| Location: | Utah |
|---|---|
| Posted: | Jun 9, 2025 |
| Due: | Jun 16, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | HC102825R0039 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
09 June 2025 - Added attachment, QA - RFP HC102825R0039.
20 May 2025 - Added "Pre-Proposal Site Visit Instructions Ogden Utah - Rev 1.1".
This action is open to SDVOSB only. Any reference to 8(a) will be removed at a later date.
Scope. Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, and carpet - as described in this PWS and as shown on the Design Intent Drawings (Appendix A). Work shall occur throughout various administrative and office areas of Data Center Ogden, which will remain in operation during the project. Phasing of Contractor’s operations will be required to minimize the impact on DISA’s mission. Approximately one-half of the various types of spaces (private offices, open offices, conference rooms, etc.) will need to be available at any phase of the project.
Task 1 - Project Management. Project Schedule, Existing Conditions, Submittals, General Requirements.
Task 2 – Electrical and Communication Systems. Prior to removal of furniture, disconnect electrical and communication systems from workstations and demountable partition. After installation of new carpet tiles and furniture, connect new workstations and print stations to electrical and communication systems.
Task 3 - Furniture demolition. Remove existing furniture, cubicle workstations, semi-private offices, and demountable partition per PWS, and the Design Intent Drawings (Appendix A). This task includes disconnection of electrical and communication systems from the workstations and demountable partition.
Task 4 – Carpet and Wall Base Replacement. Remove existing carpet tiles and wall base. Install new carpet tiles and wall base. Work shall be per the PWS, the Design Intent Drawings (Appendix A), and DISA’s Carpet Tile Specification (Appendix G).
Task 5 – Furniture Installation. Install new furniture; workstation cubicles, semi-private offices, seating, etc.) per the PWS, the Design Intent Drawings (Appendix A), and the Furniture Installation and General Requirements (Appendix B). This task shall include connecting the workstations to electrical and communication systems to provide fully operational workstations.
Task 6 - Project Close-Out. Provide spare materials and documentation.
Accessing Protected Proposal Documents:
The Access Request Link is located below Attachments/Links header.
If you cannot request RFP HC102825R0039 protected document access:
-Are you logged into SAM?
-Are you a registered SAM Point of Contact within your organization?
-Is your organization represented by NAICS 337214?
-Is your organization a certified Service Disabled Veteran-Owned Small Business, SDVOSB?
RFP HC102825R0007 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support.
Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations.
| May 15, 2025 | [Solicitation (Original)] Furniture Systems and Carpet Replacement - Data Center Ogden |
| May 16, 2025 | [Solicitation (Updated)] Furniture Systems and Carpet Replacement - Data Center Ogden |
| May 21, 2025 | [Solicitation (Updated)] Furniture Systems and Carpet Replacement - Data Center Ogden |
| Jun 10, 2025 | [Solicitation (Updated)] Furniture Systems and Carpet Replacement - Data Center Ogden |
| Jun 11, 2025 | [Solicitation (Updated)] Furniture Systems and Carpet Replacement - Data Center Ogden |
| Jun 12, 2025 | [Solicitation (Updated)] Furniture Systems and Carpet Replacement - Data Center Ogden |
| Jun 16, 2025 | [Solicitation (Updated)] Furniture Systems and Carpet Replacement - Data Center Ogden |

With GovernmentContracts, you can:
Project: Towing Service Provider Ref. #: WVC PD 26-01 Department: CITIES - West
State Government of Utah
Bid Due: 6/04/2026
Project: Beaver County School District -Asphalt Sealcoat Minersville School Ref. #: RFP26-187 Department:
State Government of Utah
Bid Due: 6/09/2026
Project: Request for Information - Roads, Trails, Storm Drain Systems, and Winter Maintenance
State Government of Utah
Bid Due: 6/22/2026
Follow Dugway Proving Ground Environmental Support / Central Hazardous Waste Services - RFP
DEPT OF DEFENSE
Bid Due: 6/15/2026