Mon/Wed/Fri
8yd
CBOC
Reserve, LA
Mon/Wed/Fri
8yd
CBOC
Baton Rouge, LA
Mon/Wed/Fri
8yd
2400 Canal Street
D&T Loading Dock
2X Weekly
39yd Compactor
2400 Canal Street
CEP Loading Dock
On Call (Recycle)
8yd
2400 Canal Street
CEP Loading Dock
3X Weekly
30yd Open
Warehouse
Poche Ct Warehouse
2X Monthly On Call Recycling and Trash
30yd Open

DAYS AND HOURS OF OPERATION:
Monday Friday, 7:00 a.m. to 3:30 p.m. excluding federal holidays. The expectation is that solid waste containers are removed early enough and returned by 9:00 a.m. on pick-up days.

PERFORMANCE REQUIREMENTS: The contractor shall provide creative, efficient and innovative solutions that demonstrate the contractor s ability to properly understand and perform the services of this requirement. The contractor shall demonstrate technical solutions and approaches that exhibit the contractor s experience and qualifications in providing these services. The contractor shall be required to provide a demonstration of the resources, equipment and qualified personnel that are available to commit to this requirement. The contractor shall provide all labor, supplies, equipment, and disposal for the following services:

Solid waste disposal services
Recycling Services:
Scrap metal
Pallets
Shrink Wrap
Plastic High Density Polyethylene Resin (HDPE) 1-5
Waste audits
Training for waste streams to ensure compliance

REFERENCE/REQUIREMENTS: The requirements of the following agencies must be met at all times, Environmental Protection Agency (EPA) 40 Code of Federal Regulations (CFR), Food and Drug Administration (FDA) Quality System Regulation as stated in 21 CFR Part 820, Department of Transportation (DOT) 49 CFR and Occupational Safety and Health Administration (OSHA).

GENERAL REFUSE/RUBBISH SPECIFICATIONS Provide all labor, transportation, containers and equipment to remove and dispose of general rubbish/trash at Southeast Louisiana VA Health Care System.
The Contractor shall provide SLVHCS (Site #1) with one thirty-nine (39) cubic yard self-contained roll off compactor designed for dock usage. Estimate two pulls per week. This compactor is also required to be cleaned once monthly. In addition, Contractor shall provide one 30 yard open top dumpster as needed (will call) basis. Estimate two pull per week, 96 pulls per year with 10 additional pulls as needed at end of some months.
The Contractor shall provide the Poche Ct Warehouse (Site #2) one 30 yard open top dumpster as needed (will call) basis. Estimate two pull per month, 24 pulls per year.
The Contractor shall provide the Poche Ct Warehouse - 30yd Open Top Hauls on call (2) hauls for metal recycling dumpster as needed (will call) basis. Estimate two pull per month, 24 pulls per year.
Each of the 5 CBOCs will require an 8-yard dumpster with service every Monday, Wednesday, and Friday.
We estimate 1,000 tons of solid waste annually for SLVHCS which includes the 5 CBOCs combined. Offeror will provide an explanation of how they will provide verifiable weights of solid waste removed.
The SLVHCS solid waste service is a critical support service for the Hospital. Solid waste must be removed from the facility in an efficient and timely manner so as not to interfere with work production within buildings or at the loading docks. Maintaining the cleanliness and aesthetic appearance of the equipment shall be a high priority.
The loading dock is the most critical area for the management of the solid waste. The waste must be removed on schedule so as not to interfere with the facility operations at the loading dock. The containers must be in good condition. As part of this solicitation, the contractor shall provide new equipment to ensure the cleanliness and aesthetic appearance are satisfactory.
Used compactor equipment will be authorized temporarily, provided that new compactors are ordered, and confirmation of order can be provided. The COR must approve equipment, locations, and contractor prior to implementation.
The compactor must be designed to maximize fullness and to minimize the required pulls, to avoid disruption to service. The compactor must be designed to meet or exceed all safety standards to include key type lock/start control, emergency disconnect within 10 feet of the machine, and an emergency stop. Unit must be designed to prevent leakage, spillage, odors and pest control concerns. Compactors shall have electronic notification devices that notify the COR and the contractor. Compactors will be required to have a cart dumper to minimize handling of solid waste by the VA staff.
Any required mechanical or electrical modifications to accommodate the compactors in the designated dock areas shall be noted and corrected by the contractor. The Contractor is responsible for the installation of the compactor, once the VA has prepared the site as specified.
The Contractor must provide a plan for maintaining the cleanliness of the containers and equipment.
The Contractor shall provide the types and quantities of vehicles, solid waste collection equipment and/or containers proposed to provide the required services. A separate listing of proposed equipment and containers shall be provided for review.
The Contractor shall provide the proposed frequencies for the emptying of solid waste containers or equipment, including required times for off-site disposal.
The Contractor shall provide the methods and procedures proposed to provide the required preventive maintenance and emergency repairs to the Contractor provided solid waste containers and equipment. If abuse or vandalism is identified, it shall be immediately brought to the attention of the COR, and arrangements for repair shall be agreed upon by Contractor, Contracting Officer, and COR.
Contractor shall maintain a log of solid waste shipments. The log shall identify the date, time and quantities of solid waste shipped.

