| Location: | Arizona |
|---|---|
| Posted: | Aug 18, 2025 |
| Due: | Aug 26, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000006 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
TOTAL SMALL BUSINESS SET-SIDE
This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking.
PRINCIPAL WORK ITEMS:
20401-0000 Roadway Excavation: 7,000 CUYD
25902-0000 Soil Nail Retaining Wall: 8,200 SQFT
30202-2000 Roadway Aggregate, Method 2: 1,800 TON
40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON
60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT
60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT
60906-1000 Gutter, Concrete (Ditch): 750 SQYD
61501-0800 Sidewalk, Concrete: 1,100 SQYD
63501-0000 Temporary Traffic Control: LPSM
64603-1000 Fixture, Vault Toilet: 2 EACH
ANTICIPATED SCHEDULE:
Advertisement – July 2025
Award – September 2025
NTP – September 2025
Contract Completion – May 2026
The estimated price range of the project work is between $5 million and $10 million.
| May 15, 2025 | [Presolicitation (Original)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Jul 15, 2025 | [Solicitation (Original)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 7, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 12, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 13, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 20, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 22, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 26, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Sep 5, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |