| Location: | Texas |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Feb 24, 2026 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-ENG-40 |
| Publication URL: | To access bid details, please log in. |
FY25-ENG-40
Posted
Lorena Lopez
(956) 791-7342
lllopez@ci.laredo.tx.us
2/24/2026
4:00 PM
M2400
21+ Days for Solicitation Notice
CTCD
2/3/2026
2/3/2026 10:59 am
74521-Asphaltic Concrete, Hot Laid Including Bituminous Materials;
91319-Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal);
91347-Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps);
District 22,
This project consists of constructing a right turn lane at the North East intersection of Shiloh and McPherson. The right turn lane will consist of constructing a 3,900 SF of 8" thick reinforced concrete travel lane with asphalt overlay. In addtion to this, 2,050 SF of concrete sidewalk and 350 SF of concrete driveway will be added. Finally, utility relocation of water valves, utility poles, traffic poles, and storm drain inlet will be adjusted.

With GovernmentContracts, you can:
...FM 1173 UTILITY RELOCATION PROJECT PROJECT MANUAL FOR FM 1173 UTILITY RELOCATION PROJECT ...
City of Krum
Bid Due: 6/18/2026
...FM 1173 UTILITY RELOCATION PROJECT BID SET FOR FM 1173 UTILITY RELOCATION PROJECT ...
City of Krum
Bid Due: 6/18/2026
...Project: 48" WATER TRANSMISSION MAIN RELOCATION PROJECT AND WATER AND WASTEWATER MAIN REPLACEMENTS...
City of Dallas
Bid Due: 6/26/2026
...Project: 48" WATER TRANSMISSION MAIN RELOCATION PROJECT AND WATER AND WASTEWATER MAIN REPLACEMENTS... ...
City of Dallas
Bid Due: 6/26/2026