RECYCLING SPECIFICATIONS: Provide all labor, transportation, containers and equipment for recycling of all mixed grade paper / loose cardboard at Southeast Louisiana VA Health Care System in accordance with the specifications, terms and conditions of this solicitation.
The Contractor is responsible for the removal and transporting of recyclable mixed grade paper and loose cardboard for processing from SLVHCS pick up each Monday, Wednesday, and Friday
SPECIAL NOTE: Contractor will remove all the baled cardboard under this contract and all pallets Monday, Wednesday, and Friday.
The Contractor/awardee agrees that the collected recyclable paper may contain information which is subject to and protected by Title 5, U.S. Code, Section 552a, commonly known as the Privacy Act of 1974 and other confidentiality statues to which the Department of Veterans Affairs is subject, including Title 38, U.S. Code, Section 3301 and Tide 38, U.S. Code, Section 4132. The Contractor by accepting award of this contract, acknowledges that it is fully bound by these statues in its handling of paper and agrees that it will institute appropriate procedures to safeguard recyclable paper obtained from all sites.
The Contractor is responsible for the removal and transporting of all baled items from the facility. The baled items shall generate a rebate to the VA. The rebate shall be applied to the invoice for the comprehensive waste management.
Contractor shall maintain a log of recycling shipments. The log shall identify the quantities of recyclables shipped and the rebates generated as a result.
Contractor shall design a recycling program to institute recycling of items not currently captured by SLVHCS to meet the VA Directive. The recycling program shall be identified as part of the waste audit. Contractor shall consider single stream based on the size and location of facilities.
BATTERY PACKING All batteries shall be packaged for transportation in a manner which prevents short circuiting and damage to the battery or its terminals. This may be achieved by the following measures listed below:

Each battery must be placed in a separate plastic baggie , or the terminal ends must be taped securely.
All other batteries must be in accordance with all local, state and federal regulations. All containers shall be visibly labeled before any batteries are placed into the containers.
Battery containers must be properly labeled and sorted by type.
Large-vented batteries (lead acid, vented NiCad, etc.) which are palletized shall have a heavy cardboard or non conductive divider between the battery terminals if stacked on the pallet. Batteries must be securely packaged on the pallet in a way which prevents shifting during transportation.

BULB PACKING All bulbs shall be packaged for transportation in a manner which prevents breaking and or damage.

Lamps are to be shipped in original container or equal. Boxes and drums are available for purchase or rental. Containers shall be labeled Universal Waste prior to any bulbs being placed back into the container.
Boxes of lamps can be placed on the same pallets that the originals came on. If they are unavailable, attach two pallets together to accommodate the eight-foot lamps.
Shrink-wrap the pallets for transport
Pack the boxes full of lights, they travel better this way.
Tape the end of the box when full.
Remove the dividers from the box.
Arrange the boxes neatly on the pallet.
Keep lamps dry.

SCRAP METAL/PALLETS The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform scrap metal and pallet recycling at SLVHCS. VA Warehouse personnel shall call the COR as needed for delivery of various size scrap metal containers including 10 cubic yards, 20 cubic yards, 30 cubic yards and/or 40 cubic yards. The contractor shall deliver and drop the container in an area designated by VA Warehouse personnel during normal business hours, between 8:00 am and 4:30 pm, Monday through Friday, excluding federal holidays. Once called, the contractor will deliver the scrap metal container within 48 hours upon the telephone request (excluding weekends and holidays). Container requests may be issued for any combination of containers. Once the container is full or ready for pick up, VA Warehouse personnel shall notify COR via telephone. VA Warehouse personnel shall neatly stack all pallets in accordance with the contractor s specific guidance. The contractor shall pick up the materials and provide the COR a receipt.

