| Location: | Georgia |
|---|---|
| Posted: | Mar 6, 2025 |
| Due: | Apr 2, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77078-NONST-2025-000000009 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77078-NONST-2025-000000009 | Grapevine Drainage Improvements (PE24270) | Jenkins County Board Of Commissioners |
Mar 06, 2025 @ 04:15 PM
|
Apr 02, 2025 @ 11:00 AM
|
Start Date: Mar 06, 2025 @ 04:15 PM ET
End Date:
Apr 02, 2025 @ 11:00 AM ET
Sealed bids for construction of Grapevine Road Drainage Improvements will be received until April 2nd, 2025 at 11:00 AM at the Jenkins County Commissioners Office at 833 Winthrope Avenue, Millen, GA 30442 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of thirty (30) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Drainage improvements including (3) 72¿ CMP including but not limited to headwalls, wingwalls, rip-rap, grassing, erosion control measures, and miscellaneous construction. Time allotted for final completion of work is ninety (90) calendar days. Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. Funding is to be provided by the Jenkins County Commissioners.
| Code | Description |
| 91345 | Construction, Sewer and Storm Drain |
| 91381 | Maintenance and Repair, Sewer and Storm Drain, Including Removal |
Lindsey Bashlor
lindsey@parker-engineering.com
912-764-7722

With GovernmentContracts, you can:
...; and installing concrete patch material. Bridge painting (clean and repaint beams). Add ...
State Government of Georgia
Bid Due: 6/25/2026