WASTE AUDIT: The Contractor shall provide to SLVHCS an annual waste stream survey of all sites to include a formal written report after completion, in which contractor specifically reviews the waste generation and waste flow within the facility to determine areas of opportunity for waste reduction and elimination.
Once a clear reduction plan is approved, the Contractor and the VA will implement the program. Contractor and VA will develop internal relationships with generators and work with them to achieve the program's goals. Contractor and VA will train generators on the different types of waste in their area (infectious, noninfectious and recyclable) and where to properly dispose of it. The contractor shall monitor & track costs, waste generation by type and location, and training records for employees. All training records shall be sent electronically to the COR and COR designee.
Contractor understands that they shall also be required to provide subsequent briefing and in-service training for SLVHCS. This training shall be conducted at no cost to the VA. Dates and times of training will be mutually agreed upon between the Contractor and the COR.
The Contractor shall provide training for all sites as deemed necessary to include initial training for Environmental Management Service personnel on any new procedures relative to the handling/processing of regulated medical waste. This shall be scheduled (if necessary) by the COR after awarding of the contract. Cost for these services shall be provided at no additional cost to the VA and limited to once annually.
The Contractor provides a monthly tracking reporting system that shall allow for SLVHCS to track all wastes from the point of generation as a means to identify waste poundage and classification. This report shall clearly demonstrate the facilities classification of waste and opportunities for reduction. The report shall track all waste streams-solid waste, medical waste, sharps waste, incinerating only waste, recycling and plastic diversion. The report shall also provide recycling factoids (ie. pounds). The Contractor shall be responsible to submit to the COR a sample of the proposed report required for the approval of the COR. This sample shall be submitted within ten (10) calendar days of receipt of the Notice of Award.
CONTINGENCY PLAN: The Contractor shall have in place and maintain a valid contingency plan to meet the requirements of the contract to avoid an interruption of service due to failure of equipment or personnel issues. The Contractor shall provide the VA COR a contingency plan addressing back-up plans for collection, transportation, treatment and disposal of the VA s waste in the event of any condition which impedes the ability to perform the services specified in this SOW. The Contractor shall incur all cost associated with fulfilling this contingency plan at no additional cost to the Government.

Provide the following information on the contractor's emergency response (ER) capabilities (or any changes to original submission):

Contractor's ER policies.
ER capabilities and experience and limitations.
Type of ER equipment maintained (specify if owned or subcontracted and from whom).
Personnel availability, training and experience.
Contractor's emergency response procedure shall describe:
How to request an emergency response.
How the contractor notifies personnel and initiates response action.
Incident command procedures followed by the contractor.
ER work practices.
ER protection of health and safety practices.
ER invoicing policy.

SPECIAL CONTRACT REQUIREMENTS
Qualifications:
Contractor shall have demonstrated at least three years experience servicing at least three similar size hospitals by submitting a list of references including telephone numbers, addresses, and contact names.
Contractor shall provide a plan to demonstrate that they are capable of providing ongoing requirements and services in the event of service disruptions for any reason. Contractor shall provide information for primary and back-up sites for the following: regulated medical waste disposal services, reusable sharps container exchange services, solid waste disposal services, and recycling services.
Contractor shall provide a complete background of their company as well as any company utilized to sustain this contract. Information will include but is not limited to: company s full legal name, primary business address, all other office locations (city and state), and history, along with the number of years in business.
Contractor shall demonstrate their ability to convert the VA locations to their services immediately after award of the contract.
Contractor shall have in place and maintain a valid contingency plan to meet the requirements of the contract. Contractor shall incur all costs associated with fulfilling this contingency plan at no additional expense to the Government. Contractor shall be liable for all expenses incurred by the Government due to the contractor's inability to perform in accordance with these requirements.
Contractor is required to identify any subcontractors and suppliers. Contractor is responsible for supervision, contract compliance and obtaining any necessary documentation from their subcontractors or supplies performing under this contract. If the contractor intends to utilize subcontractors and suppliers other than those initially identified, operating licenses, permits, certificates and any other forms required by regulatory agencies for the new facility must be submitted to the Contracting Officer no later than thirty (30) days prior to change. Any and all cost increases to meet additional regulatory requirements caused by such change of disposal facilities or any other contractor action relative to transport, storage, and/or disposal of regulated medical waste shall be borne by the contractor.

Contractor Personnel: The contractor shall provide a contract manager who is responsible for the performance/coordination of work defined in this contract. The name and phone numbers (during and after hours) of this person and alternate(s), who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer no later than fifteen (15) days prior to the contract start date. The contract manager and alternate(s) shall be able to understand, read, fluently speak, and legibly write the English language. This person may perform services under this contract in addition to contract management duties. The contract manager or alternate shall have full authority to act for the contractor in all contractual matters relating to daily operation of this contract. All changes must be provided in writing to the Contracting Officer no later than forty-eight (48) hours prior to the implementation of such changes.

PERSONNEL POLICY: The Contractor shall assume full responsibility for protection of the personnel furnishing services under this contract. To carry out this responsibility, the Contractor shall provide the following for these personnel:

Workers compensation
General liability insurance in a minimum amount of $500,000.00.
Income tax withholding, and
Social security payments

PROTECTION OF GOVERNMENT PROPERTY: During work execution, the Contractor shall take special care to protect Government property including interior and exterior buildings, furniture, walls, baseboards, and other surfaces. Damage resulting from Contractor operations shall be repaired by the Contractor, including painting, refinishing, or replacement (if necessary), at no additional cost to the Government. Contractor shall be responsible to meet all OSHA/Safety requirements in the performance of the work. This shall include but not be limited to taking all the necessary precautions to protect the patients, visitors and/or staff at each location. Contractor shall be held responsible for any injuries and/or damage, which may be caused as a result of the Contractors failure to adhere to these requirements.

PRE-AWARD SURVEY: Prior to the beginning of the performance of this contract, the VA may conduct a pre-award survey to assess the Contractor on the following conditions:

Overall safety and sanitation of processing facility
Evidence of applicable licenses
Manifest tracking techniques and storage
Ability to provide continuous, uninterrupted service
Failure of adequate performance of any of the above pre-award aspects may be taken into consideration during the Technical Evaluation process in determining the offeror s ability to successfully perform the services.

PERMITS AND RESPONSIBILITIES: The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and Municipal laws, codes, and regulations in connection with the prosecution of the work. This includes acquiring any installation listed in this contract. He shall be similarly responsible for all damages to persons or property. He shall take proper safety and health precautions to protect the work, the workers, the public and the property of others. He shall also be responsible for all materials delivered and work per-formed until completion and acceptance of the entire work.

QUALITY ASSURANCE PLAN: The contractor shall have a Quality Control Program to ensure the requirements of this contract are provided as specified. The Contractor shall be liable for all expenses incurred by the Government due to the Contractor s inability to perform in accordance with these requirements. The contractor will be expected to meet all the needs of the contract and required to provide a Quality plan describing how they will meet the needs of this contract. The program shall include, but will not be limited to, the following:

An inspection system covering the services listed in the Statement of Work. It must specify areas of work to be inspected on a scheduled basis.
A method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable.
A record of all inspections conducted by the contractor and any corrective action taken. The documented Quality Control Program and records of inspections shall be made available to the Government upon request.

COMMUNICATION: The contractor shall explain the communication plan for employees and subcontractors. Highly functional and efficient data and voice communications are critical for successfully performing the contract requirements. The Contractor must be capable of sending and receiving e-mails and faxes, communicate with the Project Manager, communicate with service vehicles regularly to determine locations and relay service-related messages, and send/receive electronic data files. Communication shall be critical in ensuring no interruption of services. Communication shall include how waste will be collected, manifested, and treated. It is important that the biomedical waste be collected every 28 days, and the incinerate only waste is properly handled. Communication shall be very important to ensure compliance.

PROJECT MANAGEMENT: Contractor shall provide a highly qualified project manager with strong support from corporate management as this shall be essential to successfully performing these requirements day to day over an extended period of time. This plan shall identify the organizational structure proposed to direct these operations. The management team members shall be identified along with a description of qualifications and relative experience. The methods and procedures used to carry out this plan shall be specified, including the problem resolution procedures to be used in the event of service related or personnel problems. The Contractor shall identify the types of employee incentives used to encourage quality performance by Contractor staff. The plan shall specify the manager that shall be designated to meet with the Contracting Officer, at the Government s convenience, for scheduled and impromptu meetings to discuss contractual issues. Resumes shall be provided for all members of the project management team and other key personnel requiring special skills. Contractors should not view this as simply a trash disposal service. This requirement is broad and diverse and requires an integrated, involved management approach to deliver these services successfully.

CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, AND INFORMATION: Contractor shall, at no additional cost to the Government, provide and maintain licenses, permits, vehicles, operators, equipment, and materials to properly handle, package, label, transport, and dispose of medical sharps waste generated at VAMC-SLVHCS. Contractor is responsible for maintaining liability insurance for the duration of the contract.

HEALTH & SAFETY: The Health and Safety plan shall demonstrate a good working knowledge of the US DOT, US Occupational Health and Safety (OSHA), State of Louisiana Department of Health and other applicable regulations that govern the health and safety risks involved in the handling and shipping of regulated medical waste. All tasks with potential health and safety risks shall be identified along with the proposed control measures to ensure minimal exposure to minimize risk. The Contractor agrees that his personnel and equipment are subject to safety inspections by Government personnel while on Federal property.

REPORTS: The Contractor must demonstrate the reports that shall be provided to measure the reductions that are achieved in the volumes of waste. The Contractor shall provide this/these report(s) monthly. The report(s) must demonstrate the objectives that are being met, and action plans for the objectives that have not been achieved. The Contractor must explain how this shall be measured to ensure tracking that is consistent and accurate. The contractor shall be required to provide a waste audit report at least once per year. This report shall identify opportunities for reduction, health & safety risks, equipment reviews, and training requirements to achieve opportunities identified in the audit.

CAPABILITIES AND RELEVANT CORPORATE EXPERIENCE: The contractor shall describe the abilities of the contractor and any subcontractors to perform this work plus relevant experience. References to current or previous clients to whom similar services were or are being provided shall be included. Experience most relevant to this solicitation would be managing and providing a comprehensive waste and services program, including the required training and compliance services, similar to this requirement. Experience providing a comprehensive waste management program for an industrial generator or a residential area is less relevant; the services should be specific to a hospital due to the unique needs and training requirements that face these facilities.
Capabilities shall be described in terms of equipment, management experience, qualified personnel, knowledge of the business and an organizational structure that is flexible and responsive enough to direct and support the services required herein. Strong capabilities would consist of demonstrating the available corporate financial resources, equipment, experienced management team and demonstrated experience of successfully managing a contract with complexities of service.

ADMINISTRATION:
Facility Orientation: An initial orientation of the facilities will be conducted by the COR at the start of the contract. The contractor shall be responsible for conducting orientation for new employees thereafter.
Accident Reporting: In the event an accident occurs on the Department of Veterans Affairs property or involving Government personnel or property, the contractor shall contact the VA Police immediately. A report shall be provided to the Contracting Officer and COR in writing that shall include the following: (1) the time and date of occurrence; (2) the place of occurrence; (3) a list of personnel directly involved; and (4) a narrative or description of the accident to include chronological order of the accident and circumstances; (5) corrective action to prevent future occurrences.
Locations: The government reserves the right to modify the contract as needed to add or delete VA Locations.
Contractor is to provide a documented back up plan in the event circumstances disrupt this ability to provide pick up services. Services will be provided within 24 hours of a failure to meet scheduled pick-up times.
Normal operating hours of the facilities vary from location to location. COR shall provide this information to the successful Contractor during the pre-work orientation. FEDERAL HOLIDAYS OBSERVED BY THE VAMC ARE:
New Years' Day Labor Day
Martin Luther King Day Columbus Day
Presidents' Day Veterans' Day
Memorial Day Juneteenth
Independence Day Thanksgiving Day
Christmas Day

Invoice: Payment will be made upon receipt of a properly prepared, itemized invoice, validated by the COR, and submitted through the Tungsten System.

A properly prepared invoice will contain:
Invoice Number and Date
Contractor s Name and Address
Accurate Purchase Order Number
Itemization of pounds recycled and disposed
Price per pound
Dates service performed
Location of service performed
Total amount due
A separate invoice will be prepared for each facility.
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 715 SOUTH PEAR ORCHARD RD., PLAZA 1
  • RIDGELAND , MS 39157
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Mar 5, 2026[Combined Synopsis/Solicitation (Original)] S205--629-26-2-622-0217 Solid Waste Contract
Mar 17, 2026[Combined Synopsis/Solicitation (Updated)] S205--629-26-2-622-0217 Solid Waste Contract
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Solicitation Detail For Solicitation Number - N40442-08-T-5418 RFP/RFQ Number: N40442-08-T-5418 Subscribe to Amendment

Military Sealift Command

Bid Due: 9/29/2028

Home NOTICE OF FARM LEASE The Lake County Par NOTICE OF FARM LEASE

MPN

Bid Due: 8/15/2069

Home NOTICE OF INTENT TO SELL BONDS $2,000,000 GEN NOTICE OF INTENT TO

MPN

Bid Due: 5/04/2075

Home Notice to Bidders Notice is hereby given Notice to Bidders Notice is

MPN

Bid Due: 9/07/2077

